Contractor dossier
107 projects on file, including joint ventures this contractor is part of.
Total projects
107
Total budget
₱5.6B
Average progress
92.4%
Completion rate
78.5%
Average risk score
54.1
Medium risk on average, out of 100
Flagged as unusual
6
5.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 106 | ₱5.5B | 54.2 | 6 | 92.4% |
| Region IV-B | 1 | ₱49M | 42.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 56 | ₱2.9B | 52.6 | 1 | 95.0% |
| Bridges | 15 | ₱644.4M | 53.0 | 0 | 98.7% |
| Flood Control and Drainage | 14 | ₱635.6M | 51.6 | 2 | 87.3% |
| Buildings and Facilities | 11 | ₱557M | 54.8 | 2 | 73.2% |
| OTHER | 7 | ₱425.1M | 72.6 | 1 | 100.0% |
| Bridges, Roads | 3 | ₱407.2M | 57.7 | 0 | 87.9% |
| Water Provision and Storage | 1 | ₱9.5M | 47.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17DD0194DRAINAGE IMPROVEMENT, ROSARIO-SAN JUAN ROAD (S01926LZ), K0126 + 774.00 - K0128 + 649.00; K0128 + 649.00 - K0130 + 638.00 | Region IV-A | Batangas 4th DEO | Completed | ₱98M | 100% | High risk83 | Flagged0.022 |
| 17D00020MFO-1 NAT'L. ROAD NETWORK SERVICES NETWORK DEV'T. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE SECONDARY ROADS BATANGAS-QUEZON ROAD, BATANGAS PROVINCE | Region IV-A | Region IV-A | Completed | ₱119.7M | 100% | High risk75 | —-0.021 |
| 17D00002ASSET PRESERVATION OF NATIONAL ROADS PREVENTIVE MAINT. BASED ON PAVEMENT MNGMT. SYSTEM/HIGHWAY DEV;T. & MANAGEMENT-4 (HDM-4) SECONDARY ROADS TERNATE-NASUGBU ROAD (S01859LZ) K0075+(-338) - K0082+000, K0083+000-K0084+500, NET LENGTH=8838.00 L.M., BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk73 | —-0.046 |
| 20D00037FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM ROAD WIDENING / PRIMARY ROADSDAANG MAHARLIKA (LZ) K0070 + (-611)-K0072 + 057, LAGUNA | Region IV-A | Region IV-A | Completed | ₱155M | 100% | High risk73 | —-0.049 |
| 17DP0007NETWORK DEVELOPMENT - IMPROVEMENT - WIDENING OF NATIONAL ROADS AT SAN PABLO - CALAUAN ROAD | Region IV-A | Laguna 3rd DEO | Completed | ₱68.5M | 100% | High risk72 | —-0.024 |
| 22DF0257CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)CONSTRUCTION OF ARESCOM ARTERIAL ROAD - CAMP RIEGO DE D | Region IV-A | Cavite 1st DEO | Completed | ₱78.2M | 100% | High risk71 | —-0.068 |
| 17DD0024CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, TO MORE THAN 2 LANES, PUTING BUHANGIN BRIDGE (B03106LZ) ALONG SAN JUAN - LAIYA ROAD, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱19.6M | 100% | High risk71 | —-0.041 |
| 19DC0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱83M | 100% | High risk70 | —-0.036 |
| 17D00010ASSET PRESERVATION OF NAT'L. ROADS PREVENTIVE MAINTENANCE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. MGMT.-4 (HDM-4) TERTIARY ROADS BAUAN-MABINI ROAD (S01947LZ), BATANGAS | Region IV-A | Region IV-A | Completed | ₱105.2M | 100% | High risk70 | —-0.061 |
| 17D00079MFO-1 NAT'L. ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL. ROADS, PREVENTIVE MAINT. BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEV'T. & MGMT. -4 (HDM-4), SECONDARY PREVENTIVE MAINTENANCE OF ROAD; ASPHALT OVERLAY, BATANGAS-QUEZON ROAD, BATANGAS | Region IV-A | Region IV-A | Completed | ₱67.2M | 100% | High risk70 | —-0.069 |
| 17DD0011ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM / HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), SECONDARY ROADS, LIPA-ROSARIO ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱20.7M | 100% | High risk69 | —-0.043 |
| 17DD0163OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, BANAY-BANAY - MOJON-CUENCA ROAD, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱15.7M | 100% | High risk69 | —-0.042 |
