Contractor dossier
247 projects on file, including joint ventures this contractor is part of.
Total projects
247
Total budget
₱14.7B
Average progress
91.4%
Completion rate
66.0%
Below 70%
Average risk score
57.9
Medium risk on average, out of 100
Flagged as unusual
27
10.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 163 | ₱11.6B | 63.1 | 18 | 90.8% |
| National Capital Region | 29 | ₱841.5M | 48.2 | 2 | 91.6% |
| Region XIII | 19 | ₱974.8M | 44.5 | 0 | 99.8% |
| Region VI | 10 | ₱151.2M | 42.7 | 1 | 94.2% |
| Region VII | 6 | ₱166.7M | 47.3 | 0 | 100.0% |
| Region XI | 5 | ₱255.7M | 48.4 | 2 | 97.7% |
| Region III | 3 | ₱219.1M | 86.6 | 3 | 26.4% |
| Region V | 3 | ₱134.6M | 46.5 | 0 | 100.0% |
| Region X | 3 | ₱94.6M | 30.6 | 0 | 100.0% |
| Region IV-A | 2 | ₱132.1M | 53.5 | 0 | 51.1% |
| Central Office | 1 | ₱44.5M | 63.9 | 0 | 100.0% |
| Region II | 1 | ₱38.2M | 58.9 | 0 | 100.0% |
| Region I | 1 | ₱44.8M | 58.7 | 1 | 100.0% |
| Region XII | 1 | ₱24.7M | 29.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱7.7B | 60.8 | 8 | 92.5% |
| Flood Control and Drainage | 75 | ₱4.8B | 56.2 | 7 | 86.8% |
| Buildings and Facilities | 39 | ₱1.3B | 47.7 | 5 | 98.5% |
| Bridges | 9 | ₱184.3M | 57.7 | 1 | 100.0% |
| OTHER | 6 | ₱453.8M | 74.7 | 4 | 83.8% |
| GAA 2025 SSP | 2 | ₱190.6M | 95.1 | 2 | 39.5% |
| GAA 2025 OO-2 | 1 | ₱124M | 92.4 | 0 | 96.9% |
| Bridges, Roads | 1 | ₱25.6M | 44.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CL0226CONSTRUCTION OF ACCESS ROAD/ DIVERSION ROAD INCLUDING DRAINAGE STRUCTURE, DAAN KALIKASAN TO UACON, PHASE 2, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.3M | 32% | High risk95 | Flagged0.030 |
| 25CL0227CONSTRUCTION OF ACCESS ROAD/ DIVERSION ROAD INCLUDING DRAINAGE STRUCTURE, DAAN KALIKASAN TO UACON, PHASE 3, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.3M | 47% | High risk95 | Flagged0.026 |
| 25NG0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SURIGAO RIVER/BARANGAY MABUHAY, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱124M | 97% | High risk92 | —-0.008 |
| 24JA0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (STA. MARIA SECTION), ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱131.2M | 100% | High risk84 | Flagged0.024 |
| 22JA0013CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS FACILITY), GRANDSTAND, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.5M | 100% | High risk83 | Flagged0.029 |
| 18JI0064PREVENTIVE MAINTENANCE OF PRIMARY ROAD ALONG LANAO-PAGADIAN- ZAMBOANGA CITY RD - K1729 + 541 - K1731 + 325, K1731 + 350 - K1733 + 345, K1743 + 906 - K1746 + 000 | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱96.5M | 100% | High risk82 | —-0.020 |
| 18JI0079REPAIR/REHABILILITAATION OF SLOPE PROTECTION WITH SLIP ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, BASALEM SECTION, BUUG, ZAMBOANGA SIBUGAY, K1724+150+K1724+160, K1724+180-K1724+210, K1724+240-K1724+270,K1725+670-K1725+710 | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱49M | 100% | High risk78 | —-0.030 |
| 23J00167CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE TUMAGA RIVER (TETUAN-TUGBUNGAN SECTION), PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 57% | High risk76 | Flagged0.006 |
| 24J00016CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TETUAN SECTION) PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱146.8M | 0% | High risk76 | Flagged0.015 |
| 24J00015CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TETUAN SECTION) PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱146.8M | 20% | High risk76 | Flagged0.011 |
