Contractor dossier
244 projects on file, including joint ventures this contractor is part of.
Total projects
244
Total budget
₱9.5B
Average progress
98.2%
Completion rate
95.9%
Average risk score
46.0
Medium risk on average, out of 100
Flagged as unusual
4
1.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 230 | ₱9B | 46.5 | 4 | 98.1% |
| Region IV-B | 14 | ₱502.5M | 37.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱5.2B | 48.4 | 0 | 99.7% |
| Flood Control and Drainage | 47 | ₱2.2B | 47.4 | 0 | 100.0% |
| Buildings and Facilities | 40 | ₱735.3M | 35.5 | 1 | 98.2% |
| Bridges | 39 | ₱1B | 45.6 | 1 | 97.5% |
| Water Provision and Storage | 5 | ₱10.5M | 19.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱52.3M | 91.5 | 2 | 18.7% |
| OTHER | 2 | ₱120.4M | 72.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 95.7 | 0 | 90.0% |
| GAA 2025 OO-2 | 1 | ₱105.1M | 93.4 | 0 | 43.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0135ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0257 + 300 - K0260 + 900 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 90% | High risk96 | —-0.004 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
| 25DJ0087OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM FLOOD CONTROL STRUCTURE, PACKAGE 4, LUCENA | Region IV-A | Quezon 2nd DEO | On-Going | ₱105.1M | 44% | High risk93 | —-0.015 |
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DJ0016OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 2), LUCENA CITY | Region IV-A | Quezon 2nd DEO | On-Going | ₱79.1M | 100% | High risk77 | —-0.004 |
| 17D00023ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD K0266+025 - K0266+838, K0269+862-K0270+088 & | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk71 | —-0.044 |
| 20DM0042NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 2, QUEZON, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.062 |
| 20DC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, LIPA-BALETE RD | Region IV-A | Batangas 3rd DEO | Completed | ₱41.3M | 100% | High risk68 | —-0.043 |
| 18DM0083CONSTRUCTION OF GRAVEL ROAD AND CONCRETE ROAD - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 1, QUEZON PROVINCE | Region IV-A | Quezon 3rd DEO | Completed | ₱165.5M | 100% | High risk65 | —-0.077 |
| 17DL0055A. MFO-1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT D. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE 1. PRIMARY ROADS A. DAANG MAHARLIKA (LZ) - K0216+476 - K0217+024 | Region IV-A | Quezon 4th DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.067 |
| 17DL0018A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM- | Region IV-A | Quezon 4th DEO | Completed | ₱18.5M | 100% | High risk65 | —-0.071 |
| 17DM0005REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG SN FRANCISCO-SN ANDRES-SN NARCISO RD - 359 + 954 - K0360 + 141, K0366+52 | Region IV-A | Quezon 3rd DEO | Completed | ₱32.4M | 100% | High risk65 | —-0.071 |
| 22DJ0124OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (DOWNSTREAM-PACKAGE 1), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.071 |
| 22DJ0125OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 2), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 22DJ0071OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL, BRGY. COTTA (PHASE 3), | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 24DJ0112OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 31), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 23DJ0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 9), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
| 23DJ0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 8), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 22DM0130CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH BRIDGE, GENERAL LUNA, QUEZONGENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.065 |
| 22DM0110SIPAG: FLOOD MITIGATION STRUCTURES PROTECTION PUBLIC INFRASTRUCTURE / FACILITIES - CONSTRUCTION OF SEAWALL,CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DI0157CONSTRUCTION OF 4STY20CL, NIUGAN ES, CABUYAO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱68.2M | 29% | Medium risk56 | Flagged0.017 |
| 25DJ0135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, QUIPOT BR. (B02945LZ) ALONG QUEZON-BATANGAS RD | Region IV-A | Quezon 2nd DEO | On-Going | ₱60.9M | 1% | High risk63 | Flagged0.014 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 21DM0064NETWORK DEVELOPMENT CONSTRUCTION OF MISSING LINKS/ NEW ROADS- SAN FRANCISCO- SAN ANDRES-SAN NARCISO ROAD, PACKAGE 1, QUEZONSAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱72.4M | 100% | Medium risk54 | —-0.095 |
| 52 | 19DM0023ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - SECONDARY ROADS - MULANAY-SN FRANCISCO RD - K0278+000 - K0278+983, K0280+000 - K0281+447, K0289+000 - K0290+989, K0293+362 - K0293+793, MULANAY - SN FRANCISCO RD | Region IV-A | Quezon 3rd DEO | Completed | ₱77.6M | 100% | Medium risk54 | —-0.097 |
