Contractor dossier
244 projects on file, including joint ventures this contractor is part of.
Total projects
244
Total budget
₱9.5B
Average progress
98.2%
Completion rate
95.9%
Average risk score
46.0
Medium risk on average, out of 100
Flagged as unusual
4
1.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 230 | ₱9B | 46.5 | 4 | 98.1% |
| Region IV-B | 14 | ₱502.5M | 37.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱5.2B | 48.4 | 0 | 99.7% |
| Flood Control and Drainage | 47 | ₱2.2B | 47.4 | 0 | 100.0% |
| Buildings and Facilities | 40 | ₱735.3M | 35.5 | 1 | 98.2% |
| Bridges | 39 | ₱1B | 45.6 | 1 | 97.5% |
| Water Provision and Storage | 5 | ₱10.5M | 19.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱52.3M | 91.5 | 2 | 18.7% |
| OTHER | 2 | ₱120.4M | 72.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 95.7 | 0 | 90.0% |
| GAA 2025 OO-2 | 1 | ₱105.1M | 93.4 | 0 | 43.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0135ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0257 + 300 - K0260 + 900 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 90% | High risk96 | —-0.004 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
| 25DJ0087OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM FLOOD CONTROL STRUCTURE, PACKAGE 4, LUCENA | Region IV-A | Quezon 2nd DEO | On-Going | ₱105.1M | 44% | High risk93 | —-0.015 |
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DJ0016OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 2), LUCENA CITY | Region IV-A | Quezon 2nd DEO | On-Going | ₱79.1M | 100% | High risk77 | —-0.004 |
| 17D00023ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD K0266+025 - K0266+838, K0269+862-K0270+088 & | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk71 | —-0.044 |
| 20DM0042NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 2, QUEZON, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.062 |
| 20DC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, LIPA-BALETE RD | Region IV-A | Batangas 3rd DEO | Completed | ₱41.3M | 100% | High risk68 | —-0.043 |
| 18DM0083CONSTRUCTION OF GRAVEL ROAD AND CONCRETE ROAD - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 1, QUEZON PROVINCE | Region IV-A | Quezon 3rd DEO | Completed | ₱165.5M | 100% | High risk65 | —-0.077 |
| 17DL0055A. MFO-1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT D. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE 1. PRIMARY ROADS A. DAANG MAHARLIKA (LZ) - K0216+476 - K0217+024 | Region IV-A | Quezon 4th DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.067 |
| 17DL0018A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM- | Region IV-A | Quezon 4th DEO | Completed | ₱18.5M | 100% | High risk65 | —-0.071 |
| 17DM0005REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG SN FRANCISCO-SN ANDRES-SN NARCISO RD - 359 + 954 - K0360 + 141, K0366+52 | Region IV-A | Quezon 3rd DEO | Completed | ₱32.4M | 100% | High risk65 | —-0.071 |
| 22DJ0124OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (DOWNSTREAM-PACKAGE 1), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.071 |
| 22DJ0125OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 2), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 22DJ0071OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL, BRGY. COTTA (PHASE 3), | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 24DJ0112OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 31), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 23DJ0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 9), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
| 23DJ0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 8), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 22DM0130CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH BRIDGE, GENERAL LUNA, QUEZONGENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.065 |
| 22DM0110SIPAG: FLOOD MITIGATION STRUCTURES PROTECTION PUBLIC INFRASTRUCTURE / FACILITIES - CONSTRUCTION OF SEAWALL,CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DI0157CONSTRUCTION OF 4STY20CL, NIUGAN ES, CABUYAO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱68.2M | 29% | Medium risk56 | Flagged0.017 |
| 25DJ0135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, QUIPOT BR. (B02945LZ) ALONG QUEZON-BATANGAS RD | Region IV-A | Quezon 2nd DEO | On-Going | ₱60.9M | 1% | High risk63 | Flagged0.014 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 18DM0074CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD, GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0258+612 - K0260+346 , CATANAUAN SECTION | Region IV-A | Quezon 3rd DEO | Completed | ₱52.3M | 100% | Medium risk51 | —-0.100 |