| 24JH0038CONSTRUCTION OF REVETMENT, BARANGAY BULI-BULI, SUMISIP, BASILAN | Region IX | Isabela City DEO | On-Going | ₱99M | 100% | High risk75 | —-0.004 |
| 23J00168INSTALLATION OF ROAD SAFETY DEVICES, PAGADIAN CITY - ZAMBOANGA CITY RD (LICOMO-PUTIK ROAD) - K1889 + 000 - K1927 + 000, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 51% | High risk75 | —-0.009 |
| 23J00171ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BUNGUIAO-TOLOSA-LAPAKAN BYPASS ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 58% | High risk75 | —-0.011 |
| 23J00172ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BUNGUIAO - QUINIPUT ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 62% | High risk75 | —-0.011 |
| 23J00170SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STUDS LIGHTS ALONG PAGADIAN CITY-ZAMBOANGA CITY RD, (LICOMO-PUTIK ROAD), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 85% | High risk75 | —-0.017 |
| 23J00174ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MUTI-BUENAVISTA BYPASS ROAD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 60% | High risk75 | —-0.010 |
| 23J00161REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY RD | Region IX | Region IX | On-Going | ₱144.6M | 70% | High risk75 | —-0.014 |
| 21J00044CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH ESPLANADE AT LIMPAPA RIVER, ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD (LIMPAPA BRIDGE SECTION) | Region IX | Region IX | On-Going | ₱95.7M | 100% | High risk75 | —-0.006 |
| 23JF0047CONSTRUCTION OF SHORELINE PROTECTION, BARANGAY LINGUISAN, TUNGAWAN, ZAMBOANGA SIBUGAY PACKAGE 1 | Region IX | Zamboanga Sibugay 2nd DEO | On-Going | ₱144.6M | 97% | High risk75 | —-0.008 |
| 23J00137CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TICTAPUL RIVER, BARANGAY TICTAPUL, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱130.2M | 81% | High risk74 | —-0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JA0171CONSTRUCTION OF DRAINAGE STRUCTURE AT TUGBUNGAN (MORNING BREEZE) TO BARANGAY TALON-TALON, PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 0% | High risk70 | Flagged0.061 |
| 24CL0212CONCRETING OF BARANGAY DOLORES ROAD, BARANGAY DOLORES, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱28.6M | 0% | High risk70 | Flagged0.043 |
| 16JH0101CONSTRUCTION OF 3-UNITS 4-STOREY 20-CL SCHOOL BUILDING @ BASILAN NATIONAL HIGH SCHOOL, ISABELA CITY, BASILAN PROVINCE | Region IX | Isabela City DEO | Completed | ₱107.3M | 100% | Medium risk56 | Flagged0.036 |
| 25CL0226CONSTRUCTION OF ACCESS ROAD/ DIVERSION ROAD INCLUDING DRAINAGE STRUCTURE, DAAN KALIKASAN TO UACON, PHASE 2, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.3M | 32% | High risk95 | Flagged0.030 |
| 22JA0013CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS FACILITY), GRANDSTAND, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.5M | 100% | High risk83 | Flagged0.029 |
| 25CL0227CONSTRUCTION OF ACCESS ROAD/ DIVERSION ROAD INCLUDING DRAINAGE STRUCTURE, DAAN KALIKASAN TO UACON, PHASE 3, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.3M | 47% | High risk95 | Flagged0.026 |
| 24JA0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (STA. MARIA SECTION), ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱131.2M | 100% | High risk84 | Flagged0.024 |
| 17AB0242REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER, (BREACHED & ERODED DIKE) LEFT BANK, BRGY. BARONG, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.8M | 100% | Medium risk59 | Flagged0.016 |
| 25J00225CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUC-TURE AT AGUADA RIVER, ISABELA CITY | Region IX | Region IX | On-Going | ₱205.4M | 26% | High risk73 | Flagged0.015 |