| 53 | 21DM0046NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAN FRANCISCO- SAN ANDRES- SAN NARCISO ROAD, PACKAGE 4, QUEZON SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱72.4M | 100% | Medium risk54 | —-0.097 |
| 54 | 19DM0039CONCRETING OF POBLACION-BANABA PROVINCIAL RD, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱76.4M | 100% | Medium risk54 | —-0.097 |
| 55 | 19DM0001ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0371+350-K0372+000, K0373+924-K0374+284, K0374+309-K0375+242 | Region IV-A | Quezon 3rd DEO | Completed | ₱75.4M | 100% | Medium risk54 | —-0.097 |
| 56 | 18DM0059CONSTRUCTION OF ROAD, BRGY. CAMFLORA SITIO SIGARAS, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱67.2M | 100% | Medium risk54 | —-0.098 |
| 57 | 19DM0042NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD, PACKAGE 2, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.099 |
| 58 | 18DM0069CONSTRUCTION/REHABILITATION OF CAMFLORA-SIGARAS-MAKAPAYA-YUGNO ROAD, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱57.6M | 100% | Medium risk54 | —-0.099 |
| 59 | 17DM0023CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, KATUTOD BR. (B02534LZ) ALONG GUMACA-PITOGO-MULANAY-SN NARCISO RD, BARANGAY SAN JOSE, GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱8.1M | 100% | Medium risk54 | —-0.036 |
| 60 | 17DM0025CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, OMON BR. (B02536LZ) ALONG GUMACA-PITOGO-MULANAY-SN NARCISO RD, BARANGAY SAN VICENTE, GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱8.2M | 100% | Medium risk54 | —-0.036 |
| 61 | 19DM0007NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - MULANAY-SN FRANCISCO RD - K0305+660 - K0306+375, K0306+387 - K0309+055, K0309+070 - K0309+935, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱57.5M | 100% | Medium risk54 | —-0.099 |
| 62 | 19DM0038NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD, PACKAGE 1, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱57.5M | 100% | Medium risk54 | —-0.099 |
| 63 | 17DM0043CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGE, BITAOG BRIDGE (B02963LZ), BARANGAY BITAOG, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱5.3M | 100% | Medium risk53 | —-0.036 |
| 64 | 23DJ0016OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 1), LUCENA CIT | Region IV-A | Quezon 2nd DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.076 |
| 65 | 21DJ0053OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER, BRGY. SAMPA | Region IV-A | Quezon 2nd DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.085 |
| 66 | 22DJ0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG QUIAPO RIVER, BRGY. PAHINGA NORTE TO BRGY. POBLACION, C | Region IV-A | Quezon 2nd DEO | Completed | ₱77.2M | 100% | Medium risk53 | —-0.080 |
| 67 | 22DM0009CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATANAUAN RIVER (STA. 1+625 - STA. 2+000) CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱69M | 100% | Medium risk53 | —-0.077 |
| 68 | 22DM0039CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATANAUAN RIVER (STA. 3+625 - STA. 4+000), CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱69M | 100% | Medium risk53 | —-0.077 |
| 69 | 22DM0045CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CATANAUAN RIVER (STA. 4+202 - STA. 4+577) CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱69M | 100% | Medium risk53 | —-0.079 |
| 70 | 22DM0053CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATANAUAN RIVER (STA. 3+250 - STA. 3+625) CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱69M | 100% | Medium risk53 | —-0.080 |
| 71 | 21DM0053CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CABUYAO RIVERPADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.082 |
| 72 | 21DJ0124LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDING AND OTHER STRUCTURES, MULTI-PURPOSE / FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CANDELARIA MUNICIPAL BUILDING), BRGY. POBLACION, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱39.6M | 100% | Medium risk52 | —-0.098 |
| 73 | 22DJ0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A 11239, PREVENTIVE MAINTENANCE ALONG MSR DIVERSION RD-K0127+768-K0128+219, K0128+251-K0128+350 | Region IV-A | Quezon 2nd DEO | Completed | ₱52.8M | 100% | Medium risk52 | —-0.105 |
| 74 | 20DJ0122LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING, (LUCENA CITY GENERAL HOSPITAL), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱39.6M | 100% | Medium risk52 | —-0.098 |
| 75 | 20DM0006ASSET PRESERVATION: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - MULANAY - SN FRANCISCO RD - K0276+988 - K0278+000, K0284+823 - K0285+741, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱52.5M | 100% | Medium risk52 | —-0.100 |