73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱6B
Average progress
98.7%
Completion rate
91.8%
Average risk score
53.6
Medium risk on average, out of 100
Flagged as unusual
3
4.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 17 | ₱1B | 53.0 | 0 | 100.0% |
| Region VII | 16 | ₱2B | 62.8 | 3 | 96.0% |
| Region II | 11 | ₱410.9M | 40.6 | 0 | 97.5% |
| Region VIII | 9 | ₱481.3M | 52.3 | 0 | 100.0% |
| Region V | 6 | ₱627M | 70.7 | 0 | 100.0% |
| Region III | 6 | ₱938.2M | 53.0 | 0 | 100.0% |
| Region IV-B | 4 | ₱362.9M | 44.2 | 0 | 100.0% |
| Region XII | 3 | ₱145.6M | 36.9 | 0 | 100.0% |
| Negros Island Region | 1 | ₱111M | 60.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 61 | ₱4.5B | 51.0 | 0 | 99.6% |
| Flood Control and Drainage | 10 | ₱1.3B | 61.8 | 2 | 94.6% |
| GAA 2025 OO-1 | 1 | ₱48M | 94.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱188.5M | 92.8 | 1 | 89.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FI0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD (S00016MT) - K0 | Region V | Masbate 2nd DEO | On-Going | ₱48M | 100% | High risk95 | —-0.011 |
| 25H00028ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, PHASE 1, UBAY, BOHOL | Region VII | Region VII | On-Going | ₱188.5M | 90% | High risk93 | Flagged0.009 |
| 17C00017ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PRIMARY ROADS, DAANG MAHARLIKA (LZ), NUEVA ECIJA 2ND LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱289.5M | 100% | High risk73 | —-0.024 |
| 16C00076REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS/COLLAPSE AND LANDSLIDE/PRIMARY ROADS, DAANG MAHARLIKA (LZ), NUEVA ECIJA 2ND LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱275M | 100% | High risk73 | —-0.028 |
| 23H00116OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGT. PROGRAM, CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD MITIGATION STRUCTURES ALONG DUMLOG RIVER (UPSTREAM) BARANGAY CARMEN, | Region VII | Region VII | Completed | ₱193M | 100% | High risk72 | Flagged0.008 |
| 21F00123LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-NATIONAL ROADS AND BRIDGES-NATIONAL ROADS-PILI-TIGAON-ALBAY BDRY RD.-K0505+700.00-K0505+970.00, SAGNAY,CAMARINES SUR 4TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱193M | 100% | High risk69 | —-0.069 |
| 25H00031OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SANTA ANA RIVER, BARANGAY CAMPANGGA, BARILI, CEBU | Region VII | Region VII | On-Going | ₱183.3M | 73% | High risk67 | —-0.009 |
| 24H00007CSSP , SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER, BRGY.TALAVERA, TOLEDO CITY, CEBU | Region VII | Region VII | Completed | ₱212.3M | 100% | High risk66 | —-0.047 |
| 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
| 20FI0012ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD (S00016MT) K0038+382.5 - K0038+600, MILAGROS, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.088 |
| 21FI0029ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - JCT. MILAGROS-BALENO-LAGTA RD (S00016MT), K0038+350 - K0038+478, NET LENGTH = 4,290.00 SQUARE METER (0.128 KM), MILAGROS, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.089 |
| 22FI0001ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT) K0038+250 - K0038+350, MILAGROS, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.089 |
| 24H00031CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT SAN ANTONIO RIVER, BRGY. SAN ANTONIO, DUERO, BOHOL | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk64 | —-0.008 |
| 22HA0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT ULBUJAN-CAMIAS-CANGGUHA-SAMPOANGON ROAD, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱99M | 100% | High risk63 | —-0.066 |
| 21FG0066LOCAL PROGRAM- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD (GENORANGAN SECTION) K0498+296-K0498+522 LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.091 |
| 23HF0118REHABILITATION/RECONSTRUCTION OF TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD K0073+960-K0074+122 | Region VII | Cebu 3rd DEO | Completed | ₱101.3M | 100% | High risk62 | —-0.020 |
| 22E00050REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SIBUYAN CIRCUMFERENTIAL ROAD, KO002+431-KO002+771, ROMBLON | Region IV-B | Region IV-B | Completed | ₱259M | 100% | High risk62 | —-0.051 |
| 23HF0117CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT MATAB-ANG BRIDGE (UPSTREAM) BARANGAY MATAB-ANG, TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱72.4M | 100% | High risk61 | —-0.020 |
| 23HJ0156SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS /FACILITIES - REHABILITATION/RECONSTRUCTION OF LANDSLIDE PRONE ROADS VALLEHERMOSO LA CASTELLANA | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱111M | 100% | High risk61 | —-0.025 |
| 23HF0115REPAIR/REHABILITATION OF ROADSIDE PROTECTION ALONG CEBU-BALAMBAN TRANSCENTRAL ROAD, K0036+100 - K0036+250 RS, K0037+400 - K0037+500 RS AND K0041+700 - K0041+750 | Region VII | Cebu 3rd DEO | Completed | ₱95.7M | 100% | High risk60 | —-0.084 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00028ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, PHASE 1, UBAY, BOHOL | Region VII | Region VII | On-Going | ₱188.5M | 90% | High risk93 | Flagged0.009 |
| 23H00116OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGT. PROGRAM, CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD MITIGATION STRUCTURES ALONG DUMLOG RIVER (UPSTREAM) BARANGAY CARMEN, | Region VII | Region VII | Completed | ₱193M | 100% | High risk72 | Flagged0.008 |