| 16JA0109CONSTRUCTION OF 4 STOREY 20 CLASSROOM SCHOOL BUILDING AT AYALA NATIONAL HIGH SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱31.9M | 100% | Medium risk41 | Flagged0.015 |
| 24J00016CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TETUAN SECTION) PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱146.8M | 0% | High risk76 | Flagged0.015 |
| 16JA0111CONSTRUCTION OF 4 STOREY 24 CLASSROOM SCHOOL BUILDING AT AYALA NATIONAL HIGH SCHOOL | Region IX | Zamboanga City 2nd DEO | Completed | ₱35.8M | 100% | Medium risk42 | Flagged0.014 |
| 16JH0099CONSTRUCTION OF 3-UNITS 2-STOREY 4-CL SCHOOL BUILDING AT GERAS ES, ISABELA CITY, BASILAN PROVINCE | Region IX | Isabela City DEO | Completed | ₱25.5M | 100% | Medium risk42 | Flagged0.014 |
| 24OF0047REHABILITATION OF FLOOD CONTROL STRUCTURE AT BARANGAY STA. LUCIA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48.2M | 37% | High risk62 | Flagged0.012 |
| 23GD0057CONCRETING/OPENING OF SITIO PROPER, BRGY. FERNANADEZ FMR, BRGY. FERNANDEZ, MAAYON, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱11.8M | 100% | Medium risk42 | Flagged0.012 |
| 18J00023CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, ZAMBOWOOD - MAMPANG SECTION, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱131M | 73% | High risk74 | Flagged0.011 |
| 24J00015CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TETUAN SECTION) PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱146.8M | 20% | High risk76 | Flagged0.011 |
| 17JI0066ASPHALT OVERLAY ALONG JUNCTION IMELDA-ALICIA ROAD, K1751+000-K1751+958.00, K1753+123.00-K1753+323.50, K1754+000.00- K1754+932.00, K1755+940.00-K1756+100.00, K1756+850.00- K1757+000.00, K1757+000.00-K1757+515.00 | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱95.4M | 100% | High risk66 | Flagged0.009 |
| 22J00077CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT LIMPAPA RIVER, ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD (LIMPAPA BR. SECTION) PHASE II, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.6M | 46% | High risk74 | Flagged0.008 |
| 19J00081CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, CABALUAY - ZAMBOWOOD - MAMPANG SECTION (ROAD WIDENING), ZAMBOANGA CITY, CONSTRUCTION OF MERCEDES BRIDGE #1 | Region IX | Region IX | On-Going | ₱47.1M | 100% | High risk62 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 25OF0015CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PASONG PUTIK, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48.4M | 40% | Medium risk50 | —-0.039 |
| 177 | 25OB0092CONSTRUCTION OF MULTI-PURPOSE BUILDING AT OCTAGON PHASE 1, BARANGAY DELA PAZ, PASIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱24.5M | 43% | Medium risk49 | —-0.048 |
| 178 | 24LD0217CONSTRUCTION OF ROAD FROM BARANGAY SINARAGAN, MATANAO TO BARANGAY KIBUAYA, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱46.3M | 97% | Medium risk49 | Flagged0.007 |
| 179 | 24LD0216CONSTRUCTION OF ROAD FROM BARANGAY LAPU-LABAO TO BARANGAY MALABANG, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱46.3M | 100% | Medium risk49 | Flagged0.005 |
| 180 | 23NF0041CONSTRUCTION OF SEAWALL, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱98.9M | 100% | Medium risk49 | —-0.053 |
| 181 | 17OF0007REHABILITATION/IMPROVEMENT OF P. DELA CRUZ/MAGSAYSAY/KATIPUNAN, BRGY. SAN BARTOLOME, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱26.7M | 100% | Medium risk48 | —-0.061 |
| 182 | 24N00129CONSTRUCTION OF SHORE PROTECTION STRUCTURE ALONG BRGY. TALISAY, SAN BENITO, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱99M | 100% | Medium risk48 | —-0.055 |
