Opening the dossier…
Opening the dossier…
Contractor dossier
535 projects on file, including joint ventures this contractor is part of.
Total projects
535
Total budget
₱17.2B
Average progress
97.1%
Completion rate
82.8%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
21
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 524 | ₱16.7B | 45.4 | 20 | 97.2% |
| Negros Island Region | 7 | ₱325.2M | 52.5 | 0 | 94.0% |
| Region VII | 4 | ₱150.5M | 46.5 | 1 | 97.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 196 | ₱7.8B | 48.3 | 3 | 96.6% |
| Buildings and Facilities | 119 | ₱1.5B | 34.9 | 1 | 98.6% |
| Flood Control and Drainage | 106 | ₱4.2B | 48.4 | 0 | 99.2% |
| Water Provision and Storage | 41 | ₱604.7M | 30.7 | 0 | 100.0% |
| Bridges | 40 | ₱944.6M | 40.3 | 2 | 98.7% |
| OTHER | 27 | ₱1.6B | 79.4 | 13 | 84.9% |
| GAA 2025 OO-2 | 4 | ₱457M | 93.6 | 0 | 92.0% |
| GAA 2025 SSP | 2 | ₱39.5M | 95.6 | 2 | 41.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 25IF0010CONSTRUCTION OF LEONDONI FLOOD CONTROL STRUCTURE, BARANGAY LEONDONI, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0009CONSTRUCTION OF SANTO NIÑO FLOOD CONTROL STRUCTURE, BARANGAY SANTO NIÑO, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0025CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱129M | 78% | High risk93 | —-0.002 |
| 25IG0031CONSTRUCTION OF MACAHILA FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, MACAHILA RIVER BASIN, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱136M | 92% | High risk93 | —-0.002 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 18IE0082CONSTRUCTION OF CALUBIAN-JUBAY-DAJA ROAD INCLUDING BRIDGES, CALUBIAN AND SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱160.2M | 100% | High risk83 | —-0.015 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 18IE0070NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT TERTIARY ROADS, TABANGO-CATMON-LA FORTUNA-MANLAWAAN-GIMARCO RD., K1036+800 - K1038+000 TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.6M | 100% | High risk82 | —-0.025 |
| 18IE0069NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0984+(-300)-K0984+766, K0984+838-K0985+505 LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱92.6M | 100% | High risk82 | —-0.027 |
| 23IF0065CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ORMOC CITY DIVERSION ROAD (NAUNGAN - LINAO - ALEGRIA - POBLACION), OMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱105.5M | 100% | High risk82 | —-0.019 |
| 24I00168FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 3), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 96% | High risk82 | Flagged0.000 |
| 24I00167FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 2), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 97% | High risk82 | —-0.001 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 18IE0072NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS, CALUBIAN JCT-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1011+952 - K1013+700 SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.7M | 100% | High risk81 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 22IF0101CONSTRUCTION OF PALOMPON LEYTE PORT | Region VIII | Leyte 4th DEO | On-Going | ₱19.5M | 0% | Medium risk53 | Flagged0.020 |
| 24IF0123REPAIR/REHABILITATION/IMPROVEMENT OF EXISTING CROSS DRAIN & DRAINAGE SYSTEM STRUCTURE ALONG PALO - CARIGARA - ORMOC ROAD - K0988+588 - K0989+073 | Region VIII | Leyte 4th DEO | On-Going | ₱19.2M | 0% | High risk78 | Flagged0.020 |
| 22IE0023ACCESS ROAD LEADING TO SILAD PORT, VILLABA, LEYTE (NEW ROUTE) VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱47.8M | 84% | High risk80 | Flagged0.017 |
