Contractor dossier
133 projects on file, including joint ventures this contractor is part of.
Total projects
133
Total budget
₱6.9B
Average progress
93.2%
Completion rate
66.9%
Below 70%
Average risk score
51.0
Medium risk on average, out of 100
Flagged as unusual
16
12.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 124 | ₱6.4B | 51.4 | 14 | 93.3% |
| Region XII | 8 | ₱552.6M | 46.4 | 2 | 92.2% |
| Region X | 1 | ₱25.9M | 41.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 76 | ₱4.4B | 51.3 | 4 | 96.3% |
| Buildings and Facilities | 26 | ₱779M | 47.1 | 4 | 88.8% |
| Flood Control and Drainage | 16 | ₱777.8M | 48.2 | 0 | 97.8% |
| Bridges | 9 | ₱694.8M | 48.8 | 4 | 96.9% |
| OTHER | 4 | ₱166.2M | 82.0 | 3 | 49.6% |
| GAA 2025 SSP | 1 | ₱112.3M | 95.2 | 1 | 39.4% |
| Water Provision and Storage | 1 | ₱14.9M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 3, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.3M | 39% | High risk95 | Flagged0.041 |
| 24LG0069CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN TIBLAWAN NATIONAL HIGH SCHOOL, BARANGAY TIBLAWAN, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱9.9M | 0% | High risk86 | Flagged0.093 |
| 24LG0067CONSTRUCTION OF 1-STOREY 3 CLASSROOM SCHOOL BUILDING IN SUROP NATIONAL HIGH SCHOOL, BARANGAY SUROP, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱10.1M | 0% | High risk86 | Flagged0.089 |
| 24MC0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1662 + 250 - K1662 + 350, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 98% | High risk81 | Flagged0.012 |
| 19LH0030CONSTRUCTION OF MISSING LINKS/NEW ROADS AT DALAGDAG BRIDGE (PHASE II) ALONG BRGY. FATIMA, PAQUIBATO DISTRICT, BRGY. DALAGDAG-LAMPIANAO, CALINAN DISTRICT, 3RD CONGRESSIONAL DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱49.7M | 100% | High risk76 | —-0.028 |
| 20L00111ROAD UPGRADING OF SO. TAGOBOBOLO, BRGY. SAINZ, MATI - SO. KALASAGAN, BRGY. SAN ISIDRO, LUPON, DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱161.2M | 100% | High risk66 | —-0.042 |
| 22L00001CONSTRUCTION OF VIADUCT (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE)-DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 1, DAVAO CITY | Region XI | Region XI | On-Going | ₱237.1M | 91% | High risk65 | Flagged0.031 |
| 20L00140CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE ONLY) - MA-A BRIDGE II, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 99% | High risk65 | Flagged0.027 |
| 24LG0113REHABILITATION OF CONCRETE ROAD, LUPON POBLACION TO BARANGAY ILANGAY, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱93.6M | 87% | High risk65 | Flagged0.030 |
| 22L00091CONSTRUCTION OF BINONDO - SITIO MANTAPAY ROAD, BAGANGA, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱154.4M | 98% | High risk65 | Flagged0.002 |
| 20L00142CONSTRUCTION OF CONCRETE BRIDGE - TALOMO BRIDGE 4, DAVAO CITY | Region XI | Region XI | On-Going | ₱125.4M | 87% | High risk63 | Flagged0.022 |
| 18L00054CONC. OF DAVAO-BUKIDNON H'WAY(CALINAN POB. PORTION)TO DALAGDAG-FATIMA NAT'L. RD TO PANABO INCL. ROW, | Region XI | Region XI | Completed | ₱127.4M | 100% | High risk63 | —-0.070 |
| 22LH0051CONSTRUCTION OF ROAD ALONG CARMEN TO SITIO TABAK TO LALING TO TAWAN-TAWAN ROAD, BAGUIO DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.076 |
