Contractor dossier
67 projects on file, including joint ventures this contractor is part of.
Total projects
67
Total budget
₱5.4B
Average progress
95.5%
Completion rate
80.6%
Average risk score
61.8
High risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 67 | ₱5.4B | 61.8 | 0 | 95.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 59 | ₱5.1B | 61.5 | 0 | 97.5% |
| Roads | 4 | ₱63.5M | 61.0 | 0 | 61.0% |
| OTHER | 2 | ₱226.9M | 78.7 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱19.6M | 53.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 16F00072MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONST. OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, ROAD COMPONENTS (BRGY. OSIAO-BRGY. STO. NIÑO),SORSOGON 1ST LD, BACON, SORSOGON PROVINCE | Region V | Region V | Completed | ₱183.3M | 100% | High risk80 | —-0.005 |
| 16F00121MFO1-REHAB./CONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, LIGAO-PIODURAN ROAD, LIGAO AND PIODURAN, ALBAY PROVINCE | Region V | Region V | Completed | ₱43.6M | 100% | High risk77 | —-0.033 |
| 20F00143REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN JOSE-SAN ISIDRO SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱181.3M | 100% | High risk76 | —-0.003 |
| 20F00144REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN ISIDRO - SAGRADA SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱181.5M | 100% | High risk76 | —-0.003 |
| 24F00391REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SOLONG RIVER, BRGY. LIBOD, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱173.7M | 92% | High risk74 | —-0.025 |
| 22F00010OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD MITIGATION STRUCTURE AT TIBU RIVER, LEGAZPI CITY, ALBAY 2ND LEGISLATIVE DIST | Region V | Region V | On-Going | ₱144.7M | 46% | High risk73 | —-0.002 |
| 23FO0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XIV-2023: (1) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER AT SAN ISIDRO, OAS, ALBAY; AND (2) CONSTRUC, | Region V | Albay 3rd DEO | On-Going | ₱144.6M | 95% | High risk72 | —-0.023 |
| 23FO0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES & BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XV - FY 2 | Region V | Albay 3rd DEO | Completed | ₱146.6M | 100% | High risk72 | —-0.065 |
| 23FO0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING INFRASTRUCTURES/FACILITIES & BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XVI-2023 : (1) CO | Region V | Albay 3rd DEO | Completed | ₱146.6M | 100% | High risk72 | —-0.066 |
| 24FO0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN BRIDGE | Region V | Albay 3rd DEO | On-Going | ₱144.7M | 95% | High risk72 | —-0.033 |
| 24FO0086ORGANIZATIONAL OUTCOME 2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINANGANURAN RIVER FLOOD CONTROL STRUCTURE ALONG SPILLW | Region V | Albay 3rd DEO | Completed | ₱144.8M | 100% | High risk72 | —-0.066 |
| 24FO0080ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER, PUROK | Region V | Albay 3rd DEO | On-Going | ₱139.7M | 94% | High risk72 | —-0.032 |
| 22F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF QUINALE A RIVER FLOOD MITIGATION STRUCTURE(POLANGUI AND LIBON SECTION), ALBAY, PO | Region V | Region V | Completed | ₱192.7M | 100% | High risk71 | —-0.055 |
| 24FO0055ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF LUKSONG RIVER, ZONE 4 S | Region V | Albay 3rd DEO | On-Going | ₱93.1M | 96% | High risk71 | —-0.041 |
| 23FO0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATING STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGOS RIVER, STA. CRUZ, LIB | Region V | Albay 3rd DEO | On-Going | ₱144.7M | 81% | High risk71 | —-0.021 |
| 24FO0100ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (FACING DOWNSTREAM ALONG RIVER | Region V | Albay 3rd DEO | Completed | ₱144.8M | 100% | High risk71 | —-0.066 |
| 22F00054OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF PAWILI RIVER FLOOD MITIGATION STRUCTURE, BRGY. SAN JOSE AND BRGY. BA | Region V | Region V | Completed | ₱97.1M | 100% | High risk70 | —-0.077 |
| 24FB0148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY BANADERO-BARANGAY BUDIAO,DARAGA, | Region V | Albay 2nd DEO | On-Going | ₱96.5M | 81% | High risk70 | —-0.039 |
