Contractor dossier
107 projects on file, including joint ventures this contractor is part of.
Total projects
107
Total budget
₱5.6B
Average progress
92.4%
Completion rate
78.5%
Average risk score
54.1
Medium risk on average, out of 100
Flagged as unusual
6
5.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 106 | ₱5.5B | 54.2 | 6 | 92.4% |
| Region IV-B | 1 | ₱49M | 42.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 56 | ₱2.9B | 52.6 | 1 | 95.0% |
| Bridges | 15 | ₱644.4M | 53.0 | 0 | 98.7% |
| Flood Control and Drainage | 14 | ₱635.6M | 51.6 | 2 | 87.3% |
| Buildings and Facilities | 11 | ₱557M | 54.8 | 2 | 73.2% |
| OTHER | 7 | ₱425.1M | 72.6 | 1 | 100.0% |
| Bridges, Roads | 3 | ₱407.2M | 57.7 | 0 | 87.9% |
| Water Provision and Storage | 1 | ₱9.5M | 47.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17DD0194DRAINAGE IMPROVEMENT, ROSARIO-SAN JUAN ROAD (S01926LZ), K0126 + 774.00 - K0128 + 649.00; K0128 + 649.00 - K0130 + 638.00 | Region IV-A | Batangas 4th DEO | Completed | ₱98M | 100% | High risk83 | Flagged0.022 |
| 17D00020MFO-1 NAT'L. ROAD NETWORK SERVICES NETWORK DEV'T. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE SECONDARY ROADS BATANGAS-QUEZON ROAD, BATANGAS PROVINCE | Region IV-A | Region IV-A | Completed | ₱119.7M | 100% | High risk75 | —-0.021 |
| 17D00002ASSET PRESERVATION OF NATIONAL ROADS PREVENTIVE MAINT. BASED ON PAVEMENT MNGMT. SYSTEM/HIGHWAY DEV;T. & MANAGEMENT-4 (HDM-4) SECONDARY ROADS TERNATE-NASUGBU ROAD (S01859LZ) K0075+(-338) - K0082+000, K0083+000-K0084+500, NET LENGTH=8838.00 L.M., BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk73 | —-0.046 |
| 20D00037FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM ROAD WIDENING / PRIMARY ROADSDAANG MAHARLIKA (LZ) K0070 + (-611)-K0072 + 057, LAGUNA | Region IV-A | Region IV-A | Completed | ₱155M | 100% | High risk73 | —-0.049 |
| 17DP0007NETWORK DEVELOPMENT - IMPROVEMENT - WIDENING OF NATIONAL ROADS AT SAN PABLO - CALAUAN ROAD | Region IV-A | Laguna 3rd DEO | Completed | ₱68.5M | 100% | High risk72 | —-0.024 |
| 22DF0257CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)CONSTRUCTION OF ARESCOM ARTERIAL ROAD - CAMP RIEGO DE D | Region IV-A | Cavite 1st DEO | Completed | ₱78.2M | 100% | High risk71 | —-0.068 |
| 17DD0024CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, TO MORE THAN 2 LANES, PUTING BUHANGIN BRIDGE (B03106LZ) ALONG SAN JUAN - LAIYA ROAD, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱19.6M | 100% | High risk71 | —-0.041 |
| 19DC0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱83M | 100% | High risk70 | —-0.036 |
| 17D00010ASSET PRESERVATION OF NAT'L. ROADS PREVENTIVE MAINTENANCE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. MGMT.-4 (HDM-4) TERTIARY ROADS BAUAN-MABINI ROAD (S01947LZ), BATANGAS | Region IV-A | Region IV-A | Completed | ₱105.2M | 100% | High risk70 | —-0.061 |
| 17D00079MFO-1 NAT'L. ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL. ROADS, PREVENTIVE MAINT. BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEV'T. & MGMT. -4 (HDM-4), SECONDARY PREVENTIVE MAINTENANCE OF ROAD; ASPHALT OVERLAY, BATANGAS-QUEZON ROAD, BATANGAS | Region IV-A | Region IV-A | Completed | ₱67.2M | 100% | High risk70 | —-0.069 |
| 17DD0011ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM / HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), SECONDARY ROADS, LIPA-ROSARIO ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱20.7M | 100% | High risk69 | —-0.043 |
| 17DD0163OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, BANAY-BANAY - MOJON-CUENCA ROAD, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱15.7M | 100% | High risk69 | —-0.042 |
