Contractor dossier
117 projects on file, including joint ventures this contractor is part of.
Total projects
117
Total budget
₱2.5B
Average progress
99.6%
Completion rate
90.6%
Average risk score
47.4
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 117 | ₱2.5B | 47.4 | 0 | 99.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 88 | ₱1.8B | 44.7 | 0 | 99.6% |
| Flood Control and Drainage | 20 | ₱367.3M | 46.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 3 | ₱28.7M | 88.1 | 0 | 98.5% |
| OTHER | 3 | ₱254.3M | 75.5 | 0 | 100.0% |
| Bridges | 2 | ₱42.5M | 47.3 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱24.8M | 91.9 | 0 | 93.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0119ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, QUEZON-ALABAT-PEREZ RD - K0004 + 750 - K0004 + 850, K0004 + 8 | Region IV-A | Quezon 4th DEO | On-Going | ₱24.8M | 94% | High risk92 | —-0.012 |
| 25DL0043FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SMALL RIVER IMPROVEMENT PROJECT INCLUDING PROTECTION STRUCTURE, TAGKAWA CIS, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱14.4M | 97% | High risk88 | —-0.032 |
| 25DL0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG CAGLATE RIVER, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | High risk88 | —-0.033 |
| 25DL0152ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BREAKWATER, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.5M | 99% | High risk88 | —-0.034 |
| 19DL0108A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM A. REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. TERTIARY ROADS 1. JCT MSR-OLD ZIGZAG RD - K0 | Region IV-A | Quezon 4th DEO | Completed | ₱94.6M | 100% | High risk78 | —-0.030 |
| 17DL0081A. MFO -1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT A. IMPROVEMENT/WIDENING OF NATIONAL ROADS 1. PRIMARY ROADS A. ALONG N1 1. DAANG MAHARLIKA (LZ) - K0135+ -732 - K0135+ -332, K0137+000 - K0138+016, K0139+000 - K0139+093, K0139+324 - K0140+2 | Region IV-A | Quezon 4th DEO | Completed | ₱76M | 100% | High risk75 | —-0.036 |
| 17DL0083A. MFO -1 NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/UPGRADING REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 2. TERTIARY ROADS B. QUEZON-ALABAT-PEREZ RD - K0001+182-K0001+782, K0020+00-K0020+600, K0030+037-K | Region IV-A | Quezon 4th DEO | Completed | ₱83.7M | 100% | High risk74 | —-0.033 |
| 20DL0037C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 18. SITIO CANUMAY-TUMIIS ECOTOURISM ROAD LEADING TO ALABAT ISLAND, BRGY. VILLA NORTE, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | High risk68 | —-0.068 |
| 17DL0097C. MFO-3: MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURE 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS A. TO DECLARED TOURISM DESTINATIONS 1. CAMAGONG-VILLA NORTE ECO-TOURISM | Region IV-A | Quezon 4th DEO | Completed | ₱34M | 100% | High risk65 | —-0.072 |
| 17DL0133A. MFO - 1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT A. IMPROVEMENT/WIDENING OF NATIONAL ROADS 1. SECONDARY ROADS A. MSR OLD ROUTE, CHAINAGE 073 - CHAINAGE 373 | Region IV-A | Quezon 4th DEO | Completed | ₱9.5M | 100% | High risk65 | —-0.074 |
| 17DL0033A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS C. REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. PRIMARY ROADS B. DAANG MAHARLIKA (LZ) - K0187+230 - K0187+600 | Region IV-A | Quezon 4th DEO | Completed | ₱35M | 100% | High risk65 | —-0.072 |
| 20DL0093A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM B. REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROAD 2. TERTIARY ROADS 1. QUEZON-ALABAT-PEREZ RD - K0020+129 - K0020+330, K0020+701 - | Region IV-A | Quezon 4th DEO | Completed | ₱40.7M | 100% | High risk65 | —-0.072 |
| 17DL0019A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM- | Region IV-A | Quezon 4th DEO | Completed | ₱12M | 100% | High risk65 | —-0.071 |
| 18D00035FY 2018 DPWH INFRASTRUCTURE PROGRAM, ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING/PRIMARY ROADS DAANG MAHARLIKA (LZ) QUEZON PROVINCE | Region IV-A | Region IV-A | Completed | ₱139.3M | 100% | High risk64 | —-0.082 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DL0119ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, QUEZON-ALABAT-PEREZ RD - K0004 + 750 - K0004 + 850, K0004 + 8 | Region IV-A | Quezon 4th DEO | On-Going | ₱24.8M | 94% | High risk92 | —-0.012 |
| 2 | 25DL0043FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SMALL RIVER IMPROVEMENT PROJECT INCLUDING PROTECTION STRUCTURE, TAGKAWA CIS, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱14.4M | 97% | High risk88 | —-0.032 |
| 3 | 25DL0154ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG CAGLATE RIVER, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | High risk88 | —-0.033 |
| 4 | 25DL0152ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BREAKWATER, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.5M | 99% | High risk88 | —-0.034 |
| 5 | 19DL0108A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM A. REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. TERTIARY ROADS 1. JCT MSR-OLD ZIGZAG RD - K0 | Region IV-A | Quezon 4th DEO | Completed | ₱94.6M | 100% | High risk78 | —-0.030 |