| 23FO0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XVIII-2023: (1) CONSTRUCTION OF AGOS RIVER CONTROL STRUCTURE, BARANGAY LOURDES, POLANGUI, ALBAY; (2) CONSTRUCTION OF AGOS | Region V | Albay 3rd DEO | Completed | ₱144.6M | 100% | High risk69 | —-0.065 |
| 22FO0100CLUSTER I: (1) CONSTRUCTION OF KALAKRAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY PISTOLA, OAS, ALBAY; (2) CONSTRUCTION OF NAGASGASAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY OBALIW RINAS, OAS, ALBAY | Region V | Albay 3rd DEO | Completed | ₱98M | 100% | High risk69 | —-0.076 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23FN0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, NABUA, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱9.8M | 100% | Medium risk54 | —-0.065 |
| 52 | 23FN0096CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, IRIGA CITY, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱9.8M | 100% | Medium risk53 | —-0.064 |
| 53 | 21FO0104CONSTRUCTION/IMPROVEMENT OF LUKSONG RIVER FLOOD CONTROL, SANTICON, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱38.2M | 100% | Medium risk52 | —-0.088 |
| 54 | 21FO0057CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG CABILOGAN RIVER, MATACON, AGOS, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱37.8M | 100% | Medium risk52 | —-0.088 |
| 55 | 18F00026OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. & IMPR. OF FLOOD CONTROL DIKES IN LIBON, ALBAY FOR CRITICAL SECTIONS OF BARANGAYS EAST CARISAC, SAN AGU | Region V | Region V | Completed | ₱69.4M | 100% | Medium risk51 | —-0.081 |
| 56 | 20FL0038REHABILITATION OF PAWEK BRIDGE FLOOD CONTROL STRUCTURE(UPSTREAM AND DOWNSTREAM OF PAWEK BRIDGE) BULA | Region V | Sorsogon 2nd DEO | Completed | ₱24.5M | 100% | Medium risk51 | —-0.085 |
| 57 | 20FL0039REHABILITATION OF SOLSOGON BRIDGE FLOOD CONTROL STRUCTURE (UPSTREAM AND DOWNSTREAM OF SOLSOGON BRIDG | Region V | Sorsogon 2nd DEO | Completed | ₱24.5M | 100% | Medium risk51 | —-0.085 |
| 58 | 22FN0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG WARAS RIVER, BAGUMBAYAN SECTION, BAAO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱65.2M | 100% | Medium risk50 | —-0.086 |
| 59 | 20FN0060002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE, DOWNSTREAM WARAS RIVER, BAAO SECTION, BAAO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱62.7M | 100% | Medium risk50 | —-0.086 |
| 60 | 20FN0036002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALONG WARAS RIVER, DOWNSTREAM IMBAN BRIDGE, SAN ANTONIO POB, NABUA CAM. SUR | Region V | Camarines Sur 5th DEO | Completed | ₱62.3M | 100% | Medium risk50 | —-0.085 |
| 61 | 20FN0035002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DOWNSTREAM ALONG BICOL RIVER, STO. DOMINGO BR, INAPATAN SECT, NABUA CAM. SUR | Region V | Camarines Sur 5th DEO | Completed | ₱62.3M | 100% | Medium risk50 | —-0.083 |
| 62 | 22FN0032SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG IGAMOT CREEK, SALVACION AND BUSAKAN, BARANGAY SAN VICENTE, BAAO, CAM SUR | Region V | Camarines Sur 5th DEO | Completed | ₱47.3M | 100% | Medium risk48 | —-0.088 |
| 63 | 22FN0023SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG BICOL RIVER, DOWNSTREAM OF PANOYPOYAN BRIDGE, BULA, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱47.3M | 100% | Medium risk48 | —-0.087 |
| 64 | 21FN0084CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE ALONG BARIT RIVER, FRANCIA SECTION, IRIGA CITY SECTION A: STA. 23+552.00 STA. 23+802.00; SECTION B: STA. 23+876.00 STA. 23+904.00 | Region V | Camarines Sur 5th DEO | Completed | ₱35.8M | 100% | Medium risk47 | —-0.088 |
| 65 | 21FN0063CONSTRUCTION/IMPROVEMENT OF RIVERBANK SLOPE PROTECTION ALONG WARAS RIVER, UPSTREAM OF WARAS BRIDGE, SAN JUAN-BAGUMBAYAN, BAAO, CAMARINES SUR STA. 15+963.00 STA. 16+230.00 | Region V | Camarines Sur 5th DEO | Completed | ₱33.5M | 100% | Medium risk47 | —-0.088 |
| 66 | 21FN0079CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL STRUCTURE, ALONG BICOL RIVER BASIN, LA PURISIMA NABUA, CAMARINES SUR STA. 9+983.00 STA. 10+234.00 (RS) | Region V | Camarines Sur 5th DEO | Completed | ₱32M | 100% | Medium risk47 | —-0.088 |
| 67 | 21FN0086OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DOWNSTREAM OF SPILLWAY, PHASE II, STA. BARBARA, NABUA, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.088 |