Opening the dossier…
Opening the dossier…
Contractor dossier
69 projects on file, including joint ventures this contractor is part of.
Total projects
69
Total budget
₱671.1M
Average progress
96.1%
Completion rate
94.2%
Average risk score
29.4
Low risk on average, out of 100
Flagged as unusual
3
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 36 | ₱333.9M | 21.2 | 2 | 94.5% |
| National Capital Region | 22 | ₱153.6M | 32.9 | 0 | 100.0% |
| Region IV-A | 11 | ₱183.5M | 49.0 | 1 | 93.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 32 | ₱170.1M | 19.0 | 0 | 100.0% |
| Buildings and Facilities | 20 | ₱87.1M | 30.2 | 0 | 100.0% |
| Flood Control and Drainage | 14 | ₱303.6M | 44.6 | 2 | 85.9% |
| GAA 2025 SSP | 1 | ₱96M | 95.8 | 1 | 29.6% |
| OTHER | 1 | ₱11M | 67.9 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3.2M | 24.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25CL0257CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG SANTO TOMAS RIVER (OMAYA-BALINGCAGUING-PAITE SECTION), SAN NARCISO, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | On-Going | ₱48.8M | 1% | High risk74 | Flagged0.000 |
| 25CL0256CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG SANTO TOMAS RIVER (OMAYA-BALINGCAGUING-PAITE SECTION), SAN NARCISO, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱48.8M | 1% | High risk74 | Flagged0.000 |
| 24CL0173CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG OMAYA RIVER, SAN NARCISO, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱48.8M | 100% | High risk73 | —-0.029 |
| 19DF0066LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT - KENSINGTON PHASE I, LANCASTER), BARANGAY NAVARRO FELIX MANALO, GENERAL TRIAS; (COVERED COURT - T | Region IV-A | Cavite 1st DEO | Completed | ₱11M | 100% | High risk68 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25CL0256CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG SANTO TOMAS RIVER (OMAYA-BALINGCAGUING-PAITE SECTION), SAN NARCISO, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱48.8M | 1% | High risk74 | Flagged0.000 |
| 25CL0257CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG SANTO TOMAS RIVER (OMAYA-BALINGCAGUING-PAITE SECTION), SAN NARCISO, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | On-Going | ₱48.8M | 1% | High risk74 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 2 | 25CL0257CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG SANTO TOMAS RIVER (OMAYA-BALINGCAGUING-PAITE SECTION), SAN NARCISO, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | On-Going | ₱48.8M | 1% | High risk74 | Flagged0.000 |
| 3 | 25CL0256CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG SANTO TOMAS RIVER (OMAYA-BALINGCAGUING-PAITE SECTION), SAN NARCISO, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱48.8M | 1% | High risk74 | Flagged0.000 |
| 4 | 24CL0173CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG OMAYA RIVER, SAN NARCISO, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱48.8M | 100% | High risk73 | —-0.029 |
| 5 | 19DF0066LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT - KENSINGTON PHASE I, LANCASTER), BARANGAY NAVARRO FELIX MANALO, GENERAL TRIAS; (COVERED COURT - T | Region IV-A | Cavite 1st DEO | Completed | ₱11M | 100% | High risk68 | —-0.042 |
| 6 | 19DI0083CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. SAN ANTONIO, SAN PEDRO, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱12.5M | 100% | Medium risk50 | —-0.105 |
| 7 | 19DF0065LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT), ACM PHASE 5, ALAPAN I-A; WOODLANE SUBDIVISION MALAGASANG I-A, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱6.6M | 100% | Medium risk50 | —-0.105 |
