Opening the dossier…
Opening the dossier…
Contractor dossier
58 projects on file, including joint ventures this contractor is part of.
Total projects
58
Total budget
₱6.9B
Average progress
97.9%
Completion rate
82.8%
Average risk score
57.9
Medium risk on average, out of 100
Flagged as unusual
6
10.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 55 | ₱6.6B | 58.5 | 6 | 97.8% |
| Region XIII | 3 | ₱311.5M | 46.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 32 | ₱3.5B | 55.0 | 0 | 99.9% |
| Bridges | 14 | ₱1.5B | 57.9 | 1 | 96.5% |
| Buildings and Facilities | 5 | ₱840.1M | 54.7 | 1 | 100.0% |
| OTHER | 3 | ₱554.1M | 81.7 | 3 | 87.2% |
| Flood Control and Drainage | 3 | ₱382.2M | 57.8 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱56.9M | 95.0 | 1 | 67.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00058CONSTRUCTION OF BOBONG BRIDGE ALONG JCT. DON CARLOS-KADINGILAN ROAD TO BARANGAY CALAO- CALAO-BARANGAY BERSHIBA-BARANGAY BOBONG-BARANGAY KAUYONAN-BARANGAY STO. ROSARIO-BARANGAY OSMEÑA ROAD, DANGCAGAN, BUKIDNON, PHASE II | Region X | Region X | On-Going | ₱56.9M | 67% | High risk95 | Flagged0.011 |
| 23KB0157CONSTRUCTION OF ROAD, JCT. SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY)-BARANGAY MAICAN, DAMULOG-SITIO RAPAGAS-SITIO STA. CRUZ, BARANGAY BALAORO ROAD, KADINGILAN (PACKAGE III) | Region X | Bukidnon 2nd DEO | On-Going | ₱94.8M | 65% | High risk87 | Flagged0.067 |
| 24K00403CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. DON CARLOS-KADINGILAN RD (POBLACION, KITAOTAO-CALAO-CALAO, DON CARLOS), BUKIDNON, PACKAGE 2 | Region X | Region X | On-Going | ₱170.6M | 97% | High risk79 | Flagged0.016 |
| 23K00240CLUSTER RO-1 -CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱288.7M | 100% | High risk78 | Flagged0.010 |
| 22K00313CONSTRUCTION OF BRIDGE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY)-BRGY. MAICAN, DAMULOG - SITIO RAPAGAS - SITIO STA. CRUZ, BRGY. BALAORO ROAD, KADINGILAN (PACKAGE III) | Region X | Region X | Completed | ₱140.7M | 100% | High risk64 | —-0.029 |
| 22K00362CONST. OF PULANGI BRIDGE (KIBATANG) ALONG DON CARLOS-KIBURIAO, QUEZON, BUKIDNON PHASE 2 | Region X | Region X | Completed | ₱140.7M | 100% | High risk64 | —-0.036 |
| 21K00084CONST. OF PULANGI BRIDGE ALONG DON CARLOS-KIBURIAO, QUEZON, BUKIDNON | Region X | Region X | Completed | ₱169.6M | 100% | High risk64 | —-0.024 |
| 20K00369CLUSTER BUK-01 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (MALUSIKOB BR.) MALAYBALAY CITY, BUKIDNON = PHP65,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL STRUCT... | Region X | Region X | Completed | ₱185.7M | 100% | High risk63 | —-0.044 |
| 22K00340CLUSTER RO-O3 CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱243.9M | 100% | High risk63 | —-0.047 |
| 23K00279CLUSTER RO-6 -CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON 1. CONSTRUCTION OF JCT. SAYRE HIGHWAY TO BRGY. MIARAY-BRGY. DOLOROSA, DANGCAGAN-BRGY. BALOCBOCAN ROAD, KITAOTAO, BUKIDNON (PACKAGE I) 2. CONSTRUCTION OF JCT. DON CARLOS-KADINGILAN ROAD TO BR | Region X | Region X | Completed | ₱192.5M | 100% | High risk63 | —-0.058 |
| 24K00101CONST. OF JCT. SAYRE HIGHWAY TO JCT. PUNTIAN-ARAKAN RD(KITAIHON-BALANGINGAY-KITUBO SECTION), KITAOTAO, BUKIDNON, PACKAGE 2 | Region X | Region X | Completed | ₱189.5M | 100% | High risk63 | —-0.060 |
