Contractor dossier
170 projects on file, including joint ventures this contractor is part of.
Total projects
170
Total budget
₱6.1B
Average progress
97.3%
Completion rate
90.0%
Average risk score
53.0
Medium risk on average, out of 100
Flagged as unusual
3
1.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 155 | ₱5.2B | 53.1 | 2 | 97.6% |
| Region IV-B | 15 | ₱837.2M | 51.3 | 1 | 94.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 84 | ₱3.3B | 53.4 | 0 | 99.5% |
| Buildings and Facilities | 37 | ₱780.4M | 42.3 | 0 | 100.0% |
| Flood Control and Drainage | 25 | ₱999.9M | 49.3 | 0 | 100.0% |
| Bridges | 6 | ₱168.7M | 50.8 | 0 | 68.4% |
| OTHER | 5 | ₱298.4M | 76.2 | 1 | 81.7% |
| GAA 2025 OO-1 | 4 | ₱214.6M | 93.5 | 0 | 91.1% |
| GAA 2025 SSP | 3 | ₱106.6M | 94.7 | 2 | 72.7% |
| GAA 2025 OO-2 | 2 | ₱19.2M | 88.0 | 0 | 94.3% |
| Bridges, Roads | 2 | ₱123.8M | 53.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱12.3M | 45.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0011NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CATANAUAN DIVERSION ROAD, QUEZON (PACKAGE 6), QUEZON, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱94.6M | 95% | High risk96 | —-0.005 |
| 25DM0138CONSTRUCTION OF FLOOD MITIGATION, STRUCTURE ALONG BINGABING CREEK, BRGY. MADULAO, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 58% | High risk95 | Flagged0.008 |
| 25DM0147CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. MADULAO, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.008 |
| 25DL0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUMACA BY-PASS ROAD, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48M | 94% | High risk94 | —-0.013 |
| 25DM0077CONSTRUCTION OF ROAD, SITIO PIER, BARANGAY SAN ANTONIO PALA, MUNICIPALITY OF CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.6M | 100% | High risk94 | —-0.008 |
| 25DM0005ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0279 + 000 - K0280 + 000, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱33.6M | 100% | High risk92 | —-0.014 |
| 25DM0007ASSET PRESERVATION PROGRAM -REHABILITATION /RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0281+ 056 - K0281 + 117, K0281 + 188 - K0281 + 251, K0285+700 - K0286+100, MULA | Region IV-A | Quezon 3rd DEO | On-Going | ₱38.4M | 76% | High risk92 | —-0.006 |
| 25DL0151ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.6M | 94% | High risk88 | —-0.031 |
| 25DL0146ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BREAKWATER, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.6M | 95% | High risk88 | —-0.031 |
| 24DL0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 59. CONSTRUCTION OF MULTI-PURPOSE BUILDING, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱94.1M | 97% | High risk79 | —-0.003 |
| 23EA0068CONSTRUCTION OF MULTI-PURPOSE BUILDING (AMPHITHEATER) PULANG LUPA, BRGY. BOLO, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | On-Going | ₱49.5M | 21% | High risk79 | Flagged0.032 |
| 17DL0088A. MFO 1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 1. SECONDARY ROADS A. GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0198+-1528-K0198+-1261 (B/S), K0198+ | Region IV-A | Quezon 4th DEO | Completed | ₱56.4M | 100% | High risk76 | —-0.038 |
| 24DM0155CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVENTION CENTER), BARANGAY POCTOL, MUNICIPALITY OF PITOGO, QUEZON, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱49.5M | 90% | High risk76 | —-0.008 |
| 16DJ0068CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW, CANDELARIA BY-PASS ROAD, QUEZON 2ND LD CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱48.9M | 100% | High risk72 | —-0.042 |
| 17D00026ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG MSR JCT-LOPEZ-CATANAUAN ROAD, K0248+912-K0250+790 & K0250+816-K0254+275, CATANAUAN, QUEZON | Region IV-A | Region IV-A | Completed | ₱144.3M | 100% | High risk71 | —-0.048 |
| 17D00023ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD K0266+025 - K0266+838, K0269+862-K0270+088 & | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk71 | —-0.044 |
| 17D00024ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD, K0262+323-K0266+025, BUENAVISTA, QUEZON | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk71 | —-0.045 |
| 17D00025ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL STRATEGIES TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD, K0272+067-K0275+840, BUENAVISTA, QUEZON | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk71 | —-0.048 |
| 17DM0051ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA RD - K0275 + 840 - K0277 + 487, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱63.5M | 100% | High risk69 | —-0.069 |
| 17DL0091A. MFO -1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 1. SECONDARY ROADS C. MSR JCT-LOPEZ-BUENAVISTA RD- K0219+848 - K0220+313, K0228+083 - K0228+683 | Region IV-A | Quezon 4th DEO | Completed | ₱51.9M | 100% | High risk68 | —-0.070 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23EA0068CONSTRUCTION OF MULTI-PURPOSE BUILDING (AMPHITHEATER) PULANG LUPA, BRGY. BOLO, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | On-Going | ₱49.5M | 21% | High risk79 | Flagged0.032 |
