Contractor dossier
133 projects on file, including joint ventures this contractor is part of.
Total projects
133
Total budget
₱6.9B
Average progress
93.2%
Completion rate
66.9%
Below 70%
Average risk score
51.0
Medium risk on average, out of 100
Flagged as unusual
16
12.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 124 | ₱6.4B | 51.4 | 14 | 93.3% |
| Region XII | 8 | ₱552.6M | 46.4 | 2 | 92.2% |
| Region X | 1 | ₱25.9M | 41.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 76 | ₱4.4B | 51.3 | 4 | 96.3% |
| Buildings and Facilities | 26 | ₱779M | 47.1 | 4 | 88.8% |
| Flood Control and Drainage | 16 | ₱777.8M | 48.2 | 0 | 97.8% |
| Bridges | 9 | ₱694.8M | 48.8 | 4 | 96.9% |
| OTHER | 4 | ₱166.2M | 82.0 | 3 | 49.6% |
| GAA 2025 SSP | 1 | ₱112.3M | 95.2 | 1 | 39.4% |
| Water Provision and Storage | 1 | ₱14.9M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 3, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.3M | 39% | High risk95 | Flagged0.041 |
| 24LG0069CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN TIBLAWAN NATIONAL HIGH SCHOOL, BARANGAY TIBLAWAN, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱9.9M | 0% | High risk86 | Flagged0.093 |
| 24LG0067CONSTRUCTION OF 1-STOREY 3 CLASSROOM SCHOOL BUILDING IN SUROP NATIONAL HIGH SCHOOL, BARANGAY SUROP, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱10.1M | 0% | High risk86 | Flagged0.089 |
| 24MC0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1662 + 250 - K1662 + 350, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 98% | High risk81 | Flagged0.012 |
| 19LH0030CONSTRUCTION OF MISSING LINKS/NEW ROADS AT DALAGDAG BRIDGE (PHASE II) ALONG BRGY. FATIMA, PAQUIBATO DISTRICT, BRGY. DALAGDAG-LAMPIANAO, CALINAN DISTRICT, 3RD CONGRESSIONAL DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱49.7M | 100% | High risk76 | —-0.028 |
| 20L00111ROAD UPGRADING OF SO. TAGOBOBOLO, BRGY. SAINZ, MATI - SO. KALASAGAN, BRGY. SAN ISIDRO, LUPON, DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱161.2M | 100% | High risk66 | —-0.042 |
| 22L00001CONSTRUCTION OF VIADUCT (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE)-DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 1, DAVAO CITY | Region XI | Region XI | On-Going | ₱237.1M | 91% | High risk65 | Flagged0.031 |
| 20L00140CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE ONLY) - MA-A BRIDGE II, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 99% | High risk65 | Flagged0.027 |
| 24LG0113REHABILITATION OF CONCRETE ROAD, LUPON POBLACION TO BARANGAY ILANGAY, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱93.6M | 87% | High risk65 | Flagged0.030 |
| 22L00091CONSTRUCTION OF BINONDO - SITIO MANTAPAY ROAD, BAGANGA, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱154.4M | 98% | High risk65 | Flagged0.002 |
| 20L00142CONSTRUCTION OF CONCRETE BRIDGE - TALOMO BRIDGE 4, DAVAO CITY | Region XI | Region XI | On-Going | ₱125.4M | 87% | High risk63 | Flagged0.022 |
| 18L00054CONC. OF DAVAO-BUKIDNON H'WAY(CALINAN POB. PORTION)TO DALAGDAG-FATIMA NAT'L. RD TO PANABO INCL. ROW, | Region XI | Region XI | Completed | ₱127.4M | 100% | High risk63 | —-0.070 |
| 22LH0051CONSTRUCTION OF ROAD ALONG CARMEN TO SITIO TABAK TO LALING TO TAWAN-TAWAN ROAD, BAGUIO DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.076 |
| 22LB0032CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, STA. 2+001 - STA. 2+246, GENEROSO BRIDGE DOWNSTREAM, RIGHT BANK, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱93.4M | 79% | High risk62 | —-0.002 |
| 19L00123CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAVAO OCCIDENTAL GOVERNMENT CENTER), MALITA,DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱141.4M | 99% | High risk62 | Flagged0.007 |
| 23LF0065SURIGAO DEL SUR BDRY - DAVAO OR COASTAL RD - K1689+070 - K1689+130, TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱95.5M | 100% | High risk62 | —-0.061 |
| 21L00132CONSTRUCTION OF CONCRETE ROAD - NHJ BUSO - SO. PAYPAY - TAGBINONGA - SO. CALAPAGAN - SO. MATIGDAO, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱96.4M | 97% | High risk62 | —-0.006 |
| 19L00013ROAD WIDENING ALONG FATIMA-MALABOG ROAD (S00059MN), K1511+341-K1512+663, DAVAO CITY | Region XI | Region XI | Completed | ₱104.4M | 100% | High risk62 | —-0.070 |