| 21K00309CLUSTER RO-O4 CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱175.7M | 100% | High risk63 | —-0.062 |
| 23K00283CLUSTER RO-2 CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON 1. CONSTRUCTION OF BRGY. KASIGKOT-BRGY. EMBAYAO-BRGY. SAN ROQUE-BRGY. PUALAS ROAD, DON CARLOS, BUKIDNON (PACKAGE III)2. CONSTRUCTION OF BRGY. KASIGKOT-BRGY. EMBAYAO-BRGY. SAN ROQUE-BRGY. PUA | Region X | Region X | Completed | ₱269.5M | 100% | High risk63 | —-0.050 |
| 19KA0138CLUSTER 2 1.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (BUSDI BR.), MALAYBALAY CITY 2.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (MATILOM BR.), IMPASUG-ONG, BUKIDNON 3.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD | Region X | Bukidnon 1st DEO | Completed | ₱260.1M | 100% | High risk62 | —-0.012 |
| 23K00176CONSTRUCTION OF JCT. BUKIDNON - DAVAO CITY ROAD TO JCT. KIBURIAO - KITAOTAO RD (SAN JOSE - MINSALIRAC - SAN ISIDRO - MANUTO - MINSAMONGAN - KIBURIAO SECTION), QUEZON, BUKIDNON, PACKAGE 1 | Region X | Region X | Completed | ₱140.7M | 100% | High risk62 | —-0.066 |
| 19KA0137CLUSTER 11.) CONSTRUCTION OF CONCRETE ROAD - MALAYBALAY-GINGOOG ROAD (GINGOOG CITY-KALHAAN, CLAVERIA-BULONAY-MALAYBALAY CITY), BULONAY PROPER TO SITIO ULAYANON, SECTION 1, BUKIDNON2.) CONSTRUCTION OF CONCRETE ROAD - MALAYBALAY-GINGOOG ROAD (GINGOOG | Region X | Bukidnon 1st DEO | Completed | ₱173.4M | 100% | High risk62 | —-0.058 |
| 18KA0049CLUSTER 1 - A. CONCRETING OF MALAYBALAY - GINGOOG ROAD,BUSDI SECTION, BUSDI, MALAYBALAY CITYB.CONCRETING OF MALAYBALAY- GINGOOG ROAD,CABURACANAN SECTION, CABURACANAN, MALAYBALAY CITYC. CONCRETING OF MALAYBALAY - GINGOOG ROAD,KULAMAN SECTION, KUL | Region X | Bukidnon 1st DEO | Completed | ₱194.8M | 100% | High risk62 | —-0.056 |
| 24K00388CONSTRUCTION OF PULANGI BRIDGE INCLUDING APPROACHES ALONG DON CARLOS-KIBURIAO, QUEZON, BUKIDNON (PHASE 3) | Region X | Region X | Completed | ₱121.3M | 100% | High risk62 | —-0.042 |
| 24K00106CONST. OF BOBONG BRIDGE ALONG JCT. DON CARLOS-KADINGILAN ROAD TO BRGY. CALAO-CALAO-BRGY. BERSHIBA-BRGY.BOBONG-BRGY.KAUYONAN-BRGY.STO.ROSARIO-BRGY.OSMEÑA ROAD, DANGCAGAN, BUKIDNON | Region X | Region X | On-Going | ₱94.8M | 96% | High risk61 | —-0.013 |
| 24K00071CONST. OF SAN LORENZO BRIDGE ALONG JCT. SAYRE HIGHWAY TO JCT. PUNTIAN-ARAKAN ROAD (KITAOTAO-BALANGINAY-KITUBO SECTION), KITAOTAO, BUKIDNON | Region X | Region X | On-Going | ₱94.8M | 95% | High risk61 | —-0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23KB0157CONSTRUCTION OF ROAD, JCT. SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY)-BARANGAY MAICAN, DAMULOG-SITIO RAPAGAS-SITIO STA. CRUZ, BARANGAY BALAORO ROAD, KADINGILAN (PACKAGE III) | Region X | Bukidnon 2nd DEO | On-Going | ₱94.8M | 65% | High risk87 | Flagged0.067 |
| 17KA0220CONSTRUCTION OF PULANGUI BRIDGE AND APPROACHES, SITIO MAHAN-AWIMPASUG-ONG, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱105.4M | 100% | Medium risk53 | Flagged0.027 |
| 24K00403CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. DON CARLOS-KADINGILAN RD (POBLACION, KITAOTAO-CALAO-CALAO, DON CARLOS), BUKIDNON, PACKAGE 2 | Region X | Region X | On-Going | ₱170.6M | 97% | High risk79 | Flagged0.016 |
| 25K00058CONSTRUCTION OF BOBONG BRIDGE ALONG JCT. DON CARLOS-KADINGILAN ROAD TO BARANGAY CALAO- CALAO-BARANGAY BERSHIBA-BARANGAY BOBONG-BARANGAY KAUYONAN-BARANGAY STO. ROSARIO-BARANGAY OSMEÑA ROAD, DANGCAGAN, BUKIDNON, PHASE II | Region X | Region X | On-Going | ₱56.9M | 67% | High risk95 | Flagged0.011 |
| 23K00240CLUSTER RO-1 -CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱288.7M | 100% | High risk78 | Flagged0.010 |
| 19K00433PROPOSED CONSTRUCTION OF NORTHERN MINDANAO CULTURE AND ARTS CENTER, BRGY. LAGUITAS, MALAYBALAY, BUKIDNON | Region X | Region X | Completed | ₱139.9M | 100% | Medium risk51 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25K00058CONSTRUCTION OF BOBONG BRIDGE ALONG JCT. DON CARLOS-KADINGILAN ROAD TO BARANGAY CALAO- CALAO-BARANGAY BERSHIBA-BARANGAY BOBONG-BARANGAY KAUYONAN-BARANGAY STO. ROSARIO-BARANGAY OSMEÑA ROAD, DANGCAGAN, BUKIDNON, PHASE II | Region X | Region X | On-Going | ₱56.9M | 67% | High risk95 | Flagged0.011 |
| 2 | 23KB0157CONSTRUCTION OF ROAD, JCT. SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY)-BARANGAY MAICAN, DAMULOG-SITIO RAPAGAS-SITIO STA. CRUZ, BARANGAY BALAORO ROAD, KADINGILAN (PACKAGE III) | Region X | Bukidnon 2nd DEO | On-Going | ₱94.8M | 65% | High risk87 | Flagged0.067 |
| 3 | 24K00403CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. DON CARLOS-KADINGILAN RD (POBLACION, KITAOTAO-CALAO-CALAO, DON CARLOS), BUKIDNON, PACKAGE 2 | Region X | Region X | On-Going | ₱170.6M | 97% | High risk79 | Flagged0.016 |
| 4 | 23K00240CLUSTER RO-1 -CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱288.7M | 100% | High risk78 | Flagged0.010 |
| 5 | 22K00313CONSTRUCTION OF BRIDGE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY)-BRGY. MAICAN, DAMULOG - SITIO RAPAGAS - SITIO STA. CRUZ, BRGY. BALAORO ROAD, KADINGILAN (PACKAGE III) | Region X | Region X | Completed | ₱140.7M | 100% | High risk64 | —-0.029 |
| 6 | 22K00362CONST. OF PULANGI BRIDGE (KIBATANG) ALONG DON CARLOS-KIBURIAO, QUEZON, BUKIDNON PHASE 2 | Region X | Region X | Completed | ₱140.7M | 100% | High risk64 | —-0.036 |
| 7 | 21K00084CONST. OF PULANGI BRIDGE ALONG DON CARLOS-KIBURIAO, QUEZON, BUKIDNON | Region X | Region X | Completed | ₱169.6M | 100% | High risk64 | —-0.024 |
| 8 | 20K00369CLUSTER BUK-01 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (MALUSIKOB BR.) MALAYBALAY CITY, BUKIDNON = PHP65,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL STRUCT... | Region X | Region X | Completed | ₱185.7M | 100% | High risk63 | —-0.044 |
| 9 | 22K00340CLUSTER RO-O3 CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱243.9M | 100% | High risk63 | —-0.047 |
| 10 | 23K00279CLUSTER RO-6 -CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON 1. CONSTRUCTION OF JCT. SAYRE HIGHWAY TO BRGY. MIARAY-BRGY. DOLOROSA, DANGCAGAN-BRGY. BALOCBOCAN ROAD, KITAOTAO, BUKIDNON (PACKAGE I) 2. CONSTRUCTION OF JCT. DON CARLOS-KADINGILAN ROAD TO BR | Region X | Region X | Completed | ₱192.5M | 100% | High risk63 | —-0.058 |
| 11 | 24K00101CONST. OF JCT. SAYRE HIGHWAY TO JCT. PUNTIAN-ARAKAN RD(KITAIHON-BALANGINGAY-KITUBO SECTION), KITAOTAO, BUKIDNON, PACKAGE 2 | Region X | Region X | Completed | ₱189.5M | 100% | High risk63 | —-0.060 |
| 12 | 21K00309CLUSTER RO-O4 CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱175.7M | 100% | High risk63 | —-0.062 |
| 13 | 23K00283CLUSTER RO-2 CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON 1. CONSTRUCTION OF BRGY. KASIGKOT-BRGY. EMBAYAO-BRGY. SAN ROQUE-BRGY. PUALAS ROAD, DON CARLOS, BUKIDNON (PACKAGE III)2. CONSTRUCTION OF BRGY. KASIGKOT-BRGY. EMBAYAO-BRGY. SAN ROQUE-BRGY. PUA | Region X | Region X | Completed | ₱269.5M | 100% | High risk63 | —-0.050 |
| 14 | 19KA0138CLUSTER 2 1.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (BUSDI BR.), MALAYBALAY CITY 2.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (MATILOM BR.), IMPASUG-ONG, BUKIDNON 3.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD | Region X | Bukidnon 1st DEO | Completed | ₱260.1M | 100% | High risk62 | —-0.012 |
| 15 | 23K00176CONSTRUCTION OF JCT. BUKIDNON - DAVAO CITY ROAD TO JCT. KIBURIAO - KITAOTAO RD (SAN JOSE - MINSALIRAC - SAN ISIDRO - MANUTO - MINSAMONGAN - KIBURIAO SECTION), QUEZON, BUKIDNON, PACKAGE 1 | Region X | Region X | Completed | ₱140.7M | 100% | High risk62 | —-0.066 |
| 16 | 19KA0137CLUSTER 11.) CONSTRUCTION OF CONCRETE ROAD - MALAYBALAY-GINGOOG ROAD (GINGOOG CITY-KALHAAN, CLAVERIA-BULONAY-MALAYBALAY CITY), BULONAY PROPER TO SITIO ULAYANON, SECTION 1, BUKIDNON2.) CONSTRUCTION OF CONCRETE ROAD - MALAYBALAY-GINGOOG ROAD (GINGOOG | Region X | Bukidnon 1st DEO | Completed | ₱173.4M | 100% | High risk62 | —-0.058 |
| 17 | 18KA0049CLUSTER 1 - A. CONCRETING OF MALAYBALAY - GINGOOG ROAD,BUSDI SECTION, BUSDI, MALAYBALAY CITYB.CONCRETING OF MALAYBALAY- GINGOOG ROAD,CABURACANAN SECTION, CABURACANAN, MALAYBALAY CITYC. CONCRETING OF MALAYBALAY - GINGOOG ROAD,KULAMAN SECTION, KUL | Region X | Bukidnon 1st DEO | Completed | ₱194.8M | 100% | High risk62 | —-0.056 |
| 18 | 24K00388CONSTRUCTION OF PULANGI BRIDGE INCLUDING APPROACHES ALONG DON CARLOS-KIBURIAO, QUEZON, BUKIDNON (PHASE 3) | Region X | Region X | Completed | ₱121.3M | 100% | High risk62 | —-0.042 |
| 19 | 24K00106CONST. OF BOBONG BRIDGE ALONG JCT. DON CARLOS-KADINGILAN ROAD TO BRGY. CALAO-CALAO-BRGY. BERSHIBA-BRGY.BOBONG-BRGY.KAUYONAN-BRGY.STO.ROSARIO-BRGY.OSMEÑA ROAD, DANGCAGAN, BUKIDNON | Region X | Region X | On-Going | ₱94.8M | 96% | High risk61 | —-0.013 |
| 20 | 24K00071CONST. OF SAN LORENZO BRIDGE ALONG JCT. SAYRE HIGHWAY TO JCT. PUNTIAN-ARAKAN ROAD (KITAOTAO-BALANGINAY-KITUBO SECTION), KITAOTAO, BUKIDNON | Region X | Region X | On-Going | ₱94.8M | 95% | High risk61 | —-0.013 |
| 21 | 24K00051CONST. OF SAN ISIDRO BRIDGE ALONG JCT. BUKIDNON-DAVAO CITY RD. TO JCT. KIBURIAO-KITAOTAO RD(SAN-JOSE-MINSALIRAC-SAN ISIRO-MANUTO-MINSAMONGAN-KIBURIAO SECTION), QUEZON, BUKIDNON | Region X | Region X | On-Going | ₱94.8M | 100% | High risk61 | —-0.014 |
| 22 | 20K00370CLUSTER BUK1-02 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (KULAMAN BR.) MALAYBALAY CITY, BUKIDNON = PHP70,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL ... | Region X | Region X | Completed | ₱127.2M | 100% | High risk61 | —-0.057 |
| 23 | 24K00430CONSTRUCTION OF JCT. SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD.- COTABATO BDRY) TO BRGY. MACAPARI, DAMULOG TO SITIO TALASAN, BRGY. PINAMANGGUHAN ROAD, KADINGILAN, BUKIDNON (PACKAGE IV) | Region X | Region X | On-Going | ₱94.8M | 100% | Medium risk58 | —-0.047 |
| 24 | 23K00248CLUSTER RO-5- CONSTRUCTION OF VARIOUS ROAD PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱124.4M | 100% | Medium risk58 | —-0.073 |
| 25 | 23K00276CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. DON CARLOS-KADINGILAN RD (POBLACION, KITAOTAO - CALAO-CALAO, DON CARLOS), BUKIDNON, PACKAGE 1 | Region X | Region X | Completed | ₱94.8M | 100% | Medium risk58 | —-0.078 |