| 6 | 17DL0081A. MFO -1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT A. IMPROVEMENT/WIDENING OF NATIONAL ROADS 1. PRIMARY ROADS A. ALONG N1 1. DAANG MAHARLIKA (LZ) - K0135+ -732 - K0135+ -332, K0137+000 - K0138+016, K0139+000 - K0139+093, K0139+324 - K0140+2 | Region IV-A | Quezon 4th DEO | Completed | ₱76M | 100% | High risk75 | —-0.036 |
| 7 | 17DL0083A. MFO -1 NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/UPGRADING REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 2. TERTIARY ROADS B. QUEZON-ALABAT-PEREZ RD - K0001+182-K0001+782, K0020+00-K0020+600, K0030+037-K | Region IV-A | Quezon 4th DEO | Completed | ₱83.7M | 100% | High risk74 | —-0.033 |
| 8 | 20DL0037C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 18. SITIO CANUMAY-TUMIIS ECOTOURISM ROAD LEADING TO ALABAT ISLAND, BRGY. VILLA NORTE, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | High risk68 | —-0.068 |
| 9 | 17DL0097C. MFO-3: MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURE 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS A. TO DECLARED TOURISM DESTINATIONS 1. CAMAGONG-VILLA NORTE ECO-TOURISM | Region IV-A | Quezon 4th DEO | Completed | ₱34M | 100% | High risk65 | —-0.072 |
| 10 | 17DL0133A. MFO - 1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT A. IMPROVEMENT/WIDENING OF NATIONAL ROADS 1. SECONDARY ROADS A. MSR OLD ROUTE, CHAINAGE 073 - CHAINAGE 373 | Region IV-A | Quezon 4th DEO | Completed | ₱9.5M | 100% | High risk65 | —-0.074 |
| 11 | 17DL0033A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS C. REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. PRIMARY ROADS B. DAANG MAHARLIKA (LZ) - K0187+230 - K0187+600 | Region IV-A | Quezon 4th DEO | Completed | ₱35M | 100% | High risk65 | —-0.072 |
| 12 | 20DL0093A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM B. REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROAD 2. TERTIARY ROADS 1. QUEZON-ALABAT-PEREZ RD - K0020+129 - K0020+330, K0020+701 - | Region IV-A | Quezon 4th DEO | Completed | ₱40.7M | 100% | High risk65 | —-0.072 |
| 13 | 17DL0019A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM- | Region IV-A | Quezon 4th DEO | Completed | ₱12M | 100% | High risk65 | —-0.071 |
| 14 | 18D00035FY 2018 DPWH INFRASTRUCTURE PROGRAM, ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING/PRIMARY ROADS DAANG MAHARLIKA (LZ) QUEZON PROVINCE | Region IV-A | Region IV-A | Completed | ₱139.3M | 100% | High risk64 | —-0.082 |
| 15 | 18DL0249I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM C. CONSTRUCTION OF MISSING LINKS/ NEW ROADS 3. QUEZON-ALABAT-PEREZ CIRCUMFERENTIAL ROAD, INCL. ROW, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱88.9M | 100% | Medium risk54 | —-0.096 |
| 16 | 20DL0068A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM D. REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. PRIMARY ROADS 1. JCT MSR-OLD ZIGZAG RD - K0153+236 - K0153+25 | Region IV-A | Quezon 4th DEO | Completed | ₱78.8M | 100% | Medium risk54 | —-0.100 |
| 17 | 18DL0174A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM A. REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES 1. TERTIATY ROADS 1. JCT MSR-OLD ZIGZAG RD - JCT. MSR-OLD ZIGZAG | Region IV-A | Quezon 4th DEO | Completed | ₱70.2M | 100% | Medium risk54 | —-0.100 |
| 18 | 20DL0069A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM A. ROAD WIDENING 1. PRIMARY ROAD 1. DAANG MAHARLIKA (LZ)-K0143+000- K0143+332, K0143+392-K0143+449, K0144+099-K0145+179 | Region IV-A | Quezon 4th DEO | Completed | ₱61.4M | 100% | Medium risk54 | —-0.102 |
| 19 | 21DL0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, VIÑAS-TINIGUIBAN TAMIS SINAG DAPDAP ROAD LEADING TO SAMPITAN BEACH, CALAUAG, QUEZON, PACKAGE III | Region IV-A | Quezon 4th DEO | Completed | ₱53.1M | 100% | Medium risk52 | —-0.102 |
| 20 | 25DL0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), VILLA MANZANO NORTE - PAMBUHAN - MAINIT NORTE - RIZAL ECO-TOURISM ROAD LEADING TO MAI | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | Medium risk51 | —-0.078 |
| 21 | 18DL0043I. OPERATIONS A. ORAGIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM B. REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE 1. PRIMARY ROADS 1. DAANG MAHARLIKA (LZ) - K0186+9 | Region IV-A | Quezon 4th DEO | Completed | ₱47.3M | 100% | Medium risk51 | —-0.104 |
| 22 | 21DL0092ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS, QUEZON - ALABAT - PEREZ CIRCUMFERENTIAL ROAD, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱47.5M | 100% | Medium risk51 | —-0.104 |
| 23 | 25DL0030CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), ACCESS ROADS IN SUPPORT OF COCO SUGAR PROCESSING CENTER, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk51 | —-0.105 |
| 24 | 23DL0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES 12. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS | Region IV-A | Quezon 4th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.103 |
| 25 | 24DL0046ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS 5. QUEZON - ALABAT - PEREZ CIRCUMFERENTIAL ROAD, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.103 |