Contractor dossier
7 projects on file, including joint ventures this contractor is part of.
Total projects
7
Total budget
₱275.7M
Average progress
100.0%
Completion rate
57.1%
Below 70%
Average risk score
43.8
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 7 | ₱275.7M | 43.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 4 | ₱203.9M | 33.4 | 0 | 100.0% |
| Roads | 2 | ₱48.3M | 69.7 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱23.5M | 33.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CA0051ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CALAGUIMAN VICINAL ROAD, SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱28.8M | 100% | High risk70 | —-0.042 |
| 25CL0131INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROADS, OLONGAPO - BUGALLON, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.5M | 100% | High risk69 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CA0051ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CALAGUIMAN VICINAL ROAD, SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱28.8M | 100% | High risk70 | —-0.042 |
| 2 | 25CL0131INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROADS, OLONGAPO - BUGALLON, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.5M | 100% | High risk69 | —-0.038 |
| 3 | 22CJ0191BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER (LEFT BANK), PINDANGAN 1ST - PINDANGAN 2ND SECTION (PACKAGE D), CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱48.5M | 100% | Medium risk34 | —-0.086 |
| 4 | 23CJ0138BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO - STA MARIA SECTION, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱57.4M | 100% | Medium risk34 | —-0.086 |
| 5 | 24CG0311BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PAMPANGA PROVINCIAL POLICE OFFICE, BRGY. STO. NINO, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱23.5M | 100% | Medium risk33 | —-0.066 |
| 6 | 22CJ0192BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL (RIGHT DIKE), COLIBANGBANG SECTION (PACKAGE A), COLIBANGBANG, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱48.5M | 100% | Medium risk33 | —-0.087 |
| 7 | 22CJ0190BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER (LEFT BANK), ANOLING 2ND - PAO 3RD SECTION (PACKAGE D), CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱49.5M | 100% | Medium risk33 | —-0.086 |