| 183 | 24OH0061CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. 775, ZONE 84, SAGRADA FAMILIA COR., ONYX STS., SAN ANDRES, MANILA | National Capital Region | South Manila DEO | Completed | ₱9.7M | 100% | Medium risk48 | —-0.103 |
| 184 | 19OD0269CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 174, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱6.2M | 100% | Medium risk48 | —-0.100 |
| 185 | 17OF0068REHABILITATION/IMPROVEMENTOF FLOOD CONTROL STRUCTURE AND TRIBUTARIES AT BRGY. HOLY SPIRIT (PHASE III), Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱22.9M | 100% | Medium risk48 | —-0.037 |
| 186 | 24N00126CONSTRUCTION OF SHORE PROTECTION STRUCTURE ALONG POBLACION 2, BURGOS, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱99M | 100% | Medium risk48 | —-0.054 |
| 187 | 22GD0075CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MONGPONG, ROXAS CITY, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.083 |
| 188 | 18OA0098CONSTRUCTION OF MULTI-PURPOSE BUILDING, POTRERO NATIONAL HIGH SCHOOL, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱5.8M | 100% | Medium risk48 | —-0.102 |
| 189 | 22HO0080ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF OF SEAWALL PROTECTION WORKS ALONG SANTANDER-BARILI-TOLEDO | Region VII | Cebu 7th DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.077 |
| 190 | 21OF0063REHABILITATION OF MULTI-PURPOSE BUILDING (BRGY. COVERED COURT), BRGY. BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.102 |
| 191 | 23GA0119CONSTRUCTION OF MPB BRGY. POBLACION, LEZO, AKLAN | Region VI | Aklan DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.079 |
| 192 | 23GA0170CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY TAGAS, TANGALAN, AKLAN | Region VI | Aklan DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.084 |
| 193 | 25LD0046CONSTRUCTION OF REVETMENT, DIGOS RIVER, BARANGAY RUPARAN- BARANGAY APLAYA, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱47.5M | 91% | Medium risk47 | —-0.038 |
| 194 | 18HE0007CONSTRUCTION OF VALLADOLID RIVER (GABIONS) VALLADOLID, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱18.5M | 100% | Medium risk47 | —-0.077 |
| 195 | 25DI0141CONSTRUCTION OF STRUCTURE FOR RIVER PROTECTION, NEAR BRGY 1., CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱35.6M | 2% | Medium risk47 | —-0.026 |
| 196 | 22NF0131CONSTRUCTION OF MULTI-PURPOSE BUILDING, DAPA MUNICIPAL HALL (PHASE I), BARANGAY UNION, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱96.2M | 100% | Medium risk47 | —-0.060 |
| 197 | 20FE0045LP: FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/ FACILITIES - CONST/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONST OF DIKE (SEAWALL) ALONG THE SHORELINE, BRGY. TINALMUD, PASACAO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱44.9M | 100% | Medium risk46 | —-0.086 |
| 198 | 20FE0037LP: FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONST/ REPAIR/ REHAB/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONST OF DIKE (SEAWALL) ALONG THE SHORELINE, BRGY. TINALMUD VIEJO, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱44.9M | 100% | Medium risk46 | —-0.086 |
| 199 | 20FE0034LP: FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONST/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONST OF DIKE (SEAWALL) ALONG THE SHORELINE, BRGY. TINALMUD NUEVO, LIBMANAN, CAM. SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱44.9M | 100% | Medium risk46 | —-0.086 |
| 200 | 22GD0068CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY DAYAO, ROXAS CITY, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.072 |