Contractor dossier
535 projects on file, including joint ventures this contractor is part of.
Total projects
535
Total budget
₱17.2B
Average progress
97.1%
Completion rate
82.8%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
21
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 524 | ₱16.7B | 45.4 | 20 | 97.2% |
| Negros Island Region | 7 | ₱325.2M | 52.5 | 0 | 94.0% |
| Region VII | 4 | ₱150.5M | 46.5 | 1 | 97.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 196 | ₱7.8B | 48.3 | 3 | 96.6% |
| Buildings and Facilities | 119 | ₱1.5B | 34.9 | 1 | 98.6% |
| Flood Control and Drainage | 106 | ₱4.2B | 48.4 | 0 | 99.2% |
| Water Provision and Storage | 41 | ₱604.7M | 30.7 | 0 | 100.0% |
| Bridges | 40 | ₱944.6M | 40.3 | 2 | 98.7% |
| OTHER | 27 | ₱1.6B | 79.4 | 13 | 84.9% |
| GAA 2025 OO-2 | 4 | ₱457M | 93.6 | 0 | 92.0% |
| GAA 2025 SSP | 2 | ₱39.5M | 95.6 | 2 | 41.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 25IF0010CONSTRUCTION OF LEONDONI FLOOD CONTROL STRUCTURE, BARANGAY LEONDONI, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0009CONSTRUCTION OF SANTO NIÑO FLOOD CONTROL STRUCTURE, BARANGAY SANTO NIÑO, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0025CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱129M | 78% | High risk93 | —-0.002 |
| 25IG0031CONSTRUCTION OF MACAHILA FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, MACAHILA RIVER BASIN, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱136M | 92% | High risk93 | —-0.002 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 18IE0082CONSTRUCTION OF CALUBIAN-JUBAY-DAJA ROAD INCLUDING BRIDGES, CALUBIAN AND SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱160.2M | 100% | High risk83 | —-0.015 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 18IE0070NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT TERTIARY ROADS, TABANGO-CATMON-LA FORTUNA-MANLAWAAN-GIMARCO RD., K1036+800 - K1038+000 TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.6M | 100% | High risk82 | —-0.025 |
| 18IE0069NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0984+(-300)-K0984+766, K0984+838-K0985+505 LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱92.6M | 100% | High risk82 | —-0.027 |
| 23IF0065CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ORMOC CITY DIVERSION ROAD (NAUNGAN - LINAO - ALEGRIA - POBLACION), OMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱105.5M | 100% | High risk82 | —-0.019 |
| 24I00168FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 3), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 96% | High risk82 | Flagged0.000 |
| 24I00167FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 2), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 97% | High risk82 | —-0.001 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 18IE0072NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS, CALUBIAN JCT-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1011+952 - K1013+700 SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.7M | 100% | High risk81 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 22IF0101CONSTRUCTION OF PALOMPON LEYTE PORT | Region VIII | Leyte 4th DEO | On-Going | ₱19.5M | 0% | Medium risk53 | Flagged0.020 |
| 24IF0123REPAIR/REHABILITATION/IMPROVEMENT OF EXISTING CROSS DRAIN & DRAINAGE SYSTEM STRUCTURE ALONG PALO - CARIGARA - ORMOC ROAD - K0988+588 - K0989+073 | Region VIII | Leyte 4th DEO | On-Going | ₱19.2M | 0% | High risk78 | Flagged0.020 |
| 22IE0023ACCESS ROAD LEADING TO SILAD PORT, VILLABA, LEYTE (NEW ROUTE) VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱47.8M | 84% | High risk80 | Flagged0.017 |
