Contractor dossier
102 projects on file, including joint ventures this contractor is part of.
Total projects
102
Total budget
₱2.5B
Average progress
93.0%
Completion rate
83.3%
Average risk score
48.6
Medium risk on average, out of 100
Flagged as unusual
2
2.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 97 | ₱2.2B | 48.9 | 2 | 92.6% |
| Region III | 4 | ₱183.5M | 41.5 | 0 | 100.0% |
| National Capital Region | 1 | ₱39.2M | 45.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 61 | ₱858.9M | 45.2 | 2 | 92.9% |
| Flood Control and Drainage | 21 | ₱1.2B | 51.3 | 0 | 96.3% |
| Roads | 13 | ₱315.9M | 51.2 | 0 | 92.3% |
| OTHER | 6 | ₱70.8M | 67.0 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.9M | 48.5 | 0 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DF0267CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE FACILITY, IMUS CITY, CAVITE (PHASE 2) | Region IV-A | Cavite 1st DEO | On-Going | ₱99M | 87% | High risk78 | —-0.021 |
| 25DG0053CONST. OF MULTI-PURPOSE BLDG. (GYMNASIUM) AT BRGY. CASTAÑOS, GEN. E. AGUINALDO, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱48.8M | 1% | High risk75 | —-0.005 |
| 25DF0158CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITESCONSTRUCTION OF ROAD WITH DRAINAGE AT BRGY. PALICO IV, CITY OF IMUS, | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | High risk69 | —-0.018 |
| 23DF0098CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY TANZANG LUMA III, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱4.9M | 100% | High risk69 | —-0.042 |
| 21DF0180LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/ FACILITIESCONSTRUCTION/REPAIR/IMPROVEMENT OF MULTI-PURPOSE BUILDING AT MEDICION 2A (GOV DM CAMERINO INTEGRATED SCHOOL), IMUS AND CONSTRUCTION/REPAIR/IMPROVEMENT O | Region IV-A | Cavite 1st DEO | Completed | ₱8.4M | 100% | High risk69 | —-0.042 |
| 21DF0036LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT PAGASA II, IMUS AND CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT PALICO, IMUS, CAVI | Region IV-A | Cavite 1st DEO | Completed | ₱8.4M | 100% | High risk68 | —-0.042 |
| 20DF0128LOCAL PROGRAM - CONSTRUCTION /REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS - CONSTRUCTION OF ANABU ROAD WITH DRAINAGE, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱24.5M | 100% | High risk68 | —-0.041 |
| 17DQ0052LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP) - FLOOD CONTROL AND DRAINAGE - DRAINAGE PROTECTION WORKS, REPAIR/REHABILITATION OF DRAINAGE CANAL, HABAY 1, BACOOR CITY, CAVITE, CONSTRUCTION/REHABILITATION OF DRAINAGE CANAL, HABAY 2, BACOOR CI | Region IV-A | Cavite 3rd DEO | Completed | ₱9.1M | 100% | High risk67 | —-0.059 |
| 21DF0132LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESREHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), SANGLEY POINT NATIONAL HIGH SCHOOL, CAVITE CITY AND REHABILITATION OF MULTI-PURPOSE BUILDING, B | Region IV-A | Cavite 1st DEO | Completed | ₱5.9M | 100% | High risk67 | —-0.042 |
| 17DQ0063LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP) - ROADS AND BRIDGES - LOCAL ROADS, CONCRETING OF ROAD, BARANGAY MOLINO 6, BACOOR, CAVITE, REPAIR/REHABILITATION OF ROADS, M. ALVAREZ ROAD, BACOOR, CAVITE, IMPROVEMENT OF MAJOR INTERSECTION AT TA | Region IV-A | Cavite 1st DEO | Completed | ₱21.7M | 100% | High risk67 | —-0.074 |
| 25DF0211ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF WATERWAY ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | On-Going | ₱116.9M | 47% | High risk65 | —-0.027 |
| 24DF0085ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAM CONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONST OF REVETMENT ALONG CAÑAS RIVER, BRGY SANTOL, PHASE V,TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 100% | High risk65 | —-0.038 |
| 20DF0200CONSTRUCTION OF BYPASS ROAD CONNECTING BUHAY NA TUBIG TO BAHAYANG PAG-ASA, PHASE 1, IMUS AND UPGRADING/CONCRETING OF ROADS AT MALAGASANG 1G, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱14.5M | 100% | High risk64 | —-0.018 |
| 23DQ0082CONSTRUCTION OF RIVERBANK INCLUDING ROAD LEADING TO NATIONAL ROAD (JOSE ABAD SANTOS), PHASE 1, BRGY. SALAWAG, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96.5M | 75% | High risk64 | —-0.021 |
| 23DQ0079CONSTRUCTION OF RIVERBANK INCLUDING ROAD LEADING TO NATIONAL ROAD (JOSE ABAD SANTOS), PHASE 2, BRGY. SALAWAG, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.073 |
| 23DF0126CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE FACILITY (IMUS PUBLIC MARKET), PHASE I, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱99M | 100% | High risk63 | —-0.082 |
| 19CD0065CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO BULUSUKAN CAVE, SAN ILDEFONSO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱18.6M | 100% | High risk62 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17DF0180UPGRADING OF ELECTRICAL POWER; STP RECYCLING SYSTEM FOR DR. OLIVIA SALAMANCA MEMORIAL HOSPITAL, CAVITE CITY AND KAWIT KALAYAAN HOSPITAL, KAWIT, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱11.3M | 2% | Medium risk46 | Flagged0.070 |