| 16DJ0061IMPROVEMENT/WIDENING OF NATIONAL ROADS, TERTIARY ROADS, LUTUCAN-GUISGUIS PORT ROAD, S02003LZ, K0120+ 315-K0121+959 SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱48.5M | 100% | High risk68 | —-0.073 |
| 24D00063CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ALAMINOS - SAN PABLO CITY BYPASS ROAD, PACKAGE J, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱301.1M | 64% | High risk68 | —-0.001 |
| 25DP0057NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0074 + (-722) - K0074 + (-101) | Region IV-A | Laguna 3rd DEO | On-Going | ₱37.7M | 0% | High risk67 | —-0.020 |
| 18D00063FY 2018 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, BATANGAS | Region IV-A | Region IV-A | Completed | ₱234M | 100% | High risk65 | —-0.046 |
| 25DC0100CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BANK/SLOPE PROTECTION ALONG SAN JUAN RIVER AND SAN JUAN BRIDGE ALONG LIP | Region IV-A | Batangas 3rd DEO | On-Going | ₱96.5M | 36% | High risk64 | —-0.029 |
| 24DC0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BANK/SLOPE PROTECTION ALONG SAN JUAN RIVER AND SAN JUAN BRIDGE, LIPA-A | Region IV-A | Batangas 3rd DEO | On-Going | ₱96.4M | 92% | High risk64 | —-0.035 |
| 24DP0044BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN MIGUEL BR. (B03384LZ) ALONG LIPA CITY - ALAMINOS RD | Region IV-A | Laguna 3rd DEO | On-Going | ₱93.6M | 80% | High risk64 | —-0.015 |
| 23DP0078BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN MIGUEL BR. (B03384LZ) ALONG LIPA CITY - ALAMINOS RD | Region IV-A | Laguna 3rd DEO | Completed | ₱94.6M | 100% | High risk64 | —-0.054 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17DD0194DRAINAGE IMPROVEMENT, ROSARIO-SAN JUAN ROAD (S01926LZ), K0126 + 774.00 - K0128 + 649.00; K0128 + 649.00 - K0130 + 638.00 | Region IV-A | Batangas 4th DEO | Completed | ₱98M | 100% | High risk83 | Flagged0.022 |
| 24DE0230ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱47M | 65% | Medium risk57 | Flagged0.017 |
| 24DP0097CONCRETING OF TALA MALASEÑA FMR, BRGY. TALA, RIZAL, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱64.7M | 35% | Medium risk58 | Flagged0.013 |
| 24DD0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (AUDITORIUM BUILDING), BARANGAY TAMBO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱76.8M | 50% | Medium risk56 | Flagged0.010 |
| 24DE0229ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱47M | 80% | Medium risk57 | Flagged0.009 |
| 24DD0290CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LUMBANG, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱78.7M | 68% | Medium risk56 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22DC0090ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALVAR-STO. TOMAS DIV. ROAD, PACKAGE 2, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱53.1M | 100% | Medium risk53 | —-0.077 |
| 52 | 25DC0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF THE NEW CITY HALL OF STO. TOMAS, BATANGAS (PHASE 1) | Region IV-A | Batangas 3rd DEO | On-Going | ₱29M | 71% | Medium risk53 | —-0.057 |
| 53 | 25DD0232CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SAN SALVADOR, LIPA CITY BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱28.8M | 20% | Medium risk52 | —-0.041 |
| 54 | 19DC0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱53.1M | 100% | Medium risk52 | —-0.104 |
| 55 | 24DC0180REHABILITATION OF SAMBAT FLYOVER ALONG TANAUAN-TALISAY-TAGAYTAY ROAD | Region IV-A | Batangas 3rd DEO | On-Going | ₱48.2M | 100% | Medium risk52 | —-0.036 |
| 56 | 19D00020FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TAYABAS BY-PASS ROAD, QUEZON | Region IV-A | Region IV-A | Completed | ₱53.1M | 100% | Medium risk52 | —-0.105 |
