Contractor dossier
59 projects on file, including joint ventures this contractor is part of.
Total projects
59
Total budget
₱1.4B
Average progress
85.7%
Completion rate
57.6%
Below 70%
Average risk score
56.0
Medium risk on average, out of 100
Flagged as unusual
15
25.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 59 | ₱1.4B | 56.0 | 15 | 85.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 19 | ₱134.1M | 50.3 | 1 | 94.4% |
| Roads | 15 | ₱241M | 42.4 | 2 | 93.3% |
| Flood Control and Drainage | 9 | ₱425.3M | 54.5 | 2 | 75.2% |
| GAA 2025 SSP | 6 | ₱376.4M | 95.0 | 6 | 63.5% |
| Bridges | 3 | ₱28.2M | 49.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱115.9M | 91.4 | 1 | 78.5% |
| OTHER | 2 | ₱29.7M | 89.2 | 2 | 56.5% |
| Water Provision and Storage | 2 | ₱5.2M | 23.3 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱19.2M | 92.9 | 1 | 36.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GF0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SAN JOAQUIN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱139.8M | 40% | High risk96 | Flagged0.046 |
| 25GF0089CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TIGBAUAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱139.8M | 30% | High risk96 | Flagged0.048 |
| 25GF0090CONSTRUCTION OF TANGYAN FLOOD CONTROL AND REVETMENT PROJECT ALONG LUBACAN-NITO-AN-LUPSAG SECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 72% | High risk95 | Flagged0.022 |
| 25GF0091CONSTRUCTION OF JARAO FLOOD CONTROL AND REVETMENT PROJECT ALONG NAHAPAY-BINANU-AN CAMANGAHAN SECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 80% | High risk95 | Flagged0.020 |
| 25GF0084CONSTRUCTION OF JARAO FLOOD CONTROL AND REVETMENT PROJECT ALONG CAMANGAHAN-IGCOCOLO-SIPITAN SECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 85% | High risk95 | Flagged0.018 |
| 25GF0025CONSTRUCTION OF TANGYAN RIVER FLOOD CONTROL PROJECT (PHASE 2), BRGY. NITOAN, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱96.4M | 73% | High risk94 | Flagged0.002 |
| 25GF0019CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITES, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱7.9M | 73% | High risk93 | Flagged0.020 |
| 25G00003REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES- ILOILO CITY FLYOVER (B00466PN) ALONG ILOILO CITY FLYOVER | Region VI | Region VI | On-Going | ₱19.2M | 36% | High risk93 | Flagged0.013 |
| 25GF0104CONCRETING OF BRGY. TABAT TO AMBARIHON FMR, BRGY. TABAT AND BRGY. AMBARIHON, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱14.9M | 42% | High risk89 | Flagged0.060 |
| 25GF0103CONCRETING OF SITIO HATOL TO SITIO KATIKLAN, BRGY. NANGA FMR, BRGY. NANGA, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱14.9M | 71% | High risk89 | Flagged0.053 |
| 25GF0002CONSTRUCTION OF TUBUNGAN FLOOD CONTROL STRUCTURE, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱19.5M | 84% | High risk89 | —-0.010 |
| 25GF0086CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, OTON, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱139.8M | 0% | High risk80 | Flagged0.026 |
| 25GF0015CONSTRUCTION OF JARAO FLOOD CONTROL STRUCTURE WITH ACCESS ROAD ALONG BARANGAY IGCOCOLO-BARANGAY SIPITAN-BARANGAY CAMANGAHAN SECTION, PHASE II, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱49.4M | 92% | High risk74 | —-0.014 |
| 25GF0021CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITES, IGBARAS, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱7.9M | 0% | High risk71 | Flagged0.008 |
| 24GF0103REHABILITATION OF MULTI-PURPOSE BUILDING, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱8.9M | 93% | High risk71 | —-0.020 |
| 24GF0112CONSTRUCTION OF TUBUNGAN ACCESS ROAD, INCLUDING RIVER CONTROL STRUCTURE, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱73.2M | 88% | High risk71 | —-0.015 |
