Contractor dossier
22 projects on file, including joint ventures this contractor is part of.
Total projects
22
Total budget
₱380.9M
Average progress
75.6%
Completion rate
18.2%
Below 70%
Average risk score
72.1
High risk on average, out of 100
Flagged as unusual
6
27.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 22 | ₱380.9M | 72.1 | 6 | 75.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 11 | ₱234.9M | 73.3 | 1 | 90.3% |
| Roads | 9 | ₱120M | 72.3 | 3 | 68.9% |
| OTHER | 1 | ₱14.3M | 78.4 | 1 | 19.4% |
| Buildings and Facilities | 1 | ₱11.7M | 49.7 | 1 | 29.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0308CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY 19 STO. TOMAS, SARRAT, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.008 |
| 25AA0547CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF CANAL LINING, BARANGAY BADUANG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk79 | —-0.014 |
| 25AA0546CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE CANAL, BARANGAY SAGUIGUI PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 63% | High risk79 | Flagged0.005 |
| 25AA0174CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - MAOINI-BADUANG-SAUD-CAPARISPISAN-BALAOI ROAD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱14.3M | 19% | High risk78 | Flagged0.028 |
| 25AA0545CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY BURAYOC, PAGUDPUD, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.017 |
| 24AA0353SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THENATIONAL ROAD/S LEADING TO MAJOR/STRATEGICPUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OFROAD, BRGY. SAN ROQUE, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 98% | High risk78 | —-0.043 |
| 25AA0110FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DAGUPAN DIVERSION DAM, BARANGAY DAGUPAN/DANAO, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 57% | High risk76 | —-0.020 |
| 25AA0198SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MAOINI-BADUANG-SAUD-CAPARISPISAN-BALAOI ROAD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.9M | 83% | High risk75 | —-0.017 |
| 25AA0089FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY CAPARISPISAN, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk75 | —-0.037 |
| 24AA0443CONCRETING OF BRGY. SAGUIGUI FMR, BRGY. SAGUIGUI, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 55% | High risk73 | Flagged0.028 |
| 25AA0053FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PADSAN RIVER, BARANGAY SAN JOAQUIN, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.5M | 88% | High risk72 | —-0.030 |
| 25AA0168FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PANCIAN BRIDGE, BARANGAY PANCIAN, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 86% | High risk70 | —-0.028 |
| 24AA0179SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY LIGAYA, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 100% | High risk70 | —-0.043 |
| 24AA0086CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATIONSTRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OFFLOOD CONTROL STRUCTURE ALONG PADSAN RIVER, BARANGAY17 SAN FELIPE, SARRAT, ILOCOS NORTE (PHASE 2) | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk70 | —-0.065 |
| 24AA0133CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF FLOOD CONTROL ALONG BOLO RIVER, SITIO CARAMMUANGEN, BARANGAY TARRAG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 100% | High risk70 | —-0.028 |
| 24AA0180SIPAG - ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF SAGUIGUI CIRCUMFERENCIAL ROAD,PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 85% | High risk69 | —-0.038 |
| 25AA0133FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABACANAN RIVER, BARANGAY BADUANG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱28.2M | 100% | High risk69 | —-0.065 |
| 24AA0191SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.064 |
| 25AA0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF RD, BRGY 7 SAN MANUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk69 | Flagged0.055 |
| 24AA0142CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - MAOINI - BADUANG - SAUD - CAPARISPISAN - BALAOI ROAD, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.8M | 100% | High risk69 | —-0.044 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF RD, BRGY 7 SAN MANUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk69 | Flagged0.055 |
| 24A00597CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - PAGUDPUD SUPER HEALTH CENTER, ILOCOS NORTE | Region I | Region I | On-Going | ₱11.7M | 30% | Medium risk50 | Flagged0.039 |
| 25AA0174CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - MAOINI-BADUANG-SAUD-CAPARISPISAN-BALAOI ROAD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱14.3M | 19% | High risk78 | Flagged0.028 |