| 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25FI0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD (S00016MT) - K0 | Region V | Masbate 2nd DEO | On-Going | ₱48M | 100% | High risk95 | —-0.011 |
| 2 | 25H00028ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, PHASE 1, UBAY, BOHOL | Region VII | Region VII | On-Going | ₱188.5M | 90% | High risk93 | Flagged0.009 |
| 3 | 17C00017ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, PRIMARY ROADS, DAANG MAHARLIKA (LZ), NUEVA ECIJA 2ND LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱289.5M | 100% | High risk73 | —-0.024 |
| 4 | 16C00076REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS/COLLAPSE AND LANDSLIDE/PRIMARY ROADS, DAANG MAHARLIKA (LZ), NUEVA ECIJA 2ND LEGISLATIVE DISTRICT, PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱275M | 100% | High risk73 | —-0.028 |
| 5 | 23H00116OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGT. PROGRAM, CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD MITIGATION STRUCTURES ALONG DUMLOG RIVER (UPSTREAM) BARANGAY CARMEN, | Region VII | Region VII | Completed | ₱193M | 100% | High risk72 | Flagged0.008 |
| 6 | 21F00123LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-NATIONAL ROADS AND BRIDGES-NATIONAL ROADS-PILI-TIGAON-ALBAY BDRY RD.-K0505+700.00-K0505+970.00, SAGNAY,CAMARINES SUR 4TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱193M | 100% | High risk69 | —-0.069 |
| 7 | 25H00031OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SANTA ANA RIVER, BARANGAY CAMPANGGA, BARILI, CEBU | Region VII | Region VII | On-Going | ₱183.3M | 73% | High risk67 | —-0.009 |
| 8 | 24H00007CSSP , SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER, BRGY.TALAVERA, TOLEDO CITY, CEBU | Region VII | Region VII | Completed | ₱212.3M | 100% | High risk66 | —-0.047 |
| 9 | 24H00028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | Region VII | On-Going | ₱192.9M | 78% | High risk66 | Flagged0.001 |
| 10 | 20FI0012ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD (S00016MT) K0038+382.5 - K0038+600, MILAGROS, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.088 |
| 11 | 21FI0029ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - JCT. MILAGROS-BALENO-LAGTA RD (S00016MT), K0038+350 - K0038+478, NET LENGTH = 4,290.00 SQUARE METER (0.128 KM), MILAGROS, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.089 |
| 12 | 22FI0001ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT) K0038+250 - K0038+350, MILAGROS, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.089 |
| 13 | 24H00031CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT SAN ANTONIO RIVER, BRGY. SAN ANTONIO, DUERO, BOHOL | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk64 | —-0.008 |
| 14 | 22HA0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT ULBUJAN-CAMIAS-CANGGUHA-SAMPOANGON ROAD, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱99M | 100% | High risk63 | —-0.066 |
| 15 | 21FG0066LOCAL PROGRAM- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD (GENORANGAN SECTION) K0498+296-K0498+522 LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.091 |
| 16 | 23HF0118REHABILITATION/RECONSTRUCTION OF TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD K0073+960-K0074+122 | Region VII | Cebu 3rd DEO | Completed | ₱101.3M | 100% | High risk62 | —-0.020 |
| 17 | 22E00050REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SIBUYAN CIRCUMFERENTIAL ROAD, KO002+431-KO002+771, ROMBLON | Region IV-B | Region IV-B | Completed | ₱259M | 100% | High risk62 | —-0.051 |
| 18 | 23HF0117CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT MATAB-ANG BRIDGE (UPSTREAM) BARANGAY MATAB-ANG, TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱72.4M | 100% | High risk61 | —-0.020 |
| 19 | 23HJ0156SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS /FACILITIES - REHABILITATION/RECONSTRUCTION OF LANDSLIDE PRONE ROADS VALLEHERMOSO LA CASTELLANA | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱111M | 100% | High risk61 | —-0.025 |
| 20 | 23HF0115REPAIR/REHABILITATION OF ROADSIDE PROTECTION ALONG CEBU-BALAMBAN TRANSCENTRAL ROAD, K0036+100 - K0036+250 RS, K0037+400 - K0037+500 RS AND K0041+700 - K0041+750 | Region VII | Cebu 3rd DEO | Completed | ₱95.7M | 100% | High risk60 | —-0.084 |
| 21 | 23HF0114REPAIR/REHABILITATION OF ROAD SLOPE PROTECTION ALONG CARCAR-BARILI ROAD, K0052+650 - K0052+940 | Region VII | Cebu 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.083 |
| 22 | 22HF0077CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG BARILI-ALOGUINSAN BYPASS RD., BRGY. HILAGASAN, BARILI, CEBU, STA. 0+000.00 - STA. 0+219.00 | Region VII | Cebu 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
| 23 | 22H00017ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0029+550-K0029 | Region VII | Region VII | Completed | ₱96.5M | 100% | Medium risk60 | —-0.085 |
| 24 | 19PC0003ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES (TERTIARY ROADS) ALONG APAYAO-ILOCOS NORTE ROAD K0722+875-K0723+010 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱91.2M | 100% | Medium risk59 | —-0.065 |
| 25 | 20PC0048ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPES COLLAPSE, AND LANDSLIDES-TERTIARY ROADS APAYAO-ILOCOS NORTE ROAD K0732+529-K0732+600, K0732+920-K0 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.062 |