| 16DJ0061IMPROVEMENT/WIDENING OF NATIONAL ROADS, TERTIARY ROADS, LUTUCAN-GUISGUIS PORT ROAD, S02003LZ, K0120+ 315-K0121+959 SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱48.5M | 100% | High risk68 | —-0.073 |
| 24D00063CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ALAMINOS - SAN PABLO CITY BYPASS ROAD, PACKAGE J, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱301.1M | 64% | High risk68 | —-0.001 |
| 25DP0057NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0074 + (-722) - K0074 + (-101) | Region IV-A | Laguna 3rd DEO | On-Going | ₱37.7M | 0% | High risk67 | —-0.020 |
| 18D00063FY 2018 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, BATANGAS | Region IV-A | Region IV-A | Completed | ₱234M | 100% | High risk65 | —-0.046 |
| 25DC0100CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BANK/SLOPE PROTECTION ALONG SAN JUAN RIVER AND SAN JUAN BRIDGE ALONG LIP | Region IV-A | Batangas 3rd DEO | On-Going | ₱96.5M | 36% | High risk64 | —-0.029 |
| 24DC0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BANK/SLOPE PROTECTION ALONG SAN JUAN RIVER AND SAN JUAN BRIDGE, LIPA-A | Region IV-A | Batangas 3rd DEO | On-Going | ₱96.4M | 92% | High risk64 | —-0.035 |
| 24DP0044BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN MIGUEL BR. (B03384LZ) ALONG LIPA CITY - ALAMINOS RD | Region IV-A | Laguna 3rd DEO | On-Going | ₱93.6M | 80% | High risk64 | —-0.015 |
| 23DP0078BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN MIGUEL BR. (B03384LZ) ALONG LIPA CITY - ALAMINOS RD | Region IV-A | Laguna 3rd DEO | Completed | ₱94.6M | 100% | High risk64 | —-0.054 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17DD0194DRAINAGE IMPROVEMENT, ROSARIO-SAN JUAN ROAD (S01926LZ), K0126 + 774.00 - K0128 + 649.00; K0128 + 649.00 - K0130 + 638.00 | Region IV-A | Batangas 4th DEO | Completed | ₱98M | 100% | High risk83 | Flagged0.022 |
| 24DE0230ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱47M | 65% | Medium risk57 | Flagged0.017 |
| 24DP0097CONCRETING OF TALA MALASEÑA FMR, BRGY. TALA, RIZAL, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱64.7M | 35% | Medium risk58 | Flagged0.013 |
| 24DD0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (AUDITORIUM BUILDING), BARANGAY TAMBO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱76.8M | 50% | Medium risk56 | Flagged0.010 |
| 24DE0229ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱47M | 80% | Medium risk57 | Flagged0.009 |
| 24DD0290CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LUMBANG, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱78.7M | 68% | Medium risk56 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20DC0036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALVAR-STO. TOMAS RD, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱94.2M | 100% | High risk61 | —-0.093 |
| 27 | 24DC0098ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALVAR-STO. TOMAS ROAD, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱96.5M | 67% | High risk60 | —-0.050 |
| 28 | 19DC0023ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱92.6M | 100% | Medium risk60 | —-0.098 |
| 29 | 24DP0097CONCRETING OF TALA MALASEÑA FMR, BRGY. TALA, RIZAL, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱64.7M | 35% | Medium risk58 | Flagged0.013 |
| 30 | 24DE0230ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱47M | 65% | Medium risk57 | Flagged0.017 |
| 31 | 24DE0229ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱47M | 80% | Medium risk57 | Flagged0.009 |
| 32 | 24DD0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (AUDITORIUM BUILDING), BARANGAY TAMBO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱76.8M | 50% | Medium risk56 | Flagged0.010 |