| 19L00012ROAD WIDENING ON SPECIFIC LOCATIONS ALONG FATIMA-MALABOG ROAD (S00059MN),K1501+(-422)-K1507+010, DAV | Region XI | Region XI | Completed | ₱100.5M | 100% | High risk62 | —-0.071 |
| 22L00094ROAD WIDENING ALONG DAHICAN-LAWIGAN ROAD (S00114MN), K1717+653 - K1721+418, DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱107.7M | 100% | High risk62 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LG0069CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN TIBLAWAN NATIONAL HIGH SCHOOL, BARANGAY TIBLAWAN, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱9.9M | 0% | High risk86 | Flagged0.093 |
| 24LG0067CONSTRUCTION OF 1-STOREY 3 CLASSROOM SCHOOL BUILDING IN SUROP NATIONAL HIGH SCHOOL, BARANGAY SUROP, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱10.1M | 0% | High risk86 | Flagged0.089 |
| 25MC0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 3, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.3M | 39% | High risk95 | Flagged0.041 |
| 24L00280CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - SAN ISIDRO SUPER HEALTH CENTER, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱11.8M | 1% | Medium risk40 | Flagged0.032 |
| 22L00001CONSTRUCTION OF VIADUCT (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE)-DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 1, DAVAO CITY | Region XI | Region XI | On-Going | ₱237.1M | 91% | High risk65 | Flagged0.031 |
| 24LG0113REHABILITATION OF CONCRETE ROAD, LUPON POBLACION TO BARANGAY ILANGAY, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱93.6M | 87% | High risk65 | Flagged0.030 |
| 20L00140CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE ONLY) - MA-A BRIDGE II, DAVAO CITY | Region XI | Region XI | On-Going | ₱168.5M | 99% | High risk65 | Flagged0.027 |
| 20L00142CONSTRUCTION OF CONCRETE BRIDGE - TALOMO BRIDGE 4, DAVAO CITY | Region XI | Region XI | On-Going | ₱125.4M | 87% | High risk63 | Flagged0.022 |
| 24L00286LGU HOSPITALS - SARAGANI DISTRICT HOSPITAL, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱49.3M | 59% | Medium risk48 | Flagged0.018 |
| 24MC0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1662 + 250 - K1662 + 350, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 98% | High risk81 | Flagged0.012 |
| 20L00170RECONSTRUCTION TO CONCRETE PAVEMENT ALONG JCT. DAANG MAHARLIKA ROAD - GOV. GREGORIO V. CAÑEDA ROAD - JCT. FS DIZON ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱77.7M | 20% | Medium risk56 | Flagged0.012 |
| 19L00123CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAVAO OCCIDENTAL GOVERNMENT CENTER), MALITA,DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱141.4M | 99% | High risk62 | Flagged0.007 |
| 22LG0040REPLACEMENT OF LONGCACOB BR. ALONG NEW VISAYAS-SAN ISIDRO-LONGCACOB RD, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱19M | 96% | Medium risk47 | Flagged0.006 |
| 22LB0012OFF-CARRIAGEWAY IMPROVEMENT - DAVAOCITY DIV RD - K1507+311 - K1507+352,K1510+470 - K1510+850, K1512+528 -K1512+565, K1512+572 - K1512+595,K1512+820 - K1512+860, K1514+581 -K1514+646, K1514+992 - K1515+012 | Region XI | Davao City DEO | On-Going | ₱18.5M | 1% | Medium risk46 | Flagged0.002 |
| 22L00091CONSTRUCTION OF BINONDO - SITIO MANTAPAY ROAD, BAGANGA, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱154.4M | 98% | High risk65 | Flagged0.002 |
| 24L00284LGU HOSPITALS - DON MARCELINO MUNICIPAL HOSPITAL, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱9.9M | 89% | Medium risk45 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20LF0024CONSTRUCTION OF REVETMENT ALONG CATEEL RIVER (UDIONGAN SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.064 |
| 102 | 21LF0055CONCRETING OF ROAD FROM SITIO PALO 4 BARANGAY P.M. SOBRECAREY TO SITIO BATIANO BARANGAY SAN PEDRO (PHASE 1), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱11.9M | 100% | Medium risk46 | —-0.067 |
| 103 | 25LG0009CONSTRUCTION OF CONCRETE ROAD- ROAD FROM JUNCTION BRGY. SAINZ CONNECTING TO SITIO LICOP IN SUPPORT OF CACAO, COFFEE, CORN AND MANGO INDUSTRIES, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱12M | 100% | Medium risk46 | —-0.050 |
| 104 | 22LB0009ROAD WIDENING - DAVAO-COTABATO RD (DAVAO CITY-JCT DIGOS SECT)-K1513+208 - K1513+249, K1513+291 - K1513+320, K1513+350 - K1514+265, K1514+700 - K1514+720, CHAINAGE 3033-CHAINAGE 3100 | Region XI | Davao City DEO | Completed | ₱10.4M | 100% | Medium risk45 | —-0.090 |
