Contractor dossier
73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱8.6B
Average progress
92.6%
Completion rate
83.6%
Average risk score
50.8
Medium risk on average, out of 100
Flagged as unusual
29
39.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 26 | ₱490.1M | 31.6 | 11 | 99.8% |
| Cordillera Administrative Region | 16 | ₱712.4M | 54.6 | 11 | 93.8% |
| Central Office | 13 | ₱5.3B | 75.2 | 6 | 70.9% |
| Region VII | 7 | ₱176.2M | 47.1 | 0 | 100.0% |
| Region I | 5 | ₱382.2M | 63.8 | 0 | 100.0% |
| Region III | 3 | ₱366.5M | 70.0 | 0 | 100.0% |
| National Capital Region | 2 | ₱1.1B | 63.0 | 1 | 70.8% |
| Negros Island Region | 1 | ₱64.3M | 54.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 27 | ₱5.8B | 62.8 | 16 | 85.8% |
| Roads | 23 | ₱924.5M | 50.5 | 1 | 95.7% |
| Buildings and Facilities | 16 | ₱1.5B | 29.1 | 12 | 96.4% |
| Bridges | 6 | ₱323.3M | 52.2 | 0 | 100.0% |
| OTHER | 1 | ₱120.3M | 76.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17CD0157CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, VALENZUELA-OBANDO-MEYCAUAYAN FLOOD CONTROL PROJECT, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱144.7M | 100% | High risk80 | —-0.038 |
| 17Z00012CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Central Office | Flood Control Management Cluster | On-Going | ₱934M | 99% | High risk77 | Flagged0.017 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 17OF0198CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Central Office | Flood Control Management Cluster | On-Going | ₱247.1M | 40% | High risk77 | Flagged0.031 |
| 16Z00020CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Central Office | Flood Control Management Cluster | On-Going | ₱942.7M | 12% | High risk77 | Flagged0.045 |
| 16C00084FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱376.8M | 72% | High risk77 | Flagged0.028 |
| 18C00050REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱285.9M | 100% | High risk77 | —-0.025 |
| 18C00047FLOOD CONTROL WORKS-ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱761M | 100% | High risk77 | —-0.005 |
| 17C00053CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, FLOOD CONTROL WORKS - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱193M | 100% | High risk77 | —-0.044 |
| 18C00015NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, ANGELES-PORAC-FLORIDABLANCA -DINALUPIHAN ROAD, PAMPANGA 2ND LEGISLATIVE DISTRICT, RPOVINCE OF PAMPANGA | Region III | Region III | Completed | ₱120.3M | 100% | High risk77 | —-0.008 |
| 18Z00007CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAMP CRAME, QUEZON CITY | Central Office | Buildings and Special Projects Management Cluster | On-Going | ₱291M | 100% | High risk77 | —-0.006 |
| 16C00085FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALES | Central Office | Flood Control Management Cluster | Completed | ₱420.4M | 100% | High risk76 | —-0.010 |
| 19C00039FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR AND PORAC, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱94.9M | 100% | High risk75 | —-0.056 |
| 17A00048CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF CONCRETE ROAD, PORO POINT FREEPORT ZONE, SAN FERNANDO CITY, LA UNION | Region I | Region I | Completed | ₱92.2M | 100% | High risk70 | —-0.041 |
| 20C00067REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱47.2M | 0% | High risk69 | Flagged0.009 |
| 17A00005NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG MANILA NORTH ROAD, K0325 +845 - K0326+ 677; K0326 + 684 - K0328 + 411; K0328 + 500 - K0329 + 242 | Region I | Region I | Completed | ₱95.3M | 100% | High risk68 | —-0.040 |
| 17AE0027PREVENTIVE MAINTENANCE ALONG SAN FERNANDO-BAGULIN ROAD, K0272+828 TO K0273+000, K0273+600 TO K0273+1010, K0274+306 TO K0275+003, K0277+130 TO K0277+430, K0277+524 TO K0277+548, K0278+000 TO K0278+258 | Region I | La Union 1st DEO | Completed | ₱29.4M | 100% | High risk65 | —-0.052 |
| 23Z00011CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093, WITH EXCEPTION) BRGY. APOLONIO SAMSON, QUEZON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱99.3M | 0% | High risk65 | —-0.037 |