| 22IE0041REHABILITATION OF ROAD ALONG RAILES-ENAGE-ANISLAGAN-CASIONGAN (CALUBIAN) VIA SITIO AIRPORT-SITIO CROSSING-SITIO LIMITE (DAJA DAKU) AND SITIO CROSSING-CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱48M | 77% | High risk80 | Flagged0.017 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 17IE0062OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1005+(-346)-K1005+644; K1005+662-K1006+429; K1006+450-K1008+074; K1008+089-K1008+574; K1008+713-K1010+857; K1015+000-K1016+595; K1016+610-K1017+560; K | Region VIII | Leyte 3rd DEO | On-Going | ₱91.6M | 100% | High risk60 | Flagged0.015 |
| 25IE0059CONCRETING OF BRGY. VILLAHERMOSA TO BRGY. GARRIDO FMR, BRGY. VILLAHERMOSA AND BRGY. GARRIDO, CALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱14.9M | 30% | Medium risk52 | Flagged0.010 |
| 22IE0048CONSTRUCTION OF CALUBIAN-JUBAY-DAJA RD. (MISSING GAP), CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱38.4M | 100% | High risk77 | Flagged0.009 |
| 25IF0088CONCRETING OF BRGY. MALAZARTE - BRGY. CAMBADBAD FMR, BRGY. MALAZARTE AND BRGY. CAMBADBAD, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱47.8M | 59% | Medium risk55 | Flagged0.007 |
| 23H00124CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GARING-PANAS ROAD, PHASE II, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱72.3M | 91% | High risk68 | Flagged0.003 |
| 21I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES - CALAGUISE BR. ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., BRGY. CALAGUISE, LEYTE, LEYTE | Region VIII | Region VIII | On-Going | ₱45.8M | 93% | Medium risk50 | Flagged0.002 |
| 22I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES, CALAGUISE BR. (B00093LT) ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., LEYTE 3RD LD | Region VIII | Region VIII | On-Going | ₱28.9M | 67% | Medium risk50 | Flagged0.002 |
| 25IF0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), LAKE DANAO - GAAS - SITIO MAGLAHOG - QUEZON JR. ROAD LEADING TO LAKE DANAO AND LAKE KASUDSURAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱32.7M | 74% | High risk78 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 25IF0002REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGE PAVED ROADS - TERTIARY ROADS - MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL RD - K1109+577-K1109+662, K1114+410-K1114+770, K1117+710-K1117+880, K1122+000-K1122+117, K1123+043-K1123+118 | Region VIII | Leyte 4th DEO | On-Going | ₱31M | 90% | Medium risk48 | —-0.058 |
| 277 | 22IF0082CONSTRUCTION OF ROAD, BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱29.7M | 100% | Medium risk48 | —-0.095 |
| 278 | 21IL0084CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG LILOAN - SAN RICARDO ROAD SON OK - MANGLIT SECTION, PINTUYAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.077 |
| 279 | 24IF0040REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - LIBUNGAO - MATAG-OB - PALOMPON RD - K1009+006.7 - K1009+139, K1009+565.5 - K1009+952, K1010+000 -K1010+113, K1012+562 - K1012+874.7 | Region VIII | Leyte 4th DEO | Completed | ₱19.8M | 100% | Medium risk48 | —-0.095 |
| 280 | 24IF0047CONSTRUCTION OF CAUSEWAY, LAKE DANAO, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.4M | 0% | Medium risk48 | —-0.019 |
| 281 | 25IE0020CONSTRUCTION OF JNR BANGKAL-SITIO ALEGRIA ROAD, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱11.6M | 0% | Medium risk48 | —-0.032 |
| 282 | 24IF0122REPAIR AND REHABILITATION OF ROAD SLOPE PROTECTION, KANANGA - TONGONAN - HOT SPRING ROAD, K0998+522 - K0998+552 | Region VIII | Leyte 4th DEO | On-Going | ₱19.2M | 100% | Medium risk48 | —-0.060 |
| 283 | 21IF0033CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ALBUERA-MOUNTAIN RESORT ROAD, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱45.8M | 100% | Medium risk48 | —-0.094 |
| 284 | 21IF0031CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF LAKE DANAO CIRCUMFERENTIAL ROAD, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱45.8M | 100% | Medium risk48 | —-0.095 |