| 24AA0443CONCRETING OF BRGY. SAGUIGUI FMR, BRGY. SAGUIGUI, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 55% | High risk73 | Flagged0.028 |
| 25AA0308CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY 19 STO. TOMAS, SARRAT, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.008 |
| 25AA0546CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE CANAL, BARANGAY SAGUIGUI PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 63% | High risk79 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25AA0308CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY 19 STO. TOMAS, SARRAT, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.008 |
| 2 | 25AA0547CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF CANAL LINING, BARANGAY BADUANG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk79 | —-0.014 |
| 3 | 25AA0546CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE CANAL, BARANGAY SAGUIGUI PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 63% | High risk79 | Flagged0.005 |
| 4 | 25AA0174CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - MAOINI-BADUANG-SAUD-CAPARISPISAN-BALAOI ROAD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱14.3M | 19% | High risk78 | Flagged0.028 |
| 5 | 25AA0545CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY BURAYOC, PAGUDPUD, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.017 |
| 6 | 24AA0353SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THENATIONAL ROAD/S LEADING TO MAJOR/STRATEGICPUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OFROAD, BRGY. SAN ROQUE, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 98% | High risk78 | —-0.043 |
| 7 | 25AA0110FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DAGUPAN DIVERSION DAM, BARANGAY DAGUPAN/DANAO, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 57% | High risk76 | —-0.020 |
| 8 | 25AA0198SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MAOINI-BADUANG-SAUD-CAPARISPISAN-BALAOI ROAD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.9M | 83% | High risk75 | —-0.017 |
| 9 | 25AA0089FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY CAPARISPISAN, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk75 | —-0.037 |
| 10 | 24AA0443CONCRETING OF BRGY. SAGUIGUI FMR, BRGY. SAGUIGUI, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 55% | High risk73 | Flagged0.028 |
| 11 | 25AA0053FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PADSAN RIVER, BARANGAY SAN JOAQUIN, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.5M | 88% | High risk72 | —-0.030 |
| 12 | 25AA0168FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PANCIAN BRIDGE, BARANGAY PANCIAN, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 86% | High risk70 | —-0.028 |
| 13 | 24AA0179SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY LIGAYA, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 100% | High risk70 | —-0.043 |
| 14 | 24AA0086CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATIONSTRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OFFLOOD CONTROL STRUCTURE ALONG PADSAN RIVER, BARANGAY17 SAN FELIPE, SARRAT, ILOCOS NORTE (PHASE 2) | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk70 | —-0.065 |
| 15 | 24AA0133CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF FLOOD CONTROL ALONG BOLO RIVER, SITIO CARAMMUANGEN, BARANGAY TARRAG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 100% | High risk70 | —-0.028 |
| 16 | 24AA0180SIPAG - ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF SAGUIGUI CIRCUMFERENCIAL ROAD,PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 85% | High risk69 | —-0.038 |
| 17 | 25AA0133FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABACANAN RIVER, BARANGAY BADUANG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱28.2M | 100% | High risk69 | —-0.065 |
| 18 | 24AA0191SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.064 |
| 19 | 25AA0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF RD, BRGY 7 SAN MANUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk69 | Flagged0.055 |
| 20 | 24AA0142CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - MAOINI - BADUANG - SAUD - CAPARISPISAN - BALAOI ROAD, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.8M | 100% | High risk69 | —-0.044 |
| 21 | 23AA0036CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - ACCESS ROAD LEADING TO THE TOURIST SPOTS AND CENTERS, BRGY. SAN JOAQUIN, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱39.2M | 100% | High risk67 | —-0.079 |
| 22 | 24A00597CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - PAGUDPUD SUPER HEALTH CENTER, ILOCOS NORTE | Region I | Region I | On-Going | ₱11.7M | 30% | Medium risk50 | Flagged0.039 |