| 24GF0013CONSTRUCTION OF IGPIGUS ES MULTI-PURPOSE BUILDING INCLUDING FACILITIES, BARANGAY IGPIGUS, IGBARAS, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱6.9M | 100% | High risk69 | —-0.058 |
| 23GF0114CONCRETING OF BRGY. ADGAO TO BRGY. TABAT FMR, BRGY. ADGAO AND BRGY. TABAT, TUBUNGAN,ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱11.9M | 100% | High risk65 | Flagged0.039 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GF0104CONCRETING OF BRGY. TABAT TO AMBARIHON FMR, BRGY. TABAT AND BRGY. AMBARIHON, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱14.9M | 42% | High risk89 | Flagged0.060 |
| 25GF0103CONCRETING OF SITIO HATOL TO SITIO KATIKLAN, BRGY. NANGA FMR, BRGY. NANGA, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱14.9M | 71% | High risk89 | Flagged0.053 |
| 25GF0089CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TIGBAUAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱139.8M | 30% | High risk96 | Flagged0.048 |
| 25GF0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SAN JOAQUIN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱139.8M | 40% | High risk96 | Flagged0.046 |
| 24GF0153CONSTRUCTION OF GUIMBAL RIVER CONTROL PROJECT, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱48.2M | 0% | Medium risk58 | Flagged0.044 |
| 23GF0114CONCRETING OF BRGY. ADGAO TO BRGY. TABAT FMR, BRGY. ADGAO AND BRGY. TABAT, TUBUNGAN,ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱11.9M | 100% | High risk65 | Flagged0.039 |
| 25GF0086CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, OTON, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱139.8M | 0% | High risk80 | Flagged0.026 |
| 25GF0090CONSTRUCTION OF TANGYAN FLOOD CONTROL AND REVETMENT PROJECT ALONG LUBACAN-NITO-AN-LUPSAG SECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 72% | High risk95 | Flagged0.022 |
| 25GF0091CONSTRUCTION OF JARAO FLOOD CONTROL AND REVETMENT PROJECT ALONG NAHAPAY-BINANU-AN CAMANGAHAN SECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 80% | High risk95 | Flagged0.020 |
| 25GF0019CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITES, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱7.9M | 73% | High risk93 | Flagged0.020 |
| 25GF0084CONSTRUCTION OF JARAO FLOOD CONTROL AND REVETMENT PROJECT ALONG CAMANGAHAN-IGCOCOLO-SIPITAN SECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 85% | High risk95 | Flagged0.018 |
| 25G00003REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES- ILOILO CITY FLYOVER (B00466PN) ALONG ILOILO CITY FLYOVER | Region VI | Region VI | On-Going | ₱19.2M | 36% | High risk93 | Flagged0.013 |
| 25GF0021CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITES, IGBARAS, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱7.9M | 0% | High risk71 | Flagged0.008 |
| 23GE0076CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF CROSSING DAVID - BIANTAO ROAD, BARANGAY POBLACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱9.5M | 100% | Medium risk41 | Flagged0.008 |
| 25GF0025CONSTRUCTION OF TANGYAN RIVER FLOOD CONTROL PROJECT (PHASE 2), BRGY. NITOAN, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱96.4M | 73% | High risk94 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23GF0033CONSTRUCTION OF SIBUCAUAN ES MULTIPURPOSE BUILDING,TUBUNGAN,ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.086 |
| 27 | 24GF0020CONSTRUCTION OF JAMOG IS MULTI-PURPOSE BUILDING INCLUDING FACILITIES, BARANGAY JAMOG, TIGBAUAN, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱6.4M | 100% | Medium risk47 | —-0.084 |
| 28 | 24GF0053CONSTRUCTION OF MULTI-PURPOSE BUILDING (TUBUNGAN SKILLS TRAINING CENTER), BARANGAY BACAN, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.085 |
| 29 | 23GJ0087CONSTRUCTION OF MULTIPURPOSE BUILDING - CONSTRUCTION OF MULTIPURPOSE BUILDING, MH DEL PILAR JARO, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱5.9M | 100% | Medium risk47 | —-0.085 |