| 57 | 21DC0100ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - CONSTRUCTION OF BY - PASS AND DIVERSION ROADS, MALVAR - STO. TOMAS DIV. ROAD, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱50.7M | 100% | Medium risk51 | —-0.097 |
| 58 | 25DC0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES, CONSTRUCTION OF HOSPITAL AT BRGY. SAN MIGUEL, STO. TOMAS, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱19.3M | 5% | Medium risk51 | —-0.034 |
| 59 | 21DP0029ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - LIPA CITY - ALAMINOS RD - K0081 + 400 - K0082 + 282 | Region IV-A | Laguna 3rd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.100 |
| 60 | 20DP0029ASSET PRESERVATION - PREVENTIVE MAINTENANCE -TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0083 + 600 - K0086 + 160 | Region IV-A | Laguna 3rd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.103 |
| 61 | 25DD0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PAGOLINGIN BATA, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱14.4M | 100% | Medium risk49 | —-0.073 |
| 62 | 24DD0131CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, BRGY. SAN BENITO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱9.6M | 100% | Medium risk49 | —-0.107 |
| 63 | 23DD0290CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CONCRETE BRIDGE, PUROK 3, BARANGAY ANTIPOLO DEL NOR | Region IV-A | Batangas 4th DEO | Completed | ₱28.8M | 100% | Medium risk48 | —-0.063 |
| 64 | 19DD0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-WIDENING OF PERMANENT BRIDGES, DOÑA ALICIA BR. (B04539LZ) ALONG BATANGAS-LOBO RD. | Region IV-A | Batangas 4th DEO | Completed | ₱43.7M | 100% | Medium risk48 | —-0.066 |
| 65 | 24DD0309CONCRETING OF BARANGAY LIBATO FMR, BARANGAY LIBATO, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱24.1M | 98% | Medium risk48 | —-0.015 |
| 66 | 22DC0091ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALVAR-STO. TOMAS DIV ROAD | Region IV-A | Batangas 3rd DEO | Completed | ₱44.3M | 100% | Medium risk48 | —-0.092 |
| 67 | 23DP0100CSSP - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY KANLURANG BUKAL, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.074 |
| 68 | 20DD0363LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES, CONSTRUCTION/IMPROVEMENT OF BRIDGE AT BRGY. PANGAO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱14.4M | 100% | Medium risk47 | —-0.070 |
| 69 | 24DP0066CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BARANGAY BANGYAS, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.068 |
| 70 | 22DD0216CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD, BARANGAY MUNTINGPULO TO BARANGAY STO. NINO | Region IV-A | Batangas 4th DEO | Completed | ₱42.3M | 100% | Medium risk47 | —-0.107 |
| 71 | 21DC0157ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA (LZ) - K0059+054 - K0059+392, K0059+417 - K0059+485, K0059+832 - K0060+078 | Region IV-A | Batangas 3rd DEO | Completed | ₱43.1M | 100% | Medium risk47 | —-0.107 |
| 72 | 21DC0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT- ROAD WIDENING - TERTIARY ROADS, LIPA CITY-ALAMINOS RD | Region IV-A | Batangas 3rd DEO | Completed | ₱30M | 100% | Medium risk47 | —-0.109 |
| 73 | 20DD0159ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, MATALA BR. (B00068LZ) ALONG BATANGAS-QUEZON RD | Region IV-A | Batangas 4th DEO | Completed | ₱12.7M | 100% | Medium risk47 | —-0.069 |
| 74 | 19DD0025ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-WIDENING OF PERMANENT BRIDGES, YABOC BR. (B04538LZ) ALONG SN JUAN-LAIYA RD. | Region IV-A | Batangas 4th DEO | Completed | ₱17.1M | 100% | Medium risk47 | —-0.069 |
| 75 | 22D00067FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSALAMINOS - SAN PABLO CITY BY-PASS ROAD (PACKAGE G), LAGUNA | Region IV-A | Region IV-A | Completed | ₱38.6M | 100% | Medium risk47 | —-0.096 |