73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱8.6B
Average progress
92.6%
Completion rate
83.6%
Average risk score
50.8
Medium risk on average, out of 100
Flagged as unusual
29
39.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 26 | ₱490.1M | 31.6 | 11 | 99.8% |
| Cordillera Administrative Region | 16 | ₱712.4M | 54.6 | 11 | 93.8% |
| Central Office | 13 | ₱5.3B | 75.2 | 6 | 70.9% |
| Region VII | 7 | ₱176.2M | 47.1 | 0 | 100.0% |
| Region I | 5 | ₱382.2M | 63.8 | 0 | 100.0% |
| Region III | 3 | ₱366.5M | 70.0 | 0 | 100.0% |
| National Capital Region | 2 | ₱1.1B | 63.0 | 1 | 70.8% |
| Negros Island Region | 1 | ₱64.3M | 54.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 27 | ₱5.8B | 62.8 | 16 | 85.8% |
| Roads | 23 | ₱924.5M | 50.5 | 1 | 95.7% |
| Buildings and Facilities | 16 | ₱1.5B | 29.1 | 12 | 96.4% |
| Bridges | 6 | ₱323.3M | 52.2 | 0 | 100.0% |
| OTHER | 1 | ₱120.3M | 76.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17CD0157CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, VALENZUELA-OBANDO-MEYCAUAYAN FLOOD CONTROL PROJECT, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱144.7M | 100% | High risk80 | —-0.038 |
| 17Z00012CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Central Office | Flood Control Management Cluster | On-Going | ₱934M | 99% | High risk77 | Flagged0.017 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 17OF0198CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Central Office | Flood Control Management Cluster | On-Going | ₱247.1M | 40% | High risk77 | Flagged0.031 |
| 16Z00020CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Central Office | Flood Control Management Cluster | On-Going | ₱942.7M | 12% | High risk77 | Flagged0.045 |
| 16C00084FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱376.8M | 72% | High risk77 | Flagged0.028 |
| 18C00050REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱285.9M | 100% | High risk77 | —-0.025 |
| 18C00047FLOOD CONTROL WORKS-ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱761M | 100% | High risk77 | —-0.005 |
| 17C00053CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, FLOOD CONTROL WORKS - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱193M | 100% | High risk77 | —-0.044 |
| 18C00015NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, ANGELES-PORAC-FLORIDABLANCA -DINALUPIHAN ROAD, PAMPANGA 2ND LEGISLATIVE DISTRICT, RPOVINCE OF PAMPANGA | Region III | Region III | Completed | ₱120.3M | 100% | High risk77 | —-0.008 |
| 18Z00007CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAMP CRAME, QUEZON CITY | Central Office | Buildings and Special Projects Management Cluster | On-Going | ₱291M | 100% | High risk77 | —-0.006 |
| 16C00085FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALES | Central Office | Flood Control Management Cluster | Completed | ₱420.4M | 100% | High risk76 | —-0.010 |
| 19C00039FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR AND PORAC, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱94.9M | 100% | High risk75 | —-0.056 |
| 17A00048CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF CONCRETE ROAD, PORO POINT FREEPORT ZONE, SAN FERNANDO CITY, LA UNION | Region I | Region I | Completed | ₱92.2M | 100% | High risk70 | —-0.041 |
| 20C00067REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱47.2M | 0% | High risk69 | Flagged0.009 |
| 17A00005NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG MANILA NORTH ROAD, K0325 +845 - K0326+ 677; K0326 + 684 - K0328 + 411; K0328 + 500 - K0329 + 242 | Region I | Region I | Completed | ₱95.3M | 100% | High risk68 | —-0.040 |
| 17AE0027PREVENTIVE MAINTENANCE ALONG SAN FERNANDO-BAGULIN ROAD, K0272+828 TO K0273+000, K0273+600 TO K0273+1010, K0274+306 TO K0275+003, K0277+130 TO K0277+430, K0277+524 TO K0277+548, K0278+000 TO K0278+258 | Region I | La Union 1st DEO | Completed | ₱29.4M | 100% | High risk65 | —-0.052 |
| 23Z00011CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093, WITH EXCEPTION) BRGY. APOLONIO SAMSON, QUEZON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱99.3M | 0% | High risk65 | —-0.037 |
| 17PE0031CLUSTERED CONSTRUCTION OF FLOOD CONTROL PROJECT, BOKOD AND KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱27.5M | 100% | High risk65 | —-0.042 |