| 17PE0031CLUSTERED CONSTRUCTION OF FLOOD CONTROL PROJECT, BOKOD AND KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱27.5M | 100% | High risk65 | —-0.042 |
| 17P00056PROPOSED EVACUATION CENTER, MUDI-IT, DOLORES, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱33.8M | 100% | High risk64 | —-0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21O00121CONSTRUCTION OF NEW COA BUILDING WITH BASEMENT, CENTRAL OFFICE COMPOUND, COMMONWEALTH AVENUE, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱959.9M | 42% | High risk63 | Flagged0.051 |
| 16Z00020CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Central Office | Flood Control Management Cluster | On-Going | ₱942.7M | 12% | High risk77 | Flagged0.045 |
| 17OF0198CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Central Office | Flood Control Management Cluster | On-Going | ₱247.1M | 40% | High risk77 | Flagged0.031 |
| 16C00084FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱376.8M | 72% | High risk77 | Flagged0.028 |
| 17P00002ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN-ROAD, K0333+401-K0336+226 | Cordillera Administrative Region | Cordillera Administrative Region | Terminated | ₱134.6M | 0% | High risk63 | Flagged0.019 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 17Z00012CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Central Office | Flood Control Management Cluster | On-Going | ₱934M | 99% | High risk77 | Flagged0.017 |
| 17BC0279CONSTRUCTION OF WORKSHOP BUILDING (7X18) BABUYAN IS. CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱5.7M | 100% | Medium risk36 | Flagged0.012 |
| 17BC0280CONSTRUCTION OF WORKSHOP BUILDING (7X18) BABUYAN IS. CALAYAN,CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱5.6M | 100% | Medium risk36 | Flagged0.012 |
| 17BC0261CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT BABUYAN CLARO INTEGRATED SCHOOL CALAYAN, CAGAYAN (BUILDING 2) | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.012 |
| 17BC0253CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR BABUYAN CLARO INTEGRATED SCHOOL, CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.012 |
| 17PA0041REHABILITATION AND IMPROVEMENT OF LAGBEN FLOOD CONTROL, LAGBEN, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46M | 100% | Medium risk50 | Flagged0.011 |
| 17BC0257CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT DALUPIRI ELEMENTARY SCHOOL, CALAUYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.010 |
| 17BC0258CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT MOROL ELEMENTARY SCHOOL CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.010 |
| 17PA0019REHABILITATION AND IMPROVEMENT OF SAN QUINTIN FLOOD CONTROL, POBLACION EAST, SAN QUINTIN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.7M | 100% | Medium risk50 | Flagged0.010 |
| 17PA0023REHABILITATION AND IMPROVEMENT OF STO. TOMAS FLOOD CONTROL, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.5M | 100% | Medium risk51 | Flagged0.009 |
| 17PA0042REHABILITATION AND IMPROVEMENT OF CALAO FLOOD CONTROL, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.7M | 100% | Medium risk51 | Flagged0.009 |
| 20C00067REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱47.2M | 0% | High risk69 | Flagged0.009 |
| 17PA0060REPAIR/REHABILITATION/IMPROVEMENT OF CABAROAN FLOOD CONTROL, CABAROAN, TAYUM, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk50 | Flagged0.009 |
| 17BC0255CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CAMIQUIN ELEMENTARY SCHOOL. CALAYAN,CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18BC0073CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES-DIBAY-DILAM ROAD CONNECTING THE MAGSIDEL-SEAPORT TOURISM ROAD AND HIGH AGRICULTURAL AND AQUATIC PRODUCTION AND BIG RANCHES | Region II | Cagayan 2nd DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.083 |
| 52 | 21BA0050CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO MAUYEN PORT, BRGY. RAELE, ITBAYAT, BATANES | Region II | Batanes DEO | Completed | ₱56M | 100% | Medium risk46 | —-0.058 |
