Contractor dossier
244 projects on file, including joint ventures this contractor is part of.
Total projects
244
Total budget
₱9.5B
Average progress
98.2%
Completion rate
95.9%
Average risk score
46.0
Medium risk on average, out of 100
Flagged as unusual
4
1.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 230 | ₱9B | 46.5 | 4 | 98.1% |
| Region IV-B | 14 | ₱502.5M | 37.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 107 | ₱5.2B | 48.4 | 0 | 99.7% |
| Flood Control and Drainage | 47 | ₱2.2B | 47.4 | 0 | 100.0% |
| Buildings and Facilities | 40 | ₱735.3M | 35.5 | 1 | 98.2% |
| Bridges | 39 | ₱1B | 45.6 | 1 | 97.5% |
| Water Provision and Storage | 5 | ₱10.5M | 19.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱52.3M | 91.5 | 2 | 18.7% |
| OTHER | 2 | ₱120.4M | 72.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 95.7 | 0 | 90.0% |
| GAA 2025 OO-2 | 1 | ₱105.1M | 93.4 | 0 | 43.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0135ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0257 + 300 - K0260 + 900 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 90% | High risk96 | —-0.004 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
| 25DJ0087OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM FLOOD CONTROL STRUCTURE, PACKAGE 4, LUCENA | Region IV-A | Quezon 2nd DEO | On-Going | ₱105.1M | 44% | High risk93 | —-0.015 |
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DJ0016OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 2), LUCENA CITY | Region IV-A | Quezon 2nd DEO | On-Going | ₱79.1M | 100% | High risk77 | —-0.004 |
| 17D00023ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD K0266+025 - K0266+838, K0269+862-K0270+088 & | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk71 | —-0.044 |
| 20DM0042NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 2, QUEZON, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.062 |
| 20DC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, LIPA-BALETE RD | Region IV-A | Batangas 3rd DEO | Completed | ₱41.3M | 100% | High risk68 | —-0.043 |
| 18DM0083CONSTRUCTION OF GRAVEL ROAD AND CONCRETE ROAD - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 1, QUEZON PROVINCE | Region IV-A | Quezon 3rd DEO | Completed | ₱165.5M | 100% | High risk65 | —-0.077 |
| 17DL0055A. MFO-1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT D. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE 1. PRIMARY ROADS A. DAANG MAHARLIKA (LZ) - K0216+476 - K0217+024 | Region IV-A | Quezon 4th DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.067 |
| 17DL0018A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS B. REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM- | Region IV-A | Quezon 4th DEO | Completed | ₱18.5M | 100% | High risk65 | —-0.071 |
| 17DM0005REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG SN FRANCISCO-SN ANDRES-SN NARCISO RD - 359 + 954 - K0360 + 141, K0366+52 | Region IV-A | Quezon 3rd DEO | Completed | ₱32.4M | 100% | High risk65 | —-0.071 |
| 22DJ0124OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (DOWNSTREAM-PACKAGE 1), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.071 |
| 22DJ0125OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 2), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 22DJ0071OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL, BRGY. COTTA (PHASE 3), | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 24DJ0112OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 31), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.072 |
| 23DJ0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 9), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
| 23DJ0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 8), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 22DM0130CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH BRIDGE, GENERAL LUNA, QUEZONGENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.065 |
| 22DM0110SIPAG: FLOOD MITIGATION STRUCTURES PROTECTION PUBLIC INFRASTRUCTURE / FACILITIES - CONSTRUCTION OF SEAWALL,CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.074 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DJ0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BRIONES, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.3M | 7% | High risk88 | Flagged0.024 |
| 24DI0157CONSTRUCTION OF 4STY20CL, NIUGAN ES, CABUYAO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱68.2M | 29% | Medium risk56 | Flagged0.017 |
| 25DJ0135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, QUIPOT BR. (B02945LZ) ALONG QUEZON-BATANGAS RD | Region IV-A | Quezon 2nd DEO | On-Going | ₱60.9M | 1% | High risk63 | Flagged0.014 |
