Contractor dossier
244 projects on file, including joint ventures this contractor is part of.
Total projects
244
Total budget
₱9.5B
Average progress
98.2%
Completion rate
95.9%
Average risk score
46.0
Medium risk on average, out of 100
Flagged as unusual
4
1.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 230 | ₱9B | 46.5 | 4 | 98.1% |
| Region IV-B | 14 | ₱502.5M | 37.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱5.2B | 48.4 | 0 | 99.7% |
| Flood Control and Drainage | 47 | ₱2.2B | 47.4 | 0 | 100.0% |
| Buildings and Facilities | 40 | ₱735.3M | 35.5 | 1 | 98.2% |
| Bridges | 39 | ₱1B | 45.6 | 1 | 97.5% |
| Water Provision and Storage | 5 | ₱10.5M | 19.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱52.3M | 91.5 | 2 | 18.7% |
| OTHER | 2 | ₱120.4M | 72.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 95.7 | 0 | 90.0% |
| GAA 2025 OO-2 | 1 | ₱105.1M | 93.4 | 0 | 43.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0135ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0257 + 300 - K0260 + 900 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 90% | High risk96 | —-0.004 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
| 25DJ0087OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM FLOOD CONTROL STRUCTURE, PACKAGE 4, LUCENA | Region IV-A | Quezon 2nd DEO | On-Going | ₱105.1M | 44% | High risk93 | —-0.015 |
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DJ0016OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 2), LUCENA CITY | Region IV-A | Quezon 2nd DEO | On-Going | ₱79.1M | 100% | High risk77 | —-0.004 |
| 17D00023ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD K0266+025 - K0266+838, K0269+862-K0270+088 & | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk71 | —-0.044 |
| 20DM0042NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 2, QUEZON, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.062 |
| 20DC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, LIPA-BALETE RD | Region IV-A | Batangas 3rd DEO | Completed | ₱41.3M | 100% | High risk68 | —-0.043 |
| 18DM0083CONSTRUCTION OF GRAVEL ROAD AND CONCRETE ROAD - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 1, QUEZON PROVINCE | Region IV-A | Quezon 3rd DEO | Completed | ₱165.5M | 100% | High risk65 | —-0.077 |
| 17DL0055A. MFO-1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT D. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE 1. PRIMARY ROADS A. DAANG MAHARLIKA (LZ) - K0216+476 - K0217+024 | Region IV-A | Quezon 4th DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.067 |
| 17DL0018A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM- | Region IV-A | Quezon 4th DEO | Completed | ₱18.5M | 100% | High risk65 | —-0.071 |
| 17DM0005REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG SN FRANCISCO-SN ANDRES-SN NARCISO RD - 359 + 954 - K0360 + 141, K0366+52 | Region IV-A | Quezon 3rd DEO | Completed | ₱32.4M | 100% | High risk65 | —-0.071 |
| 22DJ0124OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (DOWNSTREAM-PACKAGE 1), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.071 |
| 22DJ0125OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 2), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 22DJ0071OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL, BRGY. COTTA (PHASE 3), | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 24DJ0112OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 31), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 23DJ0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 9), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
| 23DJ0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 8), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 22DM0130CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH BRIDGE, GENERAL LUNA, QUEZONGENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.065 |
| 22DM0110SIPAG: FLOOD MITIGATION STRUCTURES PROTECTION PUBLIC INFRASTRUCTURE / FACILITIES - CONSTRUCTION OF SEAWALL,CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DI0157CONSTRUCTION OF 4STY20CL, NIUGAN ES, CABUYAO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱68.2M | 29% | Medium risk56 | Flagged0.017 |
| 25DJ0135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, QUIPOT BR. (B02945LZ) ALONG QUEZON-BATANGAS RD | Region IV-A | Quezon 2nd DEO | On-Going | ₱60.9M | 1% | High risk63 | Flagged0.014 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 19DJ0109002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, DUMACAA RIVER FLOOD CONTROL/SERVICE ROAD, LEON GUINTO STREET, BRGY | Region IV-A | Quezon 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.084 |
| 152 | 21DJ0079OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVER CONTROL BRGY. 11, LUCENA CITY | Region IV-A | Quezon 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.084 |