| 23DQ0155REHABILITATION OF EVACUATION CENTER AT BARANGAY PALIPARAN I, CITY OF DASMARIÑAS, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱5.2M | 100% | Medium risk45 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23DF0123CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY CARSADANG BAGO I (PTC), IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱6.9M | 100% | Medium risk50 | —-0.104 |
| 52 | 23DQ0151CONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. CABANGAAN, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱6.9M | 100% | Medium risk50 | —-0.106 |
| 53 | 23DF0143CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY MALAGASANG II-D (GPV1), IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱6.9M | 100% | Medium risk50 | —-0.105 |
| 54 | 20DF0225LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. MALAGASANG 1-F, IMUS CITY AND CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BU | Region IV-A | Cavite 1st DEO | Completed | ₱7.9M | 100% | Medium risk50 | —-0.104 |
| 55 | 22DF0282CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT MALAGASANG II-F, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱6.9M | 100% | Medium risk50 | —-0.105 |
| 56 | 23DF0013ORGANIZATIONAL OUTCOME 2: : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, BARANGAY BUNGA, PHASE III, | Region IV-A | Cavite 1st DEO | Completed | ₱48.5M | 100% | Medium risk49 | —-0.083 |
| 57 | 21DF0018ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BR | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 58 | 24DF0002ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG PANAMITAN RIVER, BARANGAY BATONG DALIG, PHASE II,KAWIT | Region IV-A | Cavite 1st DEO | Completed | ₱48.5M | 100% | Medium risk49 | —-0.086 |
| 59 | 20DF0007ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATIONFACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENTALONG IMUS RIVER | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 60 | 21DF0109ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 61 | 21DF0081ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER, | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 62 | 20DF0224LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. ANABU II-C, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | Medium risk49 | —-0.102 |
| 63 | 22DF0175CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY MARIANO ESPELETA III, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | Medium risk49 | —-0.105 |
| 64 | 22DF0026ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, BRGY. BUNGA PHASE II, TANZA, | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 65 | 25DG0044CONST. OF WATER SUPPLY SYSTEM, BRGY. CASTAÑOS LEJOS, GEN. E. AGUINALDO, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱4.9M | 0% | Medium risk49 | —-0.009 |
| 66 | 22DF0236CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT MALAGASANG I-E, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.104 |
| 67 | 22DF0234CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BUCANDALA 5, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.104 |
| 68 | 22DF0139CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP), BIPMULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SAPA II, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.103 |
| 69 | 22DF0311CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY AGOS-OS, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.102 |
| 70 | 18DQ0031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -CONSTRUCTION/ UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS PRIMARY ROADS-MANILA-CAVITE (NCR BDRY-JCT CAVITE CITY SECT)(S01918LZ) K001 | Region IV-A | Region IV-A | Completed | ₱40.4M | 100% | Medium risk47 | —-0.100 |
| 71 | 17DF0180UPGRADING OF ELECTRICAL POWER; STP RECYCLING SYSTEM FOR DR. OLIVIA SALAMANCA MEMORIAL HOSPITAL, CAVITE CITY AND KAWIT KALAYAAN HOSPITAL, KAWIT, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱11.3M | 2% | Medium risk46 | Flagged0.070 |
| 72 | 18DF0042ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIESWITHIN MAJOR RIVER BASINS AND PRINCIPAL, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER,BRGY. | Region IV-A | Cavite 1st DEO | Completed | ₱37.2M | 100% | Medium risk46 | —-0.087 |
| 73 | 18DF0003ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIESWITHIN MAJOR RIVER BASINS AND PRINCIPAL, CONSTRUCTION OF REVETMENT ALONG IMUS RIVER,BRGY. | Region IV-A | Cavite 1st DEO | Completed | ₱37.2M | 100% | Medium risk46 | —-0.087 |
| 74 | 23DQ0005REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - GEN EVANGELISTA RD - K0018 + 729 - K0019 + 041 | Region IV-A | Cavite 3rd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.108 |
| 75 | 18DF0149CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT ALAPAN II ELEMENTARY SCHOOL,IMUS CITY | Region IV-A | Cavite 1st DEO | Completed | ₱25.8M | 100% | Medium risk46 | —-0.054 |