| 22LB0032CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, STA. 2+001 - STA. 2+246, GENEROSO BRIDGE DOWNSTREAM, RIGHT BANK, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱93.4M | 79% | High risk62 | —-0.002 |
| 19L00123CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAVAO OCCIDENTAL GOVERNMENT CENTER), MALITA,DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱141.4M | 99% | High risk62 | Flagged0.007 |
| 23LF0065SURIGAO DEL SUR BDRY - DAVAO OR COASTAL RD - K1689+070 - K1689+130, TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱95.5M | 100% | High risk62 | —-0.061 |
| 21L00132CONSTRUCTION OF CONCRETE ROAD - NHJ BUSO - SO. PAYPAY - TAGBINONGA - SO. CALAPAGAN - SO. MATIGDAO, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱96.4M | 97% | High risk62 | —-0.006 |
| 19L00013ROAD WIDENING ALONG FATIMA-MALABOG ROAD (S00059MN), K1511+341-K1512+663, DAVAO CITY | Region XI | Region XI | Completed | ₱104.4M | 100% | High risk62 | —-0.070 |
| 19L00012ROAD WIDENING ON SPECIFIC LOCATIONS ALONG FATIMA-MALABOG ROAD (S00059MN),K1501+(-422)-K1507+010, DAV | Region XI | Region XI | Completed | ₱100.5M | 100% | High risk62 | —-0.071 |
| 22L00094ROAD WIDENING ALONG DAHICAN-LAWIGAN ROAD (S00114MN), K1717+653 - K1721+418, DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱107.7M | 100% | High risk62 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LG0069CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN TIBLAWAN NATIONAL HIGH SCHOOL, BARANGAY TIBLAWAN, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱9.9M | 0% | High risk86 | Flagged0.093 |
| 24LG0067CONSTRUCTION OF 1-STOREY 3 CLASSROOM SCHOOL BUILDING IN SUROP NATIONAL HIGH SCHOOL, BARANGAY SUROP, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱10.1M | 0% | High risk86 | Flagged0.089 |
| 25MC0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 3, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.3M | 39% | High risk95 | Flagged0.041 |
| 24L00280CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - SAN ISIDRO SUPER HEALTH CENTER, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱11.8M | 1% | Medium risk40 | Flagged0.032 |
| 22L00001CONSTRUCTION OF VIADUCT (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE)-DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 1, DAVAO CITY | Region XI | Region XI | On-Going | ₱237.1M | 91% | High risk65 | Flagged0.031 |
| 24LG0113REHABILITATION OF CONCRETE ROAD, LUPON POBLACION TO BARANGAY ILANGAY, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱93.6M | 87% | High risk65 | Flagged0.030 |
| 20L00140CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE ONLY) - MA-A BRIDGE II, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 99% | High risk65 | Flagged0.027 |
| 20L00142CONSTRUCTION OF CONCRETE BRIDGE - TALOMO BRIDGE 4, DAVAO CITY | Region XI | Region XI | On-Going | ₱125.4M | 87% | High risk63 | Flagged0.022 |
| 24L00286LGU HOSPITALS - SARAGANI DISTRICT HOSPITAL, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱49.3M | 59% | Medium risk48 | Flagged0.018 |
| 24MC0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1662 + 250 - K1662 + 350, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 98% | High risk81 | Flagged0.012 |