| 53 | 18HI0025CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION AT SANTANDER - BUENAVISTA BARANGAY ROAD LEADING TO BUENAVISTA HEIGHTS VIEWS CENTURY OLD TRESS, BRGY. SANTANDER, TUDELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱18.2M | 100% | Medium risk44 | —-0.095 |
| 54 | 22BA0050NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS: MAYAN-PAGANAMAN PORT ROAD - K0001+(-992.00) - K0001+459.00, ITBAYAT, BATANES, ITBAYAT, BATANES | Region II | Batanes DEO | Completed | ₱38.5M | 100% | Medium risk43 | —-0.069 |
| 55 | 18BC0013CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS-ACCESS ROAD LEADING TO CAMIGUIN PORT | Region II | Cagayan 2nd DEO | Completed | ₱37.2M | 100% | Medium risk42 | —-0.060 |
| 56 | 22BA0051CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO MAUYEN PORT, ITBAYAT, BATANES | Region II | Batanes DEO | Completed | ₱24.4M | 100% | Medium risk42 | —-0.067 |
| 57 | 18BA0006CONSTRUCTION/IMPROVEMENT OF KAVAYUAN ACCESS ROAD LEADING TO ITBAYAT AIRPORTRAELE, ITBAYAT, BATANES | Region II | Batanes DEO | Completed | ₱19.1M | 100% | Medium risk42 | —-0.067 |
| 58 | 18BA0040CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO PANEMBATAN PORT, BRGY. RAELE, ITBAYAT, BATANES | Region II | Batanes DEO | Completed | ₱19.1M | 100% | Medium risk42 | —-0.069 |
| 59 | 21BA0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO TACHIMUS PORT PACKAGE II, BRGY. STA. LUCIA, ITBAYAT, BATANES | Region II | Batanes DEO | Completed | ₱23.3M | 100% | Medium risk41 | —-0.063 |
| 60 | 22BA0012CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO TACHIMUS PORT, ITBAYAT, BATANES | Region II | Batanes DEO | Completed | ₱24.5M | 100% | Medium risk41 | —-0.067 |
| 61 | 18BC0055CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-MAGSIDEL PORT-CALAYAN POBLACION-SIBANG COVE ROAD, CALAYAN,CAGAYAN LEADING SIBANG COVE,CARARANGATAN CAVE,SIBANG CAVE,CABABAAN CAVE,BATARAW FALL | Region II | Cagayan 2nd DEO | Completed | ₱18.6M | 100% | Medium risk41 | —-0.064 |
| 62 | 18BC0004CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-MAGSIDEL ROAD LEADING TO BATARAW FALLS AND LUSOK CAVE BRGY MAGSIDEL, CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱14M | 100% | Medium risk40 | —-0.055 |
| 63 | 17BC0279CONSTRUCTION OF WORKSHOP BUILDING (7X18) BABUYAN IS. CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱5.7M | 100% | Medium risk36 | Flagged0.012 |
| 64 | 17BC0280CONSTRUCTION OF WORKSHOP BUILDING (7X18) BABUYAN IS. CALAYAN,CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱5.6M | 100% | Medium risk36 | Flagged0.012 |
| 65 | 17BC0261CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT BABUYAN CLARO INTEGRATED SCHOOL CALAYAN, CAGAYAN (BUILDING 2) | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.012 |
| 66 | 17BC0253CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR BABUYAN CLARO INTEGRATED SCHOOL, CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.012 |
| 67 | 17BC0258CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT MOROL ELEMENTARY SCHOOL CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk8 | Flagged0.010 |
| 68 | 17BC0255CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CAMIQUIN ELEMENTARY SCHOOL. CALAYAN,CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.009 |
| 69 | 17BC0254CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CADADALMAN ELEMENTARY SCHOOL, CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.009 |
| 70 | 17BC0260CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CALAYAN HIGH SCHOOL CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.008 |
| 71 | 17BC0256CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CANIWALAN ELEMENTARY SCHOOL CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.008 |
| 72 | 17BC0259CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT PILID ELEMENTARY SCHOOL, CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.008 |
| 73 | 17BC0257CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT DALUPIRI ELEMENTARY SCHOOL, CALAUYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱3.1M | 100% | Low risk7 | Flagged0.010 |