Opening the dossier…
Opening the dossier…
Contractor dossier
43 projects on file, including joint ventures this contractor is part of.
Total projects
43
Total budget
₱748.7M
Average progress
99.8%
Completion rate
97.7%
Average risk score
42.8
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 19 | ₱484.5M | 41.1 | 0 | 100.0% |
| Region IX | 18 | ₱175.2M | 45.3 | 0 | 99.4% |
| Region X | 4 | ₱74.6M | 37.7 | 0 | 100.0% |
| Negros Island Region | 1 | ₱9.8M | 73.0 | 0 | 100.0% |
| Region IV-B | 1 | ₱4.6M | 19.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 21 | ₱463.9M | 39.6 | 0 | 99.5% |
| Roads | 15 | ₱196.8M | 42.7 | 0 | 100.0% |
| Bridges | 5 | ₱75.3M | 54.3 | 0 | 100.0% |
| OTHER | 1 | ₱9.8M | 73.0 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱2.8M | 24.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20GL0004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-SU-AY BR. (B00363NR) ALONG BACOLOD SOUTH RD, HIMAMAYLAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 20GL0004REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-SU-AY BR. (B00363NR) ALONG BACOLOD SOUTH RD, HIMAMAYLAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.036 |
| 2 | 22JA0066CONCRETING OF BRGY. SIBULAO FMR, BRGY. SIBULAO, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱14.9M | 100% | Medium risk60 | —-0.031 |
| 3 | 20JA0062REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, BRGY. TETUAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱18.8M | 100% | Medium risk59 | —-0.076 |
| 4 | 20JA0061REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED ROADS, BRGY. TALON-TALON, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱19.2M | 100% | Medium risk59 | —-0.076 |
| 5 | 22JA0048CONSTRUCTION OF CONCRETE ROAD AT PUROK II, BARANGAY LUNZURAN, ZAMBOANGA CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga City 2nd DEO | Completed | ₱4.9M | 100% | Medium risk56 | —-0.079 |
| 6 | 22JA0039CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY ZAMBOWOOD, ZAMBOANGA CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga City 2nd DEO | On-Going | ₱4.9M | 90% | Medium risk56 | —-0.009 |
| 7 | 22JA0019REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - PAGADIAN CITY-ZAMBOANGA CITY RD - K1887 + 317 - K1887 + 700 | Region IX | Zamboanga City 2nd DEO | Completed | ₱11.4M | 100% | Medium risk56 | —-0.081 |
| 8 | 17NG0005CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG THE COASTAL OF BARANGAY POBLACION 1 AND 2, UP TO BARANGAY BITAUG, BURGOS, SURIGAO DEL NORTE (STA. 0+246-0+465), BURGOS, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱13.9M | 100% | Medium risk55 | —-0.040 |
| 9 | 17NG0010CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG THE COASTAL OF BRGY. UNION (STA. 0+000 - STA. 0 + 300), BRGY. UNION, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱13.9M | 100% | Medium risk55 | —-0.040 |
| 10 | 19JA0144CONSTRUCTION OF FLOOD CONTROL AT BARANGAY SIBULAO, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱14.3M | 100% | Medium risk54 | —-0.070 |
| 11 | 20JA0041WIDENING OF PERMANENT BRIDGES - BASAGAN BR. (B00562MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY RD | Region IX | Zamboanga City 2nd DEO | Completed | ₱20.7M | 100% | Medium risk54 | —-0.040 |
| 12 | 20JA0039WIDENING OF PERMANENT BRIDGES - BOLONG BR. (B00568MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY RD | Region IX | Zamboanga City 2nd DEO | Completed | ₱17.1M | 100% | Medium risk54 | —-0.050 |
| 13 | 19JA0020WIDENING OF PERMANENT BRIDGE PAMINGITAN BRIDGE 1 (B00570MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱14.8M | 100% | Medium risk54 | —-0.049 |
| 14 | 19JA0021WIDENING OF PERMANENT BRIDGE PAMINGITAN BRIDGE 2 (B00570MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱14.5M | 100% | Medium risk54 | —-0.049 |
| 15 | 20JA0040WIDENING OF PERMANENT BRIDGES - CALIBATO BR. (B00573MN), ALONG PAGADIAN CITY-ZAMBOANGA CITY RD | Region IX | Zamboanga City 2nd DEO | Completed | ₱8.2M | 100% | Medium risk54 | —-0.050 |
| 16 | 17NG0017REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE OF JCT. OSMEÑA-PILAR ROAD, SIARGAO ISLAND, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱37M | 100% | Medium risk50 | —-0.046 |
| 17 | 17NG0011SLOPE PROTECTION ALONG JCT. DEL CARMEN-STA. MONICA-SAN ISIDRO ROAD (K0025+000-K0068+000) | Region XIII | Surigao del Norte 1st DEO | Completed | ₱18.7M | 100% | Medium risk48 | —-0.049 |
| 18 | 16NG0071REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. DEL CARMEN-STA. MONICA-SAN ISIDRO ROAD, SAN BENITO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱9.2M | 100% | Medium risk48 | —-0.049 |
| 19 | 18KK0013REHAB./RECONST. OF ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE,GCVR K1322 + 716.4 - K1322 + 840 | Region X | Misamis Oriental 1st DEO | Completed | ₱46.4M | 100% | Medium risk46 | —-0.093 |
| 20 | 21KH0026ACCESS ROAD LEADING TO TIGNAPOLOAN (SINULOM FALLS), JUMP OFF POINT OF EXTREME CLASS FOR WHITE WATER RAFTING, TIGNAPOLOAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.094 |
| 21 | 19KK0150CONSTRUCTION OF FOOT PROTECTION WORKS ALONG BALATUKAN RIVER, BRGY. NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱18.6M | 100% | Medium risk44 | —-0.081 |
| 22 | 18NG0021CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG THE COASTAL OF BRGYS. POBLACION 1 AND 2, UP TO BRGY. BITAUG, BURGOS, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱80.8M | 100% | Medium risk43 | —-0.059 |
| 23 | 18NG0025CONSTRUCTION/EXTENSION OF SHORE PROTECTION ALONG THE COASTAL OF POBLACION SOCORRO (STA. 0+000-0+508.22), SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱57M | 100% | Medium risk40 | —-0.051 |
| 24 | 21NF0042CONSTRUCTION OF SAN ISIDRO BRIDGE RIVER CONTROL, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱14.3M | 100% | Medium risk37 | —-0.063 |
| 25 | 21NF0028CONSTRUCTION OF FLOOD CONTROL EMBANKMENT ON BOULEVARD AREA (BARANGAY 2 AND BARANGAY 6) (PHASE 2) IN DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱14.3M | 100% | Medium risk37 | —-0.063 |