| 20L00170RECONSTRUCTION TO CONCRETE PAVEMENT ALONG JCT. DAANG MAHARLIKA ROAD - GOV. GREGORIO V. CAÑEDA ROAD - JCT. FS DIZON ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱77.7M | 20% | Medium risk56 | Flagged0.012 |
| 19L00123CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAVAO OCCIDENTAL GOVERNMENT CENTER), MALITA,DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱141.4M | 99% | High risk62 | Flagged0.007 |
| 22LG0040REPLACEMENT OF LONGCACOB BR. ALONG NEW VISAYAS-SAN ISIDRO-LONGCACOB RD, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱19M | 96% | Medium risk47 | Flagged0.006 |
| 22LB0012OFF-CARRIAGEWAY IMPROVEMENT - DAVAOCITY DIV RD - K1507+311 - K1507+352,K1510+470 - K1510+850, K1512+528 -K1512+565, K1512+572 - K1512+595,K1512+820 - K1512+860, K1514+581 -K1514+646, K1514+992 - K1515+012 | Region XI | Davao City DEO | On-Going | ₱18.5M | 1% | Medium risk46 | Flagged0.002 |
| 22L00091CONSTRUCTION OF BINONDO - SITIO MANTAPAY ROAD, BAGANGA, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱154.4M | 98% | High risk65 | Flagged0.002 |
| 24L00284LGU HOSPITALS - DON MARCELINO MUNICIPAL HOSPITAL, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱9.9M | 89% | Medium risk45 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20LB0194ROAD WIDENING & CONSTRUCTION OF DRAINAGE ALONG DAANG MAHARLIKA (MN) - K1507+223 - K1507+324 (L/S), K1507+369 - K1507+464 (R/S), K1507+475 - K1507+518 (L/S), K1507+518 - K1508+000 | Region XI | Davao City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.063 |
| 27 | 20LB0182CONSTRUCTION OF DRAINAGE ALONG DAANG MAHARLIKA (MN) - K1510+201, K1510+625 | Region XI | Davao City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.064 |
| 28 | 20L00150REHABILITATION OF PAVED ROAD ALONG BYPASS RD. AT JCT. DAVAO - COTABATO RD. - CENTRAL PARK (CORDILLERA RD.) - JCT. MATINA APLAYA RD., DAVAO CITY | Region XI | Region XI | Completed | ₱96.5M | 100% | High risk61 | —-0.065 |
| 29 | 21LE0128CONSTRUCTION OF BUHANGIN-MALAGSOM NAWAN-BUCA-STA. MARIA-MALUNGON ROAD, (STA.2+380-STA.7+380) STA. MARIA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.075 |
| 30 | 21LE0136CONSTRUCTION OF MAHAYAHAY-MOTE-PINALPALAN-DEMOLOC ROAD, (S00203MN) (STA.0+000-STA.5+000), BRGY. DEMOLOC, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.075 |
| 31 | 21LE0142CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO BALUT ISLAND CIRCUMFERENTIAL ROAD (STA.18+860-STA.27+680), SARANGANI, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱120.6M | 100% | High risk61 | —-0.067 |
| 32 | 22L00090CONSTRUCTION OF CONCRETE ROAD - NATIONAL HIGHWAY JUNCTION SAKUAN TO BARANGAY ALVAR TO SITIO BANTOLINAO, BRGY. PALMA GIL TO SITIO TUBILAN, BARANGAY PICHON ROAD CONNECTING CARAGA PUBLIC TERMINAL TO ABACA PROCESSING AND HAND LOOM (DAGMAY) WEAVING IN SUPPORT | Region XI | Region XI | On-Going | ₱110.2M | 97% | High risk61 | —-0.008 |
| 33 | 21LE0133CONSTRUCTION OF DEMOLOC-GUISOK-ALABEL ROAD (P00550618MN) (K0+000.000 TO K5+264.621 WITH EXCEPTIONS), BRGY. GUISOK, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.075 |
| 34 | 21LE0135CONSTRUCTION OF MACOL-KITASTAS-DATU DANWATA ROAD, (STA.0+000-STA.4+575 WITH 75.00M EXEMPTION), BRGY. MACOL, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.074 |