| 22IE0041REHABILITATION OF ROAD ALONG RAILES-ENAGE-ANISLAGAN-CASIONGAN (CALUBIAN) VIA SITIO AIRPORT-SITIO CROSSING-SITIO LIMITE (DAJA DAKU) AND SITIO CROSSING-CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱48M | 77% | High risk80 | Flagged0.017 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 17IE0062OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1005+(-346)-K1005+644; K1005+662-K1006+429; K1006+450-K1008+074; K1008+089-K1008+574; K1008+713-K1010+857; K1015+000-K1016+595; K1016+610-K1017+560; K | Region VIII | Leyte 3rd DEO | On-Going | ₱91.6M | 100% | High risk60 | Flagged0.015 |
| 25IE0059CONCRETING OF BRGY. VILLAHERMOSA TO BRGY. GARRIDO FMR, BRGY. VILLAHERMOSA AND BRGY. GARRIDO, CALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱14.9M | 30% | Medium risk52 | Flagged0.010 |
| 22IE0048CONSTRUCTION OF CALUBIAN-JUBAY-DAJA RD. (MISSING GAP), CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱38.4M | 100% | High risk77 | Flagged0.009 |
| 25IF0088CONCRETING OF BRGY. MALAZARTE - BRGY. CAMBADBAD FMR, BRGY. MALAZARTE AND BRGY. CAMBADBAD, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱47.8M | 59% | Medium risk55 | Flagged0.007 |
| 23H00124CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GARING-PANAS ROAD, PHASE II, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱72.3M | 91% | High risk68 | Flagged0.003 |
| 21I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES - CALAGUISE BR. ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., BRGY. CALAGUISE, LEYTE, LEYTE | Region VIII | Region VIII | On-Going | ₱45.8M | 93% | Medium risk50 | Flagged0.002 |
| 22I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES, CALAGUISE BR. (B00093LT) ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., LEYTE 3RD LD | Region VIII | Region VIII | On-Going | ₱28.9M | 67% | Medium risk50 | Flagged0.002 |
| 25IF0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), LAKE DANAO - GAAS - SITIO MAGLAHOG - QUEZON JR. ROAD LEADING TO LAKE DANAO AND LAKE KASUDSURAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱32.7M | 74% | High risk78 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 401 | 18IE0031CONSTRUCTION OF FLOOD CONTROL ALONG HAMINDANGON RIVER ALONG VILLABA-PALOMPON ROAD VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.058 |
| 402 | 20IG0074CONSTRUCTION OF FMR, BRGY. CAMPINA-BRGY. TEJERO, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.041 |
| 403 | 18IE0105CONSTRUCTION OF CLASSROOMS (1-UNIT, 3 STY-6CL), VILLABA NCHS, VILLABA , LEYTEVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱14.8M | 100% | Medium risk43 | —-0.041 |
| 404 | 19I00149REPAIR/RESTORATION OF ORMOC - LAKE IMELDA ROAD, K1012+(-741) - K1012+(-300), ORMCO CITY | Region VIII | Region VIII | Completed | ₱5.9M | 100% | Medium risk43 | —-0.040 |
| 405 | 18IG0082CONCRETING OF BRGY. GUINSANGAAN FMR, BRGY. GUINSANGAAN, INOPACAN, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱6M | 100% | Medium risk42 | —-0.042 |
| 406 | 19IE0135CONCRETING OF BRGY. CAPIÑAHAN-BRGY. CABUNGAAN FMR, BRGY. CAPIÑAHAN AND BRGY. CABUNGAAN, SAN ISIDRO, LEYTESAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱4.8M | 100% | Medium risk42 | —-0.041 |
| 407 | 18IE0093CONCRETING OF BRGY. PARIL, BRGY. MATUNGAO FMR, BRGY. PARIL & BRGY. MATUNGAO, SAN ISIDRO, LEYTESAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱4.8M | 100% | Medium risk42 | —-0.032 |
| 408 | 18IG0084CONCRETING OF BRGY. BAGONG LIPUNAN (SITIO TAGAYTAY) - BRGY. BUNG-AW FMR, BRGY. BAGONG LIPUNAN AND BRGY. BUNG-AW, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.043 |