| 17P00056PROPOSED EVACUATION CENTER, MUDI-IT, DOLORES, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱33.8M | 100% | High risk64 | —-0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21O00121CONSTRUCTION OF NEW COA BUILDING WITH BASEMENT, CENTRAL OFFICE COMPOUND, COMMONWEALTH AVENUE, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱959.9M | 42% | High risk63 | Flagged0.051 |
| 16Z00020CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Central Office | Flood Control Management Cluster | On-Going | ₱942.7M | 12% | High risk77 | Flagged0.045 |
| 17OF0198CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Central Office | Flood Control Management Cluster | On-Going | ₱247.1M | 40% | High risk77 | Flagged0.031 |
| 16C00084FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱376.8M | 72% | High risk77 | Flagged0.028 |
| 17P00002ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN-ROAD, K0333+401-K0336+226 | Cordillera Administrative Region | Cordillera Administrative Region | Terminated | ₱134.6M | 0% | High risk63 | Flagged0.019 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 17Z00012CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Central Office | Flood Control Management Cluster | On-Going | ₱934M | 99% | High risk77 | Flagged0.017 |
| 17BC0279CONSTRUCTION OF WORKSHOP BUILDING (7X18) BABUYAN IS. CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱5.7M | 100% | Medium risk36 | Flagged0.012 |
| 17BC0280CONSTRUCTION OF WORKSHOP BUILDING (7X18) BABUYAN IS. CALAYAN,CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱5.6M | 100% | Medium risk36 | Flagged0.012 |
| 17BC0261CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT BABUYAN CLARO INTEGRATED SCHOOL CALAYAN, CAGAYAN (BUILDING 2) | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.012 |
| 17BC0253CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR BABUYAN CLARO INTEGRATED SCHOOL, CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.012 |
| 17PA0041REHABILITATION AND IMPROVEMENT OF LAGBEN FLOOD CONTROL, LAGBEN, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46M | 100% | Medium risk50 | Flagged0.011 |
| 17BC0257CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT DALUPIRI ELEMENTARY SCHOOL, CALAUYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.010 |
| 17BC0258CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT MOROL ELEMENTARY SCHOOL CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.010 |
| 17PA0019REHABILITATION AND IMPROVEMENT OF SAN QUINTIN FLOOD CONTROL, POBLACION EAST, SAN QUINTIN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.7M | 100% | Medium risk50 | Flagged0.010 |
| 17PA0023REHABILITATION AND IMPROVEMENT OF STO. TOMAS FLOOD CONTROL, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.5M | 100% | Medium risk51 | Flagged0.009 |
| 17PA0042REHABILITATION AND IMPROVEMENT OF CALAO FLOOD CONTROL, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.7M | 100% | Medium risk51 | Flagged0.009 |
| 20C00067REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱47.2M | 0% | High risk69 | Flagged0.009 |
| 17PA0060REPAIR/REHABILITATION/IMPROVEMENT OF CABAROAN FLOOD CONTROL, CABAROAN, TAYUM, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk50 | Flagged0.009 |
| 17BC0255CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CAMIQUIN ELEMENTARY SCHOOL. CALAYAN,CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 18A00077WIDENING OF PERMANENT BRIDGES - ARINGAY BRIDGE (B02638LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱149.6M | 100% | High risk61 | —-0.025 |
| 27 | 17PA0083REPAIR/REHABILITATION/IMPROVEMENT OF NATIONAL ROADS AND BRIDGES, VARIOUS LOCATIONS | Cordillera Administrative Region | Abra DEO | Completed | ₱14.6M | 100% | Medium risk60 | —-0.045 |
| 28 | 17BC0076MFO 3. CONST/IMPVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-MAGSIDEL PORT-CALAYAN POBLACION-SIBANG COVE ROAD, CALAYAN CAG. LEADING TO SIBANG COVE, CARARANGATAN CAVE, SIBANG CAVE, CABABAAN CAVE, INCLUDING BRIDGE, BATARAW FALL, CALAYAN, CAG | Region II | Cagayan 2nd DEO | Completed | ₱46.5M | 100% | Medium risk59 | —-0.014 |
| 29 | 17AE0041COMPLETION OF NEW PERMANENT BRIDGE ALONG MANILA NORTH ROAD (CABAROAN BRIDGE) - PHASE III | Region I | La Union 1st DEO | Completed | ₱15.8M | 100% | Medium risk55 | —-0.020 |