| 77 | 23DJ0015OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE WIDENING OF PERMANENT BRIDGES, MASIN BR. (B04795LZ) ALONG CANDELARIA BYPASS RD. CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱47M | 100% | Medium risk51 | —-0.060 |
| 78 | 22DM0140SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD ALONG POBLACION - CADLIT WITH BRIDGE, BUENAVISTA, QUEZONBUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.051 |
| 79 | 23DC0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), BUGAAN-GULOD-BUSO-BUSO ROAD LEADING TO TAAL LAKE CIRCUMFERENTIAL, LAUREL, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.105 |
| 80 | 20DJ0005OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS, LUCENA-DALAHICAN PORT RD-K0133+(-209)-K0133+684, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱48.7M | 100% | Medium risk51 | —-0.105 |
| 81 | 18DM0075OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - GUMACA-PITOGO: MULANAY-SN NARCISO RD - K0260+512 - K0264+785 , CATANAUAN SECTION | Region IV-A | Quezon 3rd DEO | Completed | ₱48.7M | 100% | Medium risk51 | —-0.102 |
| 82 | 19DM0041CONSTRUCTION OF ROAD, BRGY. TAGBAKAN - MANGERO, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.101 |
| 83 | 19DM0060REHABILITATION/RECONSTRUCTION OF TANZA - MAURABE, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.101 |
| 84 | 21DJ0091LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF STA. LUCIA - BULAKIN BY-PASS ROAD, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 85 | 19DM0058REHABILITATION OF MATICOL UMAGOS FARM-TO-MARKET ROAD, MABUNGA, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.101 |
| 86 | 20DJ0010OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, CANDELARIA BYPASS RD, K0107+560-K0107+787, K0107+931-K0108+245.50, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.106 |
| 87 | 20DJ0092LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAAN MAHARLIKA (LZ) K0118+224.00-K0118+672.00, K0118+814.00-K0119+010.00, K0119+023.00-K0119+735.00 SAR | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.105 |
| 88 | 20DJ0011OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ)-K0111+048-K0111+735, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.105 |
| 89 | 20DJ0032OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMS, NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, MSR DIVERSION RD-K0130+910-K0132+037, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.105 |
| 90 | 20DM0011NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ABUYON - BUENAVISTA RD - K0259+575 - K0262+393, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.099 |
| 91 | 21DJ0048OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, BARANGAY TALAO-TALAO, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱53.1M | 100% | Medium risk50 | —-0.080 |
| 92 | 21DM0062NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD K0317+958.00 - K0319+138.00SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.100 |
| 93 | 20DM0009NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - MULANAY - SN FRANCISCO RD - K0303+353 - K0303+648, K0303+681 -K0305+419, K0309+070 - K0309+986, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.101 |
| 94 | 20DC0202LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, REHABILITATION OF MULTI-PURPOSE BUILDING, BALETE, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱11.4M | 100% | Medium risk50 | —-0.106 |
| 95 | 19DM0079CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND SEAWALL, BRGY. CAMFLORA, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.082 |
| 96 | 18DM0013OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - MSR JCT - LOPEZ-CATANAUAN RD - K0238+899 - K0241+680, K0241+717 - K0243+326, GENERAL LUNA - CATANAUAN SECTION | Region IV-A | Quezon 3rd DEO | Completed | ₱46.8M | 100% | Medium risk49 | —-0.102 |
| 97 | 22DJ0135OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 7), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 98 | 22DJ0147OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL, BRGY. COTTA, LUCENA CITY, QUEZON (PACKAGE 3) | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.080 |
| 99 | 18DJ0064002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL/SERVICE ROAD, BARANGAY 5 TO BARANGAY 8, LUCENA CITY | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.083 |
| 100 | 22DJ0149OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL, BRGY. COTTA, LUCENA CITY, QUEZON (PACKAGE 2) | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |