Opening the dossier…
Opening the dossier…
Contractor dossier
67 projects on file, including joint ventures this contractor is part of.
Total projects
67
Total budget
₱5.4B
Average progress
95.5%
Completion rate
80.6%
Average risk score
61.8
High risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 67 | ₱5.4B | 61.8 | 0 | 95.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 59 | ₱5.1B | 61.5 | 0 | 97.5% |
| Roads | 4 | ₱63.5M | 61.0 | 0 | 61.0% |
| OTHER | 2 | ₱226.9M | 78.7 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱19.6M | 53.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 16F00072MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONST. OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, ROAD COMPONENTS (BRGY. OSIAO-BRGY. STO. NIÑO),SORSOGON 1ST LD, BACON, SORSOGON PROVINCE | Region V | Region V | Completed | ₱183.3M | 100% | High risk80 | —-0.005 |
| 16F00121MFO1-REHAB./CONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, LIGAO-PIODURAN ROAD, LIGAO AND PIODURAN, ALBAY PROVINCE | Region V | Region V | Completed | ₱43.6M | 100% | High risk77 | —-0.033 |
| 20F00143REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN JOSE-SAN ISIDRO SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱181.3M | 100% | High risk76 | —-0.003 |
| 20F00144REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN ISIDRO - SAGRADA SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱181.5M | 100% | High risk76 | —-0.003 |
| 24F00391REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SOLONG RIVER, BRGY. LIBOD, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱173.7M | 92% | High risk74 | —-0.025 |
| 22F00010OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD MITIGATION STRUCTURE AT TIBU RIVER, LEGAZPI CITY, ALBAY 2ND LEGISLATIVE DIST | Region V | Region V | On-Going | ₱144.7M | 46% | High risk73 | —-0.002 |
| 23FO0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XIV-2023: (1) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER AT SAN ISIDRO, OAS, ALBAY; AND (2) CONSTRUC, | Region V | Albay 3rd DEO | On-Going | ₱144.6M | 95% | High risk72 | —-0.023 |
| 23FO0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES & BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XV - FY 2 | Region V | Albay 3rd DEO | Completed | ₱146.6M | 100% | High risk72 | —-0.065 |
| 23FO0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING INFRASTRUCTURES/FACILITIES & BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XVI-2023 : (1) CO | Region V | Albay 3rd DEO | Completed | ₱146.6M | 100% | High risk72 | —-0.066 |
| 24FO0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN BRIDGE | Region V | Albay 3rd DEO | On-Going | ₱144.7M | 95% | High risk72 | —-0.033 |
| 24FO0086ORGANIZATIONAL OUTCOME 2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINANGANURAN RIVER FLOOD CONTROL STRUCTURE ALONG SPILLW | Region V | Albay 3rd DEO | Completed | ₱144.8M | 100% | High risk72 | —-0.066 |
| 24FO0080ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER, PUROK | Region V | Albay 3rd DEO | On-Going | ₱139.7M | 94% | High risk72 | —-0.032 |
| 22F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF QUINALE A RIVER FLOOD MITIGATION STRUCTURE(POLANGUI AND LIBON SECTION), ALBAY, PO | Region V | Region V | Completed | ₱192.7M | 100% | High risk71 | —-0.055 |
| 24FO0055ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF LUKSONG RIVER, ZONE 4 S | Region V | Albay 3rd DEO | On-Going | ₱93.1M | 96% | High risk71 | —-0.041 |
| 23FO0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATING STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGOS RIVER, STA. CRUZ, LIB | Region V | Albay 3rd DEO | On-Going | ₱144.7M | 81% | High risk71 | —-0.021 |
| 24FO0100ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (FACING DOWNSTREAM ALONG RIVER | Region V | Albay 3rd DEO | Completed | ₱144.8M | 100% | High risk71 | —-0.066 |
| 22F00054OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF PAWILI RIVER FLOOD MITIGATION STRUCTURE, BRGY. SAN JOSE AND BRGY. BA | Region V | Region V | Completed | ₱97.1M | 100% | High risk70 | —-0.077 |
| 24FB0148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY BANADERO-BARANGAY BUDIAO,DARAGA, | Region V | Albay 2nd DEO | On-Going | ₱96.5M | 81% | High risk70 | —-0.039 |
| 23FO0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XVIII-2023: (1) CONSTRUCTION OF AGOS RIVER CONTROL STRUCTURE, BARANGAY LOURDES, POLANGUI, ALBAY; (2) CONSTRUCTION OF AGOS | Region V | Albay 3rd DEO | Completed | ₱144.6M | 100% | High risk69 | —-0.065 |
| 22FO0100CLUSTER I: (1) CONSTRUCTION OF KALAKRAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY PISTOLA, OAS, ALBAY; (2) CONSTRUCTION OF NAGASGASAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY OBALIW RINAS, OAS, ALBAY | Region V | Albay 3rd DEO | Completed | ₱98M | 100% | High risk69 | —-0.076 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 16F00072MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONST. OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, ROAD COMPONENTS (BRGY. OSIAO-BRGY. STO. NIÑO),SORSOGON 1ST LD, BACON, SORSOGON PROVINCE | Region V | Region V | Completed | ₱183.3M | 100% | High risk80 | —-0.005 |