| 30 | 24GF0009CONSTRUCTION OF AMOROGTONG ES MULTI-PURPOSE BUILDING INCLUDING FACILITIES, BARANGAY AMOROGTONG, IGBARAS, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱6.4M | 100% | Medium risk47 | —-0.085 |
| 31 | 23GF0023CONSTRUCTION OF LA CONSOLACION ELEMENTARY SCHOOL MULTIPURPOSE BUILDING, MIAG-AO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.085 |
| 32 | 23GF0083CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPALITY OF OTON, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱5.2M | 100% | Medium risk46 | —-0.085 |
| 33 | 23GF0140CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPALITY OF TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱5.2M | 100% | Medium risk46 | —-0.085 |
| 34 | 23GF0139CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPALITY OF TIGBAUAN, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱5.2M | 100% | Medium risk46 | —-0.084 |
| 35 | 23GF0132CONSTRUCTION OF 3 STOREY SCHOOL BUILDING WITH 12 CLASSROOM AT OTON NATIONAL HIGHSCHOOL, OTON, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱29.5M | 100% | Medium risk46 | —-0.036 |
| 36 | 24GF0030CONSTRUCTION OF SIBALOM RIVER CONTROL AND REVETMENT, TIGBAUAN, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱29.7M | 100% | Medium risk46 | —-0.070 |
| 37 | 23GE0050CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPALITY OF BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱5.1M | 100% | Medium risk46 | —-0.084 |
| 38 | 23GE0049CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPALITY OF SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱5.1M | 100% | Medium risk46 | —-0.083 |
| 39 | 25GF0035CONSTRUCTION OF TANGYAN FLOOD CONTROL STRUCTURE WITH ACCESS ROAD, PHASE II, ALONG BARANGAY LUBACAN-BARANGAY ANONO-O SECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 89% | Medium risk46 | —-0.037 |
| 40 | 25GF0041CONSTRUCTION OF TANGYAN FLOOD CONTROL STRUCTURE WITH ACCESS ROAD, PHASE II, ALONG BARANGAY BULAD-BARANGAY NITO-AN SECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | On-Going | ₱29.6M | 100% | Medium risk46 | —-0.044 |
| 41 | 23GF0079CONSTRUCTION OF IGTUBLE HANGING BRIDGE, BRGY. IGTUBLE, TUBUNGAN, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.055 |
| 42 | 24GE0050REHABILITATION OF PAVED ROAD - IMPROVEMENT OF CONCORDIA-ORACON-BOTCONAWAY ROAD, BARANGAY CONCORDIA, BARANGAY ORACON AND BARANGAY SAN ANTONIO, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.6M | 100% | Medium risk46 | —-0.051 |
| 43 | 23GE0057CONCRETING OF SITIO PIN-AS, BRGY. SEBASTE FMR, BRGY. SEBASTE, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱14.8M | 100% | Medium risk46 | —-0.033 |
| 44 | 23GF0117CONCRETING OF BRGY. MAYANG TO BRGY. TALENTO FMR, BRGY. MAYANG AND TALENTO, TUBUNGAN,ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱14.8M | 100% | Medium risk46 | —-0.035 |
| 45 | 24GE0032REHABILITATION/MAJOR REPAIR OF BRIDGE- NABAGATNAN BR. (B00021GR) ALONG GUIMARAS CIRCUMFERENTIAL RD | Region VI | Guimaras DEO | Completed | ₱11.6M | 100% | Medium risk46 | —-0.054 |
| 46 | 24GF0117CONSTRUCTION OF IGBARAS RIVER CONTROL STRUCTURE, IGBARAS, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱19.7M | 100% | Medium risk46 | —-0.073 |
| 47 | 24GF0118CONSTRUCTION OF SHORELINE PROTECTION STRUCTUREC, COASTWISE, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱29.6M | 100% | Medium risk45 | —-0.070 |
| 48 | 24GF0060CONCRETING OF BRGY. DANAWAN TO BRGY. IGDAGMAY ROAD SAN JOAQUIN, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱24.4M | 100% | Medium risk45 | —-0.085 |
| 49 | 24GE0053OFF-CARRIAGEWAY IMPROVEMENT: IMPROVEMENT OF INTERSECTIONS - GUIMARAS CIRCUMFERENTIAL RD (S00028GR) - K0000+(-388) | Region VI | Guimaras DEO | On-Going | ₱24.3M | 11% | Medium risk45 | —-0.021 |
| 50 | 24GE0038CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF STO. DOMINGO ROAD, BARANGAY STO. DOMINGO, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱11.6M | 100% | Medium risk44 | —-0.086 |