244 projects on file, including joint ventures this contractor is part of.
Total projects
244
Total budget
₱9.5B
Average progress
98.2%
Completion rate
95.9%
Average risk score
46.0
Medium risk on average, out of 100
Flagged as unusual
4
1.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 230 | ₱9B | 46.5 | 4 | 98.1% |
| Region IV-B | 14 | ₱502.5M | 37.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱5.2B | 48.4 | 0 | 99.7% |
| Flood Control and Drainage | 47 | ₱2.2B | 47.4 | 0 | 100.0% |
| Buildings and Facilities | 40 | ₱735.3M | 35.5 | 1 | 98.2% |
| Bridges | 39 | ₱1B | 45.6 | 1 | 97.5% |
| Water Provision and Storage | 5 | ₱10.5M | 19.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱52.3M | 91.5 | 2 | 18.7% |
| OTHER | 2 | ₱120.4M | 72.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 95.7 | 0 | 90.0% |
| GAA 2025 OO-2 | 1 | ₱105.1M | 93.4 | 0 | 43.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0135ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0257 + 300 - K0260 + 900 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 90% | High risk96 | —-0.004 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
| 25DJ0087OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM FLOOD CONTROL STRUCTURE, PACKAGE 4, LUCENA | Region IV-A | Quezon 2nd DEO | On-Going | ₱105.1M | 44% | High risk93 | —-0.015 |
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DJ0016OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 2), LUCENA CITY | Region IV-A | Quezon 2nd DEO | On-Going | ₱79.1M | 100% | High risk77 | —-0.004 |
| 17D00023ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD K0266+025 - K0266+838, K0269+862-K0270+088 & | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk71 | —-0.044 |
| 20DM0042NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 2, QUEZON, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.062 |
| 20DC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, LIPA-BALETE RD | Region IV-A | Batangas 3rd DEO | Completed | ₱41.3M | 100% | High risk68 | —-0.043 |
| 18DM0083CONSTRUCTION OF GRAVEL ROAD AND CONCRETE ROAD - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 1, QUEZON PROVINCE | Region IV-A | Quezon 3rd DEO | Completed | ₱165.5M | 100% | High risk65 | —-0.077 |
| 17DL0055A. MFO-1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT D. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE 1. PRIMARY ROADS A. DAANG MAHARLIKA (LZ) - K0216+476 - K0217+024 | Region IV-A | Quezon 4th DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.067 |
| 17DL0018A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM- | Region IV-A | Quezon 4th DEO | Completed | ₱18.5M | 100% | High risk65 | —-0.071 |
| 17DM0005REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG SN FRANCISCO-SN ANDRES-SN NARCISO RD - 359 + 954 - K0360 + 141, K0366+52 | Region IV-A | Quezon 3rd DEO | Completed | ₱32.4M | 100% | High risk65 | —-0.071 |
| 22DJ0124OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (DOWNSTREAM-PACKAGE 1), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.071 |
| 22DJ0125OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 2), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 22DJ0071OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL, BRGY. COTTA (PHASE 3), | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 24DJ0112OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 31), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 23DJ0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 9), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
| 23DJ0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 8), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 22DM0130CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH BRIDGE, GENERAL LUNA, QUEZONGENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.065 |
| 22DM0110SIPAG: FLOOD MITIGATION STRUCTURES PROTECTION PUBLIC INFRASTRUCTURE / FACILITIES - CONSTRUCTION OF SEAWALL,CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DI0157CONSTRUCTION OF 4STY20CL, NIUGAN ES, CABUYAO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱68.2M | 29% | Medium risk56 | Flagged0.017 |
| 25DJ0135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, QUIPOT BR. (B02945LZ) ALONG QUEZON-BATANGAS RD | Region IV-A | Quezon 2nd DEO | On-Going | ₱60.9M | 1% | High risk63 | Flagged0.014 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 19DM0016CONSTRUCTION OF MULTI-PURPOSE LIVELIHOOD TRAINING CENTER, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.102 |
| 127 | 20DJ0088LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, ROAD REHABILITATION IN BARANGAY ISABANG-BOCOHAN-DOMOIT ROAD, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.108 |
| 128 | 22DJ0043OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, IYAM BR. (B02935LZ) ALONG MSR DIVERSION RD | Region IV-A | Quezon 2nd DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.068 |