| 2 | 16F00121MFO1-REHAB./CONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, LIGAO-PIODURAN ROAD, LIGAO AND PIODURAN, ALBAY PROVINCE | Region V | Region V | Completed | ₱43.6M | 100% | High risk77 | —-0.033 |
| 3 | 20F00143REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN JOSE-SAN ISIDRO SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱181.3M | 100% | High risk76 | —-0.003 |
| 4 | 20F00144REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN ISIDRO - SAGRADA SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱181.5M | 100% | High risk76 | —-0.003 |
| 5 | 24F00391REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SOLONG RIVER, BRGY. LIBOD, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱173.7M | 92% | High risk74 | —-0.025 |
| 6 | 22F00010OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD MITIGATION STRUCTURE AT TIBU RIVER, LEGAZPI CITY, ALBAY 2ND LEGISLATIVE DIST | Region V | Region V | On-Going | ₱144.7M | 46% | High risk73 | —-0.002 |
| 7 | 23FO0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XIV-2023: (1) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER AT SAN ISIDRO, OAS, ALBAY; AND (2) CONSTRUC, | Region V | Albay 3rd DEO | On-Going | ₱144.6M | 95% | High risk72 | —-0.023 |
| 8 | 23FO0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES & BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XV - FY 2 | Region V | Albay 3rd DEO | Completed | ₱146.6M | 100% | High risk72 | —-0.065 |
| 9 | 23FO0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING INFRASTRUCTURES/FACILITIES & BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XVI-2023 : (1) CO | Region V | Albay 3rd DEO | Completed | ₱146.6M | 100% | High risk72 | —-0.066 |
| 10 | 24FO0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN BRIDGE | Region V | Albay 3rd DEO | On-Going | ₱144.7M | 95% | High risk72 | —-0.033 |
| 11 | 24FO0086ORGANIZATIONAL OUTCOME 2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINANGANURAN RIVER FLOOD CONTROL STRUCTURE ALONG SPILLW | Region V | Albay 3rd DEO | Completed | ₱144.8M | 100% | High risk72 | —-0.066 |
| 12 | 24FO0080ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER, PUROK | Region V | Albay 3rd DEO | On-Going | ₱139.7M | 94% | High risk72 | —-0.032 |
| 13 | 22F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF QUINALE A RIVER FLOOD MITIGATION STRUCTURE(POLANGUI AND LIBON SECTION), ALBAY, PO | Region V | Region V | Completed | ₱192.7M | 100% | High risk71 | —-0.055 |
| 14 | 24FO0055ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF LUKSONG RIVER, ZONE 4 S | Region V | Albay 3rd DEO | On-Going | ₱93.1M | 96% | High risk71 | —-0.041 |
| 15 | 23FO0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATING STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGOS RIVER, STA. CRUZ, LIB | Region V | Albay 3rd DEO | On-Going | ₱144.7M | 81% | High risk71 | —-0.021 |
| 16 | 24FO0100ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (FACING DOWNSTREAM ALONG RIVER | Region V | Albay 3rd DEO | Completed | ₱144.8M | 100% | High risk71 | —-0.066 |
| 17 | 22F00054OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF PAWILI RIVER FLOOD MITIGATION STRUCTURE, BRGY. SAN JOSE AND BRGY. BA | Region V | Region V | Completed | ₱97.1M | 100% | High risk70 | —-0.077 |
| 18 | 24FB0148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY BANADERO-BARANGAY BUDIAO,DARAGA, | Region V | Albay 2nd DEO | On-Going | ₱96.5M | 81% | High risk70 | —-0.039 |
| 19 | 23FO0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XVIII-2023: (1) CONSTRUCTION OF AGOS RIVER CONTROL STRUCTURE, BARANGAY LOURDES, POLANGUI, ALBAY; (2) CONSTRUCTION OF AGOS | Region V | Albay 3rd DEO | Completed | ₱144.6M | 100% | High risk69 | —-0.065 |
| 20 | 22FO0100CLUSTER I: (1) CONSTRUCTION OF KALAKRAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY PISTOLA, OAS, ALBAY; (2) CONSTRUCTION OF NAGASGASAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY OBALIW RINAS, OAS, ALBAY | Region V | Albay 3rd DEO | Completed | ₱98M | 100% | High risk69 | —-0.076 |
| 21 | 21F00031OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF NAGAS RIVER FLOOD MITIGATION STRUCTURE, NAGAS, OAS, ALBAY, OAS, ALBAY | Region V | Region V | Completed | ₱106.1M | 100% | High risk68 | —-0.073 |
| 22 | 22FO0056CLUSTER III-2022: 1.) CONSTRUCTION OF PINANGANURAN RIVER CONTROL STRUCTURE, BARANGAY VILLA PETRONA, LIBON, ALBAY; AND 2.) CONSTRUCTION OF PINANGANURAN RIVER CONTROL STRUCTURE, BARANGAY SAN JOSE, LIBON, ALBAY | Region V | Albay 3rd DEO | Completed | ₱98M | 100% | High risk68 | —-0.076 |
| 23 | 21F00003OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF CATBURAWAN RIVER FLOOD CONTROL STRUCTURE, OAS AND LIGAO CITY, ALBAY, OA | Region V | Region V | Completed | ₱106.1M | 100% | High risk68 | —-0.073 |
| 24 | 22FO0057CLUSTER IV: REHAB. OF BACOLOD FLOOD CONTROL STRUCTURE (LEFT SIDE FACING DOWNSTREAM OF BACOLOD BRIDGE) PHASE II IN LIBON, ALBAY AND REHAB. OF MAROCMOC BRIDGE FLOOD CONTROL STRUCTURE (RIGHT SIDE FACING UPSTREAM AND LEFT SIDE FACING DOWNSTREAM OF MAROCMOC BR | Region V | Albay 3rd DEO | Completed | ₱93.1M | 100% | High risk67 | —-0.077 |
| 25 | 18FO0092REPAIR/REHABILITATION/IMPROVEMENT OF ROAD SLOPE PROTECTION ALONG LIGAO-TABACO ROAD (LEFT BANK), K0512+400 - K0512+535 | Region V | Albay 3rd DEO | Completed | ₱17.4M | 100% | High risk67 | —-0.067 |