| 35 | 21L00109CONSTRUCTION OF CONCRETE ROAD - NHJ SAKUAN TO BRGY. ALVAR TO SITIO BANTOLINAO, BRGY. PALMA GIL TO SITIO TUBILAN, BRGY. PICHON ROAD CONNECTING CARAGA PUBLIC TERMINAL TO ABACA PROCESSING AND HAND LOOM (DAGMAY) WEAVING IN SUPPORT TO AGRI BUSINESS: ABACA, COR | Region XI | Region XI | On-Going | ₱106.1M | 85% | High risk61 | —-0.000 |
| 36 | 22LE0019NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS DAVAO-SARANGANI COASTAL RD (MALALAG-MALITA-JAS-G), JOSE ABAD SANTOS, DAVAO OCCIDENTAL(K1755 + 800 -K1756 + 800, K1763 + 200- K1765 + 400) | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.068 |
| 37 | 21LE0130CONSTRUCTION OF CALIAN-LAMIDAN BYPASS ROAD, (STA.0+000-STA.5+000), BRGY. LAMIDAN, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.070 |
| 38 | 21LE0131CONSTRUCTION OF CULAMAN-KINAM-MALAPATAN BYPASS ROAD, (STA. 1+755-STA.6+835 WITH EXCEPTIONS), BRGY. CULAMAN, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.069 |
| 39 | 22LB0264CONSTRUCTION OF EVACUATION CENTER (PHASE 1) AT BARANGAY CATALUNAN GRANDE, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | On-Going | ₱151.4M | 92% | Medium risk59 | —-0.006 |
| 40 | 20L00170RECONSTRUCTION TO CONCRETE PAVEMENT ALONG JCT. DAANG MAHARLIKA ROAD - GOV. GREGORIO V. CAÑEDA ROAD - JCT. FS DIZON ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱77.7M | 20% | Medium risk56 | Flagged0.012 |
| 41 | 23LE0013NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS DAVAO-SARANGANI COASTAL RD. (MALALAG-MALITA-JAS-G), JOSE ABAD SANTOS, DAVAO OCCIDENTAL, K1757 + 300 K1760 + 000 | Region XI | Davao Occidental DEO | On-Going | ₱65.1M | 100% | Medium risk54 | —-0.034 |
| 42 | 23LB0093CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE AT PAMANTAWAN, BRGY. MALABOG, PAQUIBATO PROPER, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.086 |
| 43 | 20L00054REPLACEMENT OF BRIDGE (2 INTO 4 LANES) - ANGALAN BRIDGE 2 (B00217MN) ALONG DAVAO - BUKIDNON ROAD, DAVAO CITY | Region XI | Region XI | Completed | ₱57.6M | 100% | Medium risk54 | —-0.039 |
| 44 | 20LB0074WIDENING OF BRIDGE - BUNAWAN BR. 2 (B01619MN) ALONG DAANG MAHARLIKA (MN) | Region XI | Davao City DEO | Completed | ₱62.9M | 100% | Medium risk54 | —-0.026 |
| 45 | 23LB0158CONSTRUCTION OF ROAD AT AGSAM, BRGY. MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱48.3M | 100% | Medium risk53 | —-0.029 |
| 46 | 22LB0078CONSTRUCTION OF EVACUATION CENTER (PHASE 2) AT BARANGAY CATALUNAN GRANDE, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | On-Going | ₱61.1M | 94% | Medium risk52 | —-0.024 |
| 47 | 20LB0040CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, STA. 3+141 TO STA. 3+441, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱86.1M | 100% | Medium risk52 | —-0.053 |
| 48 | 22LG0003ROAD WIDENING ( 2-4 LANES ) ALONG PRES. DIOSDADO P. MACAPAGAL NATL HI - WAY - K1703 +447 - K1705 + 008 , K1708 + 000 - K1708 + 670 , MATI CITY , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱47.5M | 100% | Medium risk52 | —-0.074 |
| 49 | 21LF0059CONCRETING OF ABEJOD ROAD LEADING TO HOSPITAL, BARANGAY POBLACION, CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱53.1M | 100% | Medium risk51 | —-0.069 |
| 50 | 20L00145CONSTRUCTION OF CONCRETE ROAD ALONG BYPASS ROAD AT JCT. ELPIDIO QUIRINO AVE. (TIONKO AVE. SECTION) - JCT. PONCIANO ST. (DAVAO CITY POST OFFICE), DAVAO CITY | Region XI | Region XI | On-Going | ₱46.8M | 95% | Medium risk51 | —-0.017 |