| 153 | 21DJ0057OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVER CONTROL, BRGY. COTTA (PHASE II), LUCENA CITY | Region IV-A | Quezon 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.086 |
| 154 | 20DJ0041OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL/SERVICE ROAD, BRGY. 8, LUCENA CITY | Region IV-A | Quezon 2nd DEO | Completed | ₱32.7M | 100% | Medium risk47 | —-0.086 |
| 155 | 20DJ0043OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG BANTILAN RIVER, BRGY. MANGGALANG BANTILAN, SARIAYA, QUEZ | Region IV-A | Quezon 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.088 |
| 156 | 21DD0251LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, CONSTRUCTION OF SLOPE PROTECTION ALONG CAWONGAN - TAMAK BRIDGE, PADRE GARCIA, BATA | Region IV-A | Batangas 4th DEO | Completed | ₱23.8M | 100% | Medium risk46 | —-0.089 |
| 157 | 19DJ0107CONSTRUCTION OF SLOPE PROTECTION ALONG MORONG RIVER, SITIO LIGAA BARANGAY IBABANG TALIM, LUCENA CITY | Region IV-A | Quezon 2nd DEO | Completed | ₱8.9M | 100% | Medium risk46 | —-0.085 |
| 158 | 21DC0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, BUGAAN - GULOD - BUSO - BUSO ROAD LEADING TO TAAL LAKE CIRCUMFERENTIAL, BRGY. GULOD, LAUREL, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.109 |
| 159 | 19DC0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.109 |
| 160 | 22DC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CONSTRUCTION OF BUGAAN-GULOD-BUSO-BUSO ROAD LEADING TO TAAL LAKE CIRCUMFERENTIAL, LAUREL | Region IV-A | Batangas 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.109 |
| 161 | 21DD0174ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION WITH FLOOD | Region IV-A | Batangas 4th DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.089 |
| 162 | 21DC0161ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, TALISAY - LAUREL - AGONCILLO RD - K0096+544 - K0096+6 | Region IV-A | Batangas 3rd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.109 |
| 163 | 18DM0056CONSTRUCTION OF RIVER CONTROL ALONG MACALELON RIVER IN POBLACION AREA AND CONSTRUCTION OF SEAWALL IN BRGY. CASTILLO & LUCTOB, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Terminated | ₱33.6M | 100% | Medium risk46 | —-0.055 |
| 164 | 18DM0052CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND SEAWALL ALONG CATANAUAN RIVER, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.4M | 100% | Medium risk46 | —-0.078 |
| 165 | 22DJ0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, PREVENTIVE MAINTENANCE ALONG DAANG MAHARLIKA (LZ)-K0102+937-K0103+317 CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱26.5M | 100% | Medium risk46 | —-0.106 |
| 166 | 22DM0006CONSTRUCTION OF FLOOD CONTROL OF HINGUIWIN RIVER, BRGY. HINGUIWIN PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.087 |
| 167 | 22EA0191CONSTRUCTION/IMPROVEMENT OF TORRIJOS COMMERCIAL COMPLEX INCLUDING SITE DEVELOPMENT, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱89.1M | 100% | Medium risk46 | —-0.068 |
| 168 | 18DM0015PAVING OF UNPAVED ROADS - SN FRANCISCO - SN ANDRES - SN NARCISO RD. - K0363+076 - K0363+896, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.105 |
| 169 | 20DC0153LOCAL PROGRAM, CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION OF ROADS, CITY OF TANAUAN, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱13.2M | 100% | Medium risk46 | —-0.110 |
| 170 | 18DM0022CONSTRUCTION OF ACCESS ROAD LEADING TO CATANAUAN BEACH, MATANDANG SABANG SILANGAN - MATANDANG SABANG KANLURAN, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱28.2M | 100% | Medium risk46 | —-0.104 |
| 171 | 18DM0037CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - MULANAY - SN FRANCISCO RD - K0301+524 - K0301+696, K0301+880 - K0301+920, K0302+720 - K0302+920, K0303+016 - K0303+068, K0303+398 - K0303+648, K0303+800 - K0304+070, K0304+070 - K0304+200, K0304+530 - K0304+ | Region IV-A | Quezon 3rd DEO | Completed | ₱24.4M | 100% | Medium risk46 | —-0.104 |
| 172 | 19DM0022ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - MULANAY-SN FRANCISCO RD-K0296+035 - K0296+098, K0300+593 - K0300+654, K0300+973 - K0301+008, MULANAY SN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱16.7M | 100% | Medium risk46 | —-0.104 |
| 173 | 19DM0094CONSTRUCTION OF ROAD, BRGY. BALANACAN, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.105 |
| 174 | 18DC0155CONSTRUCTION OF CLASSROOMS BATCH 1, FOUR STOREY EIGHT CLASSROOM, STA. ANASTACIA-SAN RAFAEL NATIONAL | Region IV-A | Batangas 3rd DEO | Completed | ₱20.1M | 100% | Medium risk46 | —-0.055 |
| 175 | 24DC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), BUGAAN-GULOD-BUSO-BUSO ROAD LEADING TO TAAL LAKE CIRCUMFERENTIAL, LAUREL, BATA | Region IV-A | Batangas 3rd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.108 |