| 285 | 18IF0045RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, RAQUIZA BRIDGE (B00205LT) ALONG PALOMPON - ISABEL - MERIDA - ORMOC ROAD | Region VIII | Leyte 4th DEO | Completed | ₱5.6M | 100% | Medium risk48 | —-0.060 |
| 286 | 18IF0044RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MATAG-OB BRIDGE (B00200LT) ALONG LIBUNGAO -MATAG-OB - PALOMPON ROAD | Region VIII | Leyte 4th DEO | Completed | ₱5.6M | 100% | Medium risk48 | —-0.061 |
| 287 | 23IF0097CONSTRUCTION OF SOLAR WATER SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱9.8M | 100% | Medium risk48 | —-0.055 |
| 288 | 24IG0059CONSTRUCTION OF BARANGAY ROAD FROM BARANGAY ELEVADO TO BARANGAY PRES. GARCIA, MATALOM, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱33.9M | 100% | Medium risk48 | —-0.052 |
| 289 | 24IG0093CONSTRUCTION OF RCDG BRIDGE, BRGY. CANTANDOG 2, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱24.4M | 100% | Medium risk48 | —-0.024 |
| 290 | 18IG0072WIDENING OF PERMANENT BRIDGES, LUNAS BR. (B00243LT) ALONG ORMOC-BAYBAY-SOUTHERN LEYTE BOUNDARY ROAD, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱17M | 100% | Medium risk48 | —-0.061 |
| 291 | 18IF0030CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - LIBUNGAO - MATAG-OB - PALOMPON ROAD, K0997+180-K0997+276, K0997+510 -K0997+560, K0997+946-K0997+992, K0998+033 -K0998+066, K0998+092-K0998+193, K0998+217-K0998+245, K0998+264 -K0998+291,K0998+318 - K0998+331 | Region VIII | Leyte 4th DEO | Completed | ₱13.8M | 100% | Medium risk48 | —-0.096 |
| 292 | 18IF0031CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MERIDA - LUNDAG - PUTTING BATO - CONSOLACION - ISABEL RD K1108+(-280) - K1108+(-210), K1108+(-303) - K1108+(-245), K1110+717 - K1110+817, K1110+893 - K1110+923, K1115+000 - K1115+070, K1115+651 - K1115+726 | Region VIII | Leyte 4th DEO | Completed | ₱16.8M | 100% | Medium risk48 | —-0.095 |
| 293 | 18IG0036OFF CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS-BATO-BONTOC ROAD K1110+848-K1111+000,K1111+000-K1111+211,K1111+211-K1111+441,K1111+441-K1111+484,K1111+484-K1111+726,K1111+726-K1111+872,K1111+872-K1112+000,K1112+000-K1112+022,K1112+022-K1112+130,K1112+130-K111 | Region VIII | Leyte 5th DEO | Completed | ₱42.6M | 100% | Medium risk48 | —-0.095 |
| 294 | 20IF0007RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, KINAOHANGAN BR, (B00223LT) ALONG PALOMPON-ISABEL-MERIDA-ORMOC ROAD | Region VIII | Leyte 4th DEO | Completed | ₱5.1M | 100% | Medium risk48 | —-0.057 |
| 295 | 23IF0054PROCUREMENT AND INSTALLATION OF STREETLIGHTS, BRGY. POBLACION AND RIZAL, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱9.7M | 100% | Medium risk48 | —-0.095 |
| 296 | 20IF0074CONSTRUCTION OF NATUBGAN - MAHAWAN ROAD, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱11.6M | 100% | Medium risk48 | —-0.096 |
| 297 | 19IG0007ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-TACLOBAN-BAYBAY-SOUTH RD-K0988+420-K0988+520, K0988+530-K0988+585, K0990+460-K0990+580,K0994+680-K0994+780 | Region VIII | Leyte 5th DEO | Completed | ₱30.9M | 100% | Medium risk48 | —-0.092 |
| 298 | 24IF0064REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - LIBUNGAO - MATAG-OB - PALOMPON RD - K1016+(-018) - K1016+129.8 | Region VIII | Leyte 4th DEO | Completed | ₱20.5M | 100% | Medium risk48 | —-0.095 |
| 299 | 24IF0118REPAIR AND REHABILITATION OF ROAD SLOPE PROTECTION ALONG ORMOC - BAYBAY - SOUTHERN LEYTE BOUNDARY ROAD, K1024+713.60 (LEFT SIDE) | Region VIII | Leyte 4th DEO | On-Going | ₱19.3M | 100% | Medium risk48 | —-0.059 |
| 300 | 24IF0119REPAIR AND REHABILITATION OF ROAD SLOPE PROTECTION ALONG ORMOC - BAYBAY - SOUTHERN LEYTE BOUNDARY ROAD, K1023+300 (RIGHT SIDE) | Region VIII | Leyte 4th DEO | On-Going | ₱19.2M | 100% | Medium risk48 | —-0.059 |