| 30 | 18HM0043ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE,AND LANDSLIDE - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0001 + 605 - K0001+985, K0002 +105 - K0002 + 545, K0002 + 605 - K0002 + 826, K0004 + 254 - K000 | Negros Island Region | Siquijor DEO | Completed | ₱64.3M | 100% | Medium risk55 | —-0.085 |
| 31 | 18C00029BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES, SAN AGUSTIN BRIDGE (BO1482LZ) ALONG JOSE ABAD SANTOS AVENUE (JASA), PROVINCE OF PAMPANGA | Region III | Region III | Terminated | ₱101.5M | 100% | Medium risk54 | —-0.008 |
| 32 | 17PA0020REHABILITATION AND IMPROVEMENT OF MALANAS FLOOD CONTROL, BACOOC, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46.7M | 100% | Medium risk53 | Flagged0.008 |
| 33 | 17PA0078CONSTRUCTION/REPAIR/REHABILITATION/IMPROVMENT OF BAUDAN-AMTUAGAN ROAD, TUBO, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱17.9M | 100% | Medium risk52 | —-0.001 |
| 34 | 17PA0071REPAIR/REHABILITATION AND IMPROVEMENT OF CATACDEGAN FLOOD CONTROL, DOWNSTREAM APPROACH B OF IKMIN BRIDGE, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46M | 100% | Medium risk51 | Flagged0.007 |
| 35 | 17PA0021REHABILITATION AND IMPROVEMENT OF BUMAGCAT FLOOD CONTROL, BUMAGCAT, TAYUM, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱43.8M | 100% | Medium risk51 | Flagged0.008 |
| 36 | 17PA0023REHABILITATION AND IMPROVEMENT OF STO. TOMAS FLOOD CONTROL, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.5M | 100% | Medium risk51 | Flagged0.009 |
| 37 | 17PA0042REHABILITATION AND IMPROVEMENT OF CALAO FLOOD CONTROL, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.7M | 100% | Medium risk51 | Flagged0.009 |
| 38 | 17PA0032REHABILITATION AND IMPROVEMENT OF DALAGUISEN FLOOD CONTROL, DALAGUISEN, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱43M | 100% | Medium risk51 | Flagged0.009 |
| 39 | 17PA0060REPAIR/REHABILITATION/IMPROVEMENT OF CABAROAN FLOOD CONTROL, CABAROAN, TAYUM, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk50 | Flagged0.009 |
| 40 | 17PA0041REHABILITATION AND IMPROVEMENT OF LAGBEN FLOOD CONTROL, LAGBEN, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46M | 100% | Medium risk50 | Flagged0.011 |
| 41 | 17PA0019REHABILITATION AND IMPROVEMENT OF SAN QUINTIN FLOOD CONTROL, POBLACION EAST, SAN QUINTIN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.7M | 100% | Medium risk50 | Flagged0.010 |
| 42 | 17PA0018REHABILITATION AND IMPROVEMENT OF MAUSOC, LABAAN FLOOD CONTROL, MAUSOC, LABAAN, SAN QUINTIN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.2M | 100% | Medium risk50 | Flagged0.008 |
| 43 | 18BC0019CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS-ACCESS ROAD LEADING TO CALAYAN AIRPORT, CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱27.9M | 100% | Medium risk49 | —-0.063 |
| 44 | 16HD0101CONST & MAINT OF BRIDGES - WIDENING OF PERMANENT BRIDGES, LUYANG BRIDGE ALONG AYDPH, SAN REMEGIO | Region VII | Cebu 4th DEO | Completed | ₱24.2M | 100% | Medium risk48 | —-0.032 |
| 45 | 24BA0007OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM; CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF GUARDWALL ALONG MAYAN-MAUYEN PORT ROAD, ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱35.2M | 95% | Medium risk48 | —-0.023 |
| 46 | 18HF0053RETROFITTING/STRENGTHENING OF BAGASAWE BR. (B00481CB) ALONG TOLEDO-TABUELAN-SN REMEGIO RD | Region VII | Cebu 3rd DEO | Completed | ₱11.2M | 100% | Medium risk48 | —-0.059 |
| 47 | 18HD0010WIDENING OF PERMANENT BRIDGES; AVANTE BRIDGE (BOOO21CB) ALONG ANTONIO Y DE PIO H-WAY INCLUDING ROW, SAN REMEGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱21M | 100% | Medium risk48 | —-0.058 |
| 48 | 18HF0021CONSTRUCTION OF REVETMENT (RUBBLE CONCRETE) AT STA. ANA RIVER ALONG CARCAR-BARILI ROAD / BARILI MANTAYUPAN ROAD, STA. 2+220 - STA. 2+530, BRGY. POBLACION, BARILI, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.076 |
| 49 | 18HF0025CONSTRUCTION OF REVETMENT (RUBBLE CONCRETE) AT BONBON RIVER ALONG TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON ROAD, K0064+303, BRGY. POBLACION, PINAMUNGAJAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.077 |
| 50 | 18HD0005CONST/IMPVT OF ACCESS ROADS LEADING TO SEAPORTS, TABUELAN WHARF ROAD, TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱42.8M | 100% | Medium risk47 | —-0.095 |