| 25DJ0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 3, BARANGAY PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48M | 30% | High risk95 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 22EA0190CONSTRUCTION OF LEGISLATIVE BUILDING INCLUDING IMPROVEMENT OF MUNICPAL HALL, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱69.3M | 100% | Medium risk46 | —-0.075 |
| 177 | 24DC0026CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), POBLACION - AS-IS - NIYUGAN ECOTOURISM ROAD LEADING TO LAUREL TOURISM SPOTS AND | Region IV-A | Batangas 3rd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.106 |
| 178 | 18DM0033PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - SN FRANCISCO - SN ANDRES - SN NARCISO RD - K0373+310 - K0374+000, SAN ANDRES SECTION | Region IV-A | Quezon 3rd DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.103 |
| 179 | 17DM0059CONSTRUCTION OF MULTI PURPOSE BUILDING (BARANGAY HALL), BARANGAY TAGBACAN IBABA, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱2.9M | 100% | Medium risk45 | —-0.069 |
| 180 | 18DM0040CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - CATANAUAN - BUENAVISTA RD - K0259+626 - K0259+974, K0260+416 - K0260+454, K0260+454 - K0260+696, CATANAUAN - BUENAVISTA RD | Region IV-A | Quezon 3rd DEO | Completed | ₱5.3M | 100% | Medium risk45 | —-0.104 |
| 181 | 18DL0054CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 3STY 9CL ATIMONAN NCHS (2UNITS), ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱48M | 100% | Medium risk45 | —-0.019 |
| 182 | 17DM0099CONSTRUCTION OF BUILDING (LGU ANNEX), GEN. LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱3M | 100% | Medium risk45 | —-0.071 |
| 183 | 19DD0533CONCRETING OF BRGY. TALAIBON FMR, BRGY. TALAIBON, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.051 |
| 184 | 19DD0518CONCRETING OF BRGY. CALUBCUB II-BRGY. BULSA FMR, BRGY. CALUBCUB II AND BRGY. BULSA, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.050 |
| 185 | 20DC0222CONCRETING OF FARM TO MARKET ROAD FOR BARANGAY BALAKILONG, LAUREL, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.056 |
| 186 | 19DJ0129CONCRETING OF BRGY. CONCEPCION BANAHAW FMR, BRGY. CONCEPCION BANAHAW, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.055 |
| 187 | 19DJ0123CONCRETING OF BRGY. MASALUKOT IV FMR, BRGY. MASALUKOT IV, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.056 |
| 188 | 23EA0006ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, DR. DAMIAN REYES RD (BOAC SIDE) - K0011+261 - K0012+038, K0012+286 - K0012+336, K0020+000 - K0020+575 | Region IV-B | Marinduque DEO | Completed | ₱48.1M | 100% | Medium risk42 | —-0.088 |
| 189 | 22EA0233REHABILITATION OF BRGY. PAKASKASAN - BRGY, BANGWAYIN ROAD, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱49M | 100% | Medium risk42 | —-0.085 |
| 190 | 19DC0058LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REPAIR/REHAB/IMPROVEMENT OF LOCAL ROADS IN THE MUNICIPALITY OF LAUREL | Region IV-A | Batangas 3rd DEO | Completed | ₱4.7M | 100% | Medium risk42 | —-0.105 |
| 191 | 24EA0070CONSTRUCTION OF 2-STOREY 10-CLASSROOM SCHOOL BUILDING AT TORRIJOS CENTRAL SCHOOL, BRGY. POBLACION, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱39.7M | 100% | Medium risk41 | —-0.040 |
| 192 | 20DC0141LOCAL PROGRAM, CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION OF ROADS, LAUREL, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱4.7M | 100% | Medium risk41 | —-0.107 |
| 193 | 18DM0127CONSTRUCTION OF TWO (2)-STOREY FOUR (4)-CLASSROOM SCHOOL BUILDING AT SABANG PRIMARY SCHOOL, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱12.2M | 100% | Medium risk41 | —-0.059 |
| 194 | 17DM0174CONSTRUCTION OF THREE-STOREY THREE-UNIT WORKSHOP BUILDING AT HUYON-UYON NATIONAL HIGH SCHOOL, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱14.8M | 100% | Medium risk40 | —-0.031 |
| 195 | 17DM0181CONSTRUCTION OF THREE-STOREY THREE-UNIT WORKSHOP BUILDING AT LEONARDA D. VERA CRUZ NHS (FORMERLY PANAON NHS), UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱14.5M | 100% | Medium risk39 | —-0.030 |
| 196 | 23EA0044ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0005+200 - K0006+575 | Region IV-B | Marinduque DEO | Completed | ₱42.7M | 100% | Medium risk38 | —-0.091 |
| 197 | 23EA0045ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0103+810 - K0103+935, K0103+959 - K0104+510, K0104+855 - K0105+188 | Region IV-B | Marinduque DEO | Completed | ₱33.5M | 100% | Medium risk38 | —-0.092 |
| 198 | 18EA0028CONSTRUCTION OF SITIO-BATO JANAGDONG FLOOD CONTROL STRUCTURE | Region IV-B | Marinduque DEO | Completed | ₱22M | 100% | Medium risk37 | —-0.074 |
| 199 | 19EA0027CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. PAKASKASAN, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱4.8M | 100% | Medium risk34 | —-0.084 |
| 200 | 18EA0129IMPROVEMENT OF MPB (SUHA PORT), BARANGAY SUHA, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱8.6M | 100% | Medium risk34 | —-0.083 |