| 409 | 18IE0103CONSTRUCTION OF CLASSROOMS (1-UNIT, 2 STY-6CL), LEYTE NHS, LEYTE, LEYTELEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱12.6M | 100% | Medium risk42 | —-0.041 |
| 410 | 18IF0039CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PALOMPON - ISABEL - MERIDA - ORMOC RD, K1088+600 - K1088+650, K1089+000 - K1089+100 | Region VIII | Leyte 4th DEO | Completed | ₱4.7M | 100% | Medium risk41 | —-0.095 |
| 411 | 18IE0059REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE CAMPOKPOK BR. (B00144LT), ALONG CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON RD.BRGY. CAMPOKPOK, TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱4.7M | 100% | Medium risk41 | —-0.059 |
| 412 | 18IE0008CONSTRUCTION OF FLOOD CONTROL CATMON RIVERBRGY. CATMON. TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱4.7M | 100% | Medium risk41 | —-0.079 |
| 413 | 18IE0038CONSTRUCTION OF FLOOD CONTROL HINABUYAN RIVER, BRGY. HINABUYAN, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱4.7M | 100% | Medium risk40 | —-0.079 |
| 414 | 19IE0101CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. HERRERA, CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱2M | 100% | Low risk27 | —-0.098 |
| 415 | 18IE0083CONSTRUCTION OF A MULTI-PURPOSE BUILDING, SAN ISIDRO CENTRAL SCHOOL, SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱2.4M | 100% | Low risk25 | —-0.078 |
| 416 | 18IE0077CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), HAD. MARIA ELEMENTARY SCHOOL, BRGY. HAD. MARIA, SAN ISIDRO, LEYTE, SANGGABON ELEMENTARY SCHOOL, BRGY. BIASONG, SAN ISIDRO, LEYTE, SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱380K | 100% | Low risk25 | —-0.061 |
| 417 | 19IE0118CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. SITIO BUHO TUGAS, TABANGO, LEYTETABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱2.9M | 100% | Low risk24 | —-0.098 |
| 418 | 17IE0020CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - TERTIARY, ABIJAO BR. (B00160LT) ALONG CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROADBRGY. ABIJAO, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱2.9M | 100% | Low risk24 | —-0.032 |
| 419 | 17IG0040REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, PINUCAWAN BR. (B00510LT) ALONG LA PAZ-JAVIER-BITO RD.,JAVIER, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱3.3M | 100% | Low risk24 | —-0.033 |
| 420 | 21IF0013RETROFITTING/ STRENGTHENING OF BRIDGE, MARAO BRIDGE (B00201LT) ALONG LIBUNGAO-MATAG-OB-PALOMPON RD | Region VIII | Leyte 4th DEO | Completed | ₱4.7M | 100% | Low risk24 | —-0.060 |
| 421 | 21IF0018RETROFITTING/ STRENGTHENING OF BRIDGE, ABISANG BRIDGE (B00202LT) ALONG LIBUNGAO-MATAG-OB-PALOMPON RD | Region VIII | Leyte 4th DEO | Completed | ₱4.7M | 100% | Low risk24 | —-0.060 |
| 422 | 17IG0041REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BITO BR.(B00536LT) ALONG DAANG MAHARLIKA (LT) ,ABUYOG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱3.7M | 100% | Low risk24 | —-0.033 |
| 423 | 18IE0076CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), CATMON ELEMENTARY SCHOOL, BRGY. CATMON, TABANGO, LEYTE, INANGATAN ELEMENTARY SCHOOL, BRGY. INANGATAN, TABANGO, LEYTE, STA. ROSA ELEMENTARY SCHOOL, BRGY. STA. ROSA, TABANGO, LEYTE, TABANGO NORTH CENTRAL S | Region VIII | Leyte 3rd DEO | Completed | ₱1.1M | 100% | Low risk24 | —-0.060 |
| 424 | 19IF0077WATER SYSTEM LEVEL III,BRGY. PATAG, ORMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱2.8M | 100% | Low risk24 | —-0.062 |
| 425 | 18IF0043RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, AGOB-OB BRIDGE (B00197LT) ALONG LIBUNGAO - MATAG-OB - PALOMPON ROAD | Region VIII | Leyte 4th DEO | Completed | ₱4.7M | 100% | Low risk24 | —-0.059 |