| 8 | 19DF0046LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES -CONSTRUCTION/COMPLETION OF BASKETBALL STAGE AND LIGHTS, TIERRE NEVADA SUBDIVISION, PHASE VII, BRGY. SAN FRANCISCO, GEN. TRIAS, CAVITE; CONSTRUCTION OF M | Region IV-A | Cavite 1st DEO | Completed | ₱6.1M | 100% | Medium risk50 | —-0.101 |
| 9 | 19DF0114LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT), BRGY. MINANTOK EAST, AMADEO; CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT), BRGY. AMA | Region IV-A | Cavite 1st DEO | Completed | ₱13.2M | 100% | Medium risk49 | —-0.099 |
| 10 | 19OE0179LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES- MULTI - PURPOSE / FACILITIES- REHAB. / REPAIR OF THE FTHS LIBRARY OF F. TORRES HIGH SCHOOL, GAGALANGIN, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.103 |
| 11 | 19OH0136LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CON | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 12 | 19DF0035LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES, LOCAL ROADS, ROAD CONCRETING, BRGY. AGUADO, TRECE MARTIRES CITY; BRGY. AMAYA, TANZA; BRGY. BUCAL, AMADEO; BRGY. CALIBUYO, TANZA; BRGY. MAYMANGGA, AMADEO; BRGY. POBLACION 5, AMADEO; BRGY. SAN JUAN I, | Region IV-A | Cavite 1st DEO | Completed | ₱14.6M | 100% | Medium risk46 | —-0.105 |
| 13 | 19OC0227REHABILITATION/UPGRADING OF DRAINAGE SYSTEM ALONG MASTHEAD ST., BRGY. SAN ANTONIOPARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.081 |
| 14 | 19OH0119LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CON | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 15 | 19OC0091REHABILITATION/UPGRADING OF DRAINAGE SYSTEM AT GAWAD KALINGA, BRGY. MARCELO GREEN,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱13.1M | 100% | Medium risk46 | —-0.062 |
| 16 | 19OC0033CONSTRUCTION OF BOX CULVERT ALONG DON BOSCO CREEK (FROM FRANCE STREET), BRGY. DON BOSCO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱27.9M | 100% | Medium risk46 | —-0.068 |
| 17 | 19DF0057ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -ASSET PRESERVATION-CONSTRUCTION/UPGRADING /REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROAD - NOVELETA - NAIC - TAGAYTAY RD - K0031+ 586 - K0031+913, K0035+792 - K0 | Region IV-A | Cavite 1st DEO | Completed | ₱8.7M | 100% | Medium risk46 | —-0.104 |
| 18 | 20OE0102BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE ULI - ULI, STA. 0+528.00 TO STA. 0+560.00, MANILA | National Capital Region | North Manila DEO | Completed | ₱23.3M | 100% | Medium risk46 | —-0.089 |
| 19 | 19OC0074REHABILITATION/UPGRADING OF DRAINAGE SYSTEM ALONG ASTER ST. AND ITS VICINITY, BRGY. SUNVALLEY,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱13.9M | 100% | Medium risk46 | —-0.077 |
| 20 | 20OC0053REHABILITATION OF DRAINAGE SYSTEM AT AREA 4, BARANGAY BACLARAN,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱6.6M | 100% | Medium risk45 | —-0.071 |
| 21 | 18DF0131FARM TO MARKET ROAD (FMR) PROJECTS, CONCRETING OF BRGY. CAPIPIZA FMR,BRGY. CAPIPIZA, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.7M | 100% | Medium risk42 | —-0.052 |
| 22 | 19CD0125CONCRETING OF TALBAK I, BRGY. ENCANTO PULONG YANTOK SECTION FMR, BRGY. ENCANTO, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱19.1M | 100% | Medium risk35 | —-0.044 |
| 23 | 20CL0067CONCRETING OF BANGCOL TO ALMASIN ROAD (WITH SLOPE PROTECTION), BRGY. BANGCOL, STA. CRUZ,ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱18.8M | 100% | Medium risk35 | —-0.093 |
| 24 | 20CL0069CONCRETING OF ROAD, CAMP CONRADO YAP, BRGY. LIPAY-DINGIN-PANIBUATAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱14.1M | 100% | Medium risk34 | —-0.097 |
| 25 | 18CD0187CONCRETING OF TALBAK ROAD IN BRGY. ENCANTO, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱18.8M | 100% | Medium risk34 | —-0.106 |