| 33 | 24DD0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT TAMBO ELEMENTARY SCHOOL, BARANGAY TAMBO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱52.8M | 100% | Medium risk56 | —-0.060 |
| 34 | 24DD0290CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LUMBANG, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱78.7M | 68% | Medium risk56 | Flagged0.007 |
| 35 | 24DP0076CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION 2, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱49.5M | 91% | Medium risk56 | —-0.053 |
| 36 | 18DC0090ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF | Region IV-A | Batangas 3rd DEO | Completed | ₱77M | 100% | Medium risk55 | —-0.048 |
| 37 | 18DD0061ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, LAIYA BR. (B03115LZ) ALONG SAN JUAN - LAIYA ROAD, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱62.7M | 100% | Medium risk55 | —-0.059 |
| 38 | 23DC0039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TANAUAN CITY - STO. TOMAS DIVERSION ROAD VIA SAMPALOCAN ROAD, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱74.9M | 81% | Medium risk54 | —-0.050 |
| 39 | 23DC0050ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALVAR-STO. TOMAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱72.4M | 100% | Medium risk54 | —-0.092 |
| 40 | 19D00008ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE, PRIMARY ROADS MANILA-BATANGAS ROAD, K0076+665-K0078+320, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | Completed | ₱86.8M | 100% | Medium risk54 | —-0.098 |
| 41 | 20DC0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, MANILA SOUTH VIA STO. TOMAS POB. | Region IV-A | Batangas 3rd DEO | Completed | ₱72.9M | 100% | Medium risk54 | —-0.101 |
| 42 | 18DD0277ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS, SECONDARY ROADS, BANAY-BANAY-MOJON-CUENCA RD- K0086+(-500) - K0087+294 | Region IV-A | Batangas 4th DEO | Completed | ₱77.6M | 100% | Medium risk54 | —-0.101 |
| 43 | 18DC0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, | Region IV-A | Batangas 3rd DEO | Completed | ₱61.9M | 100% | Medium risk54 | —-0.104 |
| 44 | 17DP0020CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO (2) LANES - MALIKBE BRIDGE (B03136LZ) ALONG CALAUAN - NAGCARLAN BOUNDARY ROAD | Region IV-A | Laguna 3rd DEO | Completed | ₱12.1M | 100% | Medium risk54 | —-0.041 |
| 45 | 20DP0033NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - LIPA CITY - ALAMINOS RD - K0076 + (-735) - K0077 + 000, K0078 + 000 - K0079 + 000 | Region IV-A | Laguna 3rd DEO | Completed | ₱87.1M | 100% | Medium risk54 | —-0.099 |
| 46 | 18DP0023ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE OF TERTIARY ROADS ALONG LIPA CITY ALAMINOS RD. K0079 + 600 K0079 + 800 | Region IV-A | Laguna 3rd DEO | Completed | ₱62.7M | 100% | Medium risk54 | —-0.102 |
| 47 | 24DP0004ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MSR PASSING POBLACION ROAD K0081 + (-717) - K0081 + 490 | Region IV-A | Laguna 3rd DEO | Completed | ₱62.7M | 100% | Medium risk54 | —-0.104 |
| 48 | 17DP0021CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO (2) LANES - GATING-GATING BRIDGE (B02879LZ) ALONG CALAMBA -STA. CRUZ - FAMY JCT. ROAD (S01706LZ) | Region IV-A | Laguna 3rd DEO | Completed | ₱9.3M | 100% | Medium risk54 | —-0.041 |
| 49 | 20DD0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING- SECONDARY ROADS, ROSARIO-SN JUAN RD - K0125+152 - K0125+439, K0127+616 - K0130+524 | Region IV-A | Batangas 4th DEO | Completed | ₱65.1M | 100% | Medium risk54 | —-0.103 |
| 50 | 22DC0089ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALVAR-STO. TOMAS DIV. ROAD, PACKAGE 1, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱53.1M | 100% | Medium risk53 | —-0.077 |