| 25DM0138CONSTRUCTION OF FLOOD MITIGATION, STRUCTURE ALONG BINGABING CREEK, BRGY. MADULAO, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 58% | High risk95 | Flagged0.008 |
| 25DM0147CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. MADULAO, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 19DC0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL-LAKE CIRCUMFERENTIAL ROAD (BALETE SECTION)), BALETE, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱72.4M | 100% | Medium risk58 | —-0.097 |
| 52 | 21DM0065NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CATANAUAN DIVERSION ROAD, QUEZON,CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱72.4M | 100% | Medium risk55 | —-0.077 |
| 53 | 19DM0024NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CATANAUAN DIVERSION ROAD, QUEZON (PACKAGE 1), CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱80.5M | 100% | Medium risk54 | —-0.092 |
| 54 | 23DL0113ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 2. GUMACA BY-PASS ROAD, QUEZON, PACKAGE B | Region IV-A | Quezon 4th DEO | Completed | ₱86.9M | 100% | Medium risk54 | —-0.096 |
| 55 | 24DL0146ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 3. GUMACA BY-PASS ROAD, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.100 |
| 56 | 24DL0014ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 2. GUMACA BY-PASS ROAD, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱57.9M | 100% | Medium risk54 | —-0.101 |
| 57 | 17DM0016CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE , SAN VICENTE BR. (B02952LZ) ALONG PADRE BURGOS-POTOTANIN JCT ROAD, BARANGAY SAN VICENTE, PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱5.8M | 100% | Medium risk53 | —-0.037 |
| 58 | 20DL0015D. LOCAL PROGRAM 1. NATIONAL BUILDING PROGRAM A. BUILDING AND OTHER STRUCTURES 4. CONSTRUCTION OF TWO-STOREY BUILDING (DPWH STANDARD DESIGN) OF QUEZON 4TH DISTRICT ENGINEERING OFFICE INCLUDING OTHER FACILITIES, GUMACA, QUEZON (PHASE I) | Region IV-A | Quezon 4th DEO | Completed | ₱52.5M | 100% | Medium risk53 | —-0.095 |
| 59 | 20DK0004CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG AGOS RIVER, GENERAL NAKAR, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.083 |
| 60 | 19DK0079CONSTRUCTION OF BYPASS AND DIVERSION ROAD, MAUBAN BYPASS ROAD (PACKAGE A) MAUBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱51.4M | 100% | Medium risk53 | —-0.083 |
| 61 | 23DL0101ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 5. CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE ALONG PIPISIK RIV | Region IV-A | Quezon 4th DEO | Completed | ₱82M | 100% | Medium risk53 | —-0.080 |
| 62 | 22EA0211NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, DR. DAMIAN REYES MEMORIAL ROAD, STA. 36+890 - STA. 37+860 | Region IV-B | Marinduque DEO | Completed | ₱96M | 100% | Medium risk52 | —-0.075 |
| 63 | 22EA0138CONSTRUCTION OF BALOGO-KILO-KILO ROAD, STA. CRUZ, MARINDUQUE, PHASE 2 | Region IV-B | Marinduque DEO | Completed | ₱99M | 100% | Medium risk52 | —-0.079 |
| 64 | 22EA0209NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, DR. DAMIAN REYES MEMORIAL ROAD, (PHASE 3), BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱96.5M | 100% | Medium risk52 | —-0.076 |
| 65 | 20DK0145CONSTRUCTION OF NEW MUNICIPAL BUILDING , LUCBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱48.3M | 100% | Medium risk52 | —-0.047 |
| 66 | 21DK0002NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAUBAN BY-PASS ROAD (PACKAGE C) QUEZON, MAUBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱48.5M | 100% | Medium risk51 | —-0.104 |
| 67 | 21DL0081ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUMACA BY-PASS ROAD, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱48M | 100% | Medium risk51 | —-0.103 |
| 68 | 23DL0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 1. GUMACA BY-PASS ROAD, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱49.4M | 100% | Medium risk51 | —-0.103 |
| 69 | 24DL0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 61. CONSTRUCTION OF MULTIPURPOSE FACILITY, GUMACA, QUEZON (PHASE III) | Region IV-A | Quezon 4th DEO | On-Going | ₱39.6M | 100% | Medium risk50 | —-0.062 |
| 70 | 21DK0078CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG AGOS RIVER, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 71 | 18DL0277COMPLETION AND UPGRADING OF DOÑA MARTA MEMORIAL DISTRICT HOSPITAL, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱47.6M | 100% | Medium risk49 | —-0.046 |
| 72 | 23DM0097CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL BUILDING ANNEX), POBLACION, BARANGAY 9, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱39.6M | 100% | Medium risk48 | —-0.086 |
| 73 | 25D00080WIDENING OF PERMANENT BRIDGES VILLA PADUA BR. (B02578LZ) ALONG MAHARLIKA HIGHWAY | Region IV-A | Region IV-A | On-Going | ₱42.6M | 6% | Medium risk48 | —-0.009 |
| 74 | 25D00102WIDENING OF PERMANENT BRIDGES SAN VICENTE BR. (B02584LZ) ALONG MAHARLIKA HIGHWAY | Region IV-A | Region IV-A | On-Going | ₱32.2M | 5% | Medium risk48 | —-0.009 |
| 75 | 19DL00591. FLOOD MANAGEMENT PROGRAM A. CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 6. REHABILITATION/RECONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES ALONG PIPISIK RIVER, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱46.8M | 100% | Medium risk48 | —-0.085 |