| 129 | 19DM0097CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIBRARY), UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.102 |
| 130 | 22DM0079BRIDGE - RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - SAMPALOC BR. (B032661LZ)ALONG SN FRANCISCO - SN ANDRES - SN NARCISO RDSAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.063 |
| 131 | 22DJ0025OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-WIDENING OF PERMANENT BRIDGES, MAYUWI BR. (B04790LZ) ALONG MSR DIVERSION RD | Region IV-A | Quezon 2nd DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.069 |
| 132 | 22DJ0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF HANGING BRIDGE, BARANGAY LALIG, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.067 |
| 133 | 18DM0012OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - CATANAUAN-BUENAVISTA RD K0250+292 - K0255+096, CATANAUAN SECTION | Region IV-A | Quezon 3rd DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.102 |
| 134 | 18DM0003RETROFITTING/STRENGTHENING OF BRIDGE - MULANAY BR. (B02965LZ), MULANAY-SN FRANCISCO RD | Region IV-A | Quezon 3rd DEO | Completed | ₱5.9M | 100% | Medium risk47 | —-0.063 |
| 135 | 18DM0026RETROFITTING/STRENGTHENING OF BRIDGE -GUINHALINAN BR. (B01580LZ), ABUYON - BUENAVISTA RD | Region IV-A | Quezon 3rd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.065 |
| 136 | 18DM0047CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SN FRANCISCO - SN ANDRES - SN NARCISO RD - K0365+603 - K0365+623, K0372+327 - K0372+360, K0375+620 - K0375+656, K0376+039 - K0376+184, K0379+080 - K0379+150, K0379+920 - K0379+945, K0382+577 - K0382+622 | Region IV-A | Quezon 3rd DEO | Completed | ₱31.4M | 100% | Medium risk47 | —-0.102 |
| 137 | 18DM0039CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - SN FRANCISCO - SN ANDRES SN NARCISO RD - K0371+400 - K0372+300, K0372+600 - K0373+000, K0387+433 - K0387+888, K0388+276 - K0388+730, K0391+000 - K0391+896, SAN NARCISO - SAN ANDRES SECTION | Region IV-A | Quezon 3rd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.103 |
| 138 | 18DM0038CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - P BURGOS - POTOTANIN JCT - K0158+698 - K0162+698, PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.4M | 100% | Medium risk47 | —-0.104 |
| 139 | 22DJ0116OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-WIDENING OF PERMANENT BRIDGES, DUNGON BR. (B03072LZ) ALONG LUCENA-DALAHICAN PORT RD. LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱20.8M | 100% | Medium risk47 | —-0.057 |
| 140 | 22DJ0041OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, DUMACAA BR. (B02940LZ) ALONG MSR OLD ROUTE | Region IV-A | Quezon 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.067 |
| 141 | 19DM0034ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0318+312 - K0318+467, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.102 |
| 142 | 22DM0001ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO - SN ANDRES-SN NARCISO RD - K0399 + 103 - K0401 + 804SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱33.7M | 100% | Medium risk47 | —-0.103 |
| 143 | 22DM0021ASSET PRESERVATION - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0268 + 085 - K0269 + 085, K0269 + 132 - K0271 + 000MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.6M | 100% | Medium risk47 | —-0.103 |
| 144 | 18DM0016PAVING OF UNPAVED ROADS - CATANAUAN - BUENAVISTA RD - K0270+088 -K0270+104, K0277+487 -K0278+600, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱41.6M | 100% | Medium risk47 | —-0.103 |
| 145 | 18DM0036CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - ABUYON - BUENAVISTA RD - K0258+000 -K0258+335, K0258+335 - K0258+651, K0258+747 - K0258+944, K0258+964- K0259+289, K0259+645 -K0260+122, K0261+066 - K0261+470, K0261+625 -K0262+480, K0262+480 - K0262+604 | Region IV-A | Quezon 3rd DEO | Completed | ₱38.4M | 100% | Medium risk47 | —-0.103 |
| 146 | 20DM0030ASSET PRESERVATION: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0244+494 - K0246+929, GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱34M | 100% | Medium risk47 | —-0.104 |
| 147 | 22EA0141IMPROVEMENT OF LAPU-LAPU - BUYABOD ROAD, STA. CRUZ, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱84.1M | 100% | Medium risk47 | —-0.079 |
| 148 | 18DM0062CONSTRUCTION OF MUNICIPAL HALL, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19.2M | 100% | Medium risk47 | —-0.093 |
| 149 | 21DJ0064OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION ALONG DUMACAA RIVER BARANGAY IX | Region IV-A | Quezon 2nd DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.079 |
| 150 | 21DJ0050OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION ALONG IYAM RIVER, BARANGAY COTT | Region IV-A | Quezon 2nd DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.084 |