Contractor dossier
183 projects on file, including joint ventures this contractor is part of.
Total projects
183
Total budget
₱7.9B
Average progress
97.9%
Completion rate
95.1%
Average risk score
37.3
Medium risk on average, out of 100
Flagged as unusual
4
2.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 182 | ₱7.7B | 37.1 | 4 | 97.9% |
| Region VIII | 1 | ₱193M | 64.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 113 | ₱4.5B | 35.6 | 1 | 97.3% |
| Flood Control and Drainage | 50 | ₱2.8B | 40.7 | 2 | 99.7% |
| Buildings and Facilities | 10 | ₱186.1M | 20.5 | 0 | 100.0% |
| Bridges | 4 | ₱48.6M | 34.9 | 0 | 100.0% |
| OTHER | 3 | ₱185.3M | 69.5 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱96.5M | 94.8 | 1 | 54.7% |
| GAA 2025 OO-2 | 1 | ₱48.3M | 88.1 | 0 | 89.8% |
| Bridges, Roads | 1 | ₱48M | 33.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 25CJ0025CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DUNGUN CREEK, PACKAGE 25, PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱48.3M | 90% | High risk88 | —-0.020 |
| 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 20CK0070ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG CONCEPCION - CAPAS ROAD, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.064 |
| 17CJ0032ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4); TARLAC-GUIMBA RD VIA VICTORIA K0127+(-219) | Region III | Tarlac DEO | Completed | ₱67.5M | 100% | High risk70 | —-0.063 |
| 17CJ0063NETWORK DEVELOPMENT, IMPROVEMENT/ WIDENING OF NATIONAL ROADS, TARLAC - GUIMBA ROAD VIA VICTORIA, KO133+000 - KO136+000; KO144+989.80 - KO146+963.80 | Region III | Tarlac DEO | Completed | ₱80.1M | 100% | High risk70 | —-0.057 |
| 24CJ0376CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, LEFT DIKE, PACKAGE F, STA. MARIA - SAN BARTOLOME SECTION, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.010 |
| 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 20CJ0071NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STA. IGNACIA - GUIMBA ROAD VIA GERONA PURA, (GERONA SECTION), TARLAC | Region III | Tarlac DEO | Completed | ₱65.5M | 100% | High risk70 | —-0.035 |
| 23CJ0332CONSTRUCTION OF FLOOD CONTROL STRUCTURES WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG UNGOT CREEK PACKAGE R, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | High risk70 | —-0.014 |
| 24CJ0374CONSTRUCTION OF SLOPE PROTECTION STRUCTURES WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES - TARLAC RIVER CONTROL, PACKAGE T, BALANTI SECTION, BALANTI, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.011 |
| 19CJ0122NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GERONA-VICTORIA ROAD VIA ESTIPONA PURA, TARLAC | Region III | Tarlac DEO | Completed | ₱56.2M | 100% | High risk69 | —-0.037 |
| 17CJ0034NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; VICTORIA - PURA RD, KO153+281 - KO153+611; KO148+675 - KO151+336 & KO151+431-KO152+471 | Region III | Tarlac DEO | Completed | ₱63.6M | 100% | High risk69 | —-0.038 |
| 24CJ0366CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES RIVER, PACKAGE G, TIBAGAN SECTION , TIBAGAN, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk69 | —-0.013 |
| 16CK0163ASSETS PRESERV. OF NATL RD., REHAB/RECONST/UPGRADING OF DAMAGED PAVE NATL RD INCL. DRAINAGE BASED ON | Region III | Tarlac 2nd DEO | Completed | ₱35.3M | 100% | High risk66 | —-0.067 |
| 16CK0189ASSETS PRESERV. OF NATL RDS-REHAB/RECONST OF NATL RDS W/ SLIPS, SLOPE COLLAPSE & LAND SLIDE ALONG | Region III | Tarlac 2nd DEO | Completed | ₱32.4M | 100% | High risk66 | —-0.067 |
| 18I00028ROAD WIDENING - PRIMARY ROADS: DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO), KO690+000-KO690+565; KO679+(-056)-KO680+133; KO680+163.60-KO680+572; KO680+596-KO680+879; KO680+909-KO682+330; KO682+345-KO684+389; KO684+423-KO685+000, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱193M | 100% | High risk65 | —-0.059 |
| 24CJ0392CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE G) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
| 24CJ0393CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE F) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 23CK0115CONCRETING OF ROAD AT BRGY. CUT-CUT II - BRGY. ANUPUL (PHASE I), CAPAS AND BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱75.6M | 88% | Medium risk43 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 17CJ0182CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES, LAWACAMULAG BR. (BO4329LZ) ALONG TARLAC CITY - SAN JOSE VIA TIBAG - BURGOS ROAD | Region III | Tarlac DEO | Completed | ₱4.3M | 100% | Low risk30 | —-0.035 |
| 127 | 19CJ0071ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS TARLAC-GUIMBA RD VIA VICTORIA - K0142 + 234 - K0143 + 140 | Region III | Tarlac DEO | Completed | ₱14M | 100% | Low risk30 | —-0.102 |
| 128 | 20CJ0108CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BRGY. ROAD IN BRGY. SAN ROQUE NORTH, ANAO, TARLAC | Region III | Tarlac DEO | Completed | ₱9.5M | 100% | Low risk30 | —-0.102 |
| 129 | 18CJ0025CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER CONTROL (LEFT DIKE), PAO 2ND SECTION, PAO 2ND, CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱31.7M | 100% | Low risk30 | —-0.086 |
| 130 | 18CJ0044CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, LEFT DIKE, STA. 0+000 - STA. 0+154, SAN BARTOLOME SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱18.6M | 100% | Low risk30 | —-0.088 |
| 131 | 20CJ0107CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BRGY. ROAD IN BRGY. SAMPUT, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱9.5M | 100% | Low risk30 | —-0.100 |
| 132 | 23CJ0067BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY SAN ROQUE, MONCADA, TARLAC | Region III | Tarlac DEO | Completed | ₱9.9M | 100% | Low risk30 | —-0.104 |
| 133 | 19CH0009CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION ALONG CAULAMAN RIVER, CARMENCITA, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱39.1M | 100% | Low risk30 | —-0.089 |
| 134 | 22CJ0010SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER LEFT BANK, PAO 3RD - PAO 2ND SECTION, CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱43.2M | 100% | Low risk30 | —-0.086 |
| 135 | 22CJ0013SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL RIGHT DIKE, DICOLOR SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱37.4M | 100% | Low risk30 | —-0.087 |
| 136 | 22CJ0055BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD IN BARANGAY SAN JOSE NORTH (GUERRERO ROAD), ANAO, TARLAC | Region III | Tarlac DEO | Completed | ₱9.6M | 100% | Low risk30 | —-0.100 |
| 137 | 18CJ0186ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS PANIQUI POBLACION RD - K0144 + (-022) - K0144 + 196, K0144 + 196 - K0144 + 351.46 | Region III | Tarlac DEO | Completed | ₱11.3M | 100% | Low risk30 | —-0.102 |
| 138 | 19CJ0028FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL LEFT DIKE, TIBAGAN - TIBAG SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱41.9M | 100% | Low risk30 | —-0.089 |
| 139 | 18CJ0010CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL LEFT DIKE, TIBAG SECTION, TIBAG, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱23.3M | 100% | Low risk29 | —-0.090 |
| 140 | 21CJ0039LOCAL INFRASTRUCTURE PROGRAM CONCRETING OF ROAD, BARANGAYS. SAN MIGUEL, STA. MARIA, LANAT, SAN MANUEL, TARLAC | Region III | Tarlac DEO | Completed | ₱9.9M | 100% | Low risk29 | —-0.101 |
| 141 | 18CJ0184BRIDGE PROGRAM WIDENING OF PERMANENT BRIDGES PANCE BR. (B01823LZ) ALONG ANAO-RAMOS RD | Region III | Tarlac DEO | Completed | ₱24.9M | 100% | Low risk29 | —-0.066 |
| 142 | 21CJ0030ASSET PRESERVATION PROGRAM CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS VICTORIA - PURA RD - K0151 + 288.64 - K0151 + 414.64, K0151 + 435.44 - K0151 + 561 | Region III | Tarlac DEO | Completed | ₱7.1M | 100% | Low risk29 | —-0.103 |
| 143 | 22CJ0092BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD IN BARANGAY BALAOANG, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱9.6M | 100% | Low risk29 | —-0.102 |
| 144 | 22CJ0021SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. PACPACO, SAN MANUEL, TARLAC | Region III | Tarlac DEO | Completed | ₱9.6M | 100% | Low risk29 | —-0.102 |
| 145 | 18CJ0099LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF SLOPE PROTECTION ALONG TARLAC RIVER, CENTRAL LEFT DIKE, SEMBRANO SECTION (PHASE 2), GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱42.3M | 100% | Low risk29 | —-0.088 |
| 146 | 19CJ0037FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, SANTIAGO-SAN BARTOLOME SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱32.1M | 100% | Low risk29 | —-0.088 |
| 147 | 18CJ0042CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL LEFT DIKE, SANTIAGO-SAN BARTOLOME SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱23.3M | 100% | Low risk29 | —-0.088 |
| 148 | 20CJ0116LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF BARANGAY ROAD, BARANGAY ABOGADO, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱4.9M | 100% | Low risk29 | —-0.098 |
| 149 | 18CJ0009CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN JOSE-SANTIAGO SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱27.9M | 100% | Low risk29 | —-0.088 |
| 150 | 18CJ0008CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN JOSE SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱21.4M | 100% | Low risk29 | —-0.088 |