| 105 | 24LH0073CONSTRUCTION OF ROAD, MINTAL (TORIL DIST), DAVAO CITY | Region XI | Davao City 2nd DEO | On-Going | ₱9.7M | 100% | Medium risk45 | —-0.059 |
| 106 | 19LG0062CONSTRUCTION OF FLOOD MITIGATION STRUCTURES, CAMOGNA RIVER, BRGY. POBLACION, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.067 |
| 107 | 20LG0046ROAD FROM JUNCTION BRGY. SAINZ CONNECTING TO SITIO LICOP IN SUPPORT OF CACAO , COFFE, CORN AND MANGO INDUSTRIES , MATI CITY , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱4.8M | 100% | Medium risk45 | —-0.075 |
| 108 | 20LB0321ROAD WIDENING ALONG DAVAO - COTABATO RD. (DAVAO CITY - JCT. DIGOS SECT.) K1519+920 - K1519+1100, K1520+048 - K1520+183, K1520+204 - K1520+330, K1520+850 - K1520+950, K1523+310 | Region XI | Davao City DEO | On-Going | ₱10.4M | 59% | Medium risk45 | —-0.008 |
| 109 | 24LG0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAMOGNA RIVER, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱19.2M | 100% | Medium risk45 | —-0.025 |
| 110 | 22LG0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BITANAGAN RIVER , STA. 0+054- STA. 0+136 (R/S), STA. O+057 - STA. 0+232 (L/S) ,MATI CITY , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱28.5M | 100% | Medium risk45 | —-0.065 |
| 111 | 24L00284LGU HOSPITALS - DON MARCELINO MUNICIPAL HOSPITAL, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱9.9M | 89% | Medium risk45 | Flagged0.000 |
| 112 | 18LB0245COMPLETION OF THE CONSTRUCTION OF 3 STOREY DPWH REGIONAL OFFICE XI MULTI-PURPOSE BUILDING DAVAO CITY | Region XI | Davao City DEO | Completed | ₱11.7M | 100% | Medium risk45 | —-0.091 |
| 113 | 20LB0162CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MATINA RIVER, MATINA BRIDGE UPSTREAM, MATINA PANGI AND MATINA BALUSONG SECTION, BOTH BANK, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱24.2M | 100% | Medium risk44 | —-0.074 |
| 114 | 19LF0059CONSTRUCTION OF REVETMENT ALONG CATEEL RIVER (ARAGON SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱44.1M | 100% | Medium risk44 | —-0.064 |
| 115 | 20LB0247CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, GENEROSO BRIDGE UPSTREAM SECTION, RIGHT BANK, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.063 |
| 116 | 19LB0066CONSTRUCTION OF FLOOD MITIGATION STRUCTURES-BUNAWAN RIVER, STA. 2+000-STA. 2+370 WEST SIDE BRGY. BUNAWAN, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.076 |
| 117 | 19LB0068CONSTRUCTION OF FLOOD MITIGATION STRUCTURES-PANACAN RIVER STA. 1+854-STA. 2+137, NORTH SIDE, PANACAN SECTION, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱27.2M | 100% | Medium risk44 | —-0.075 |
| 118 | 19KL0126CONSTRUCTION OF STANDARD THREE-STOREY (9 CL) SCHOOL BUILDING, KALABAYLABAY ES, EL SALVADOR CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱25.9M | 100% | Medium risk41 | —-0.046 |
| 119 | 18LG0112CONSTRUCTION OF CLASSROOMS,MAHAYAG ES , BANAYBANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱16.5M | 100% | Medium risk41 | —-0.035 |
| 120 | 19LG0109CONSTRUCTION OF 2STY4CL (SCIENCE / ICT LABORATORY ), DAWAN NHS, CITY OF MATI, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱16.9M | 100% | Medium risk41 | —-0.032 |
| 121 | 19LG0121CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF MULTI- PURPOSE BUILDING IN MUNICIPALITY OF GOVERNOR GENEROSO , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱21.3M | 100% | Medium risk41 | —-0.029 |
| 122 | 23M00021CONSTRUCTION OF CONCRETE ROAD - JCT. DAVAO-BUKIDNON ROAD TO BRGY. SAN MIGUEL LEADING TO LUPISAN ECOSITES, STA. 1+882 - STA. 3+262, BRGY. SAN MIGUEL, ARAKAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱101.3M | 100% | Medium risk41 | —-0.074 |
| 123 | 24L00280CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - SAN ISIDRO SUPER HEALTH CENTER, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱11.8M | 1% | Medium risk40 | Flagged0.032 |
| 124 | 20MC0009DOROLUMAN-ARAKAN-PRES. ROXAS-KADINGILAN ROAD, COTABATO, ARAKAN & PRES. ROXAS, NORTH COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱96.5M | 100% | Medium risk40 | —-0.068 |
| 125 | 18LG0104CONSTRUCTION OF ACADEMIC BUILDING , SAN ISIDRO CAMPUS , SITIO MALACABAC , BATO-BATO, SAN ISIDRO , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱12.4M | 100% | Medium risk40 | —-0.035 |