Contractor dossier
535 projects on file, including joint ventures this contractor is part of.
Total projects
535
Total budget
₱17.2B
Average progress
97.1%
Completion rate
82.8%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
21
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 524 | ₱16.7B | 45.4 | 20 | 97.2% |
| Negros Island Region | 7 | ₱325.2M | 52.5 | 0 | 94.0% |
| Region VII | 4 | ₱150.5M | 46.5 | 1 | 97.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 196 | ₱7.8B | 48.3 | 3 | 96.6% |
| Buildings and Facilities | 119 | ₱1.5B | 34.9 | 1 | 98.6% |
| Flood Control and Drainage | 106 | ₱4.2B | 48.4 | 0 | 99.2% |
| Water Provision and Storage | 41 | ₱604.7M | 30.7 | 0 | 100.0% |
| Bridges | 40 | ₱944.6M | 40.3 | 2 | 98.7% |
| OTHER | 27 | ₱1.6B | 79.4 | 13 | 84.9% |
| GAA 2025 OO-2 | 4 | ₱457M | 93.6 | 0 | 92.0% |
| GAA 2025 SSP | 2 | ₱39.5M | 95.6 | 2 | 41.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 25IF0010CONSTRUCTION OF LEONDONI FLOOD CONTROL STRUCTURE, BARANGAY LEONDONI, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0009CONSTRUCTION OF SANTO NIÑO FLOOD CONTROL STRUCTURE, BARANGAY SANTO NIÑO, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0025CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱129M | 78% | High risk93 | —-0.002 |
| 25IG0031CONSTRUCTION OF MACAHILA FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, MACAHILA RIVER BASIN, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱136M | 92% | High risk93 | —-0.002 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 18IE0082CONSTRUCTION OF CALUBIAN-JUBAY-DAJA ROAD INCLUDING BRIDGES, CALUBIAN AND SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱160.2M | 100% | High risk83 | —-0.015 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 18IE0070NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT TERTIARY ROADS, TABANGO-CATMON-LA FORTUNA-MANLAWAAN-GIMARCO RD., K1036+800 - K1038+000 TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.6M | 100% | High risk82 | —-0.025 |
| 18IE0069NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0984+(-300)-K0984+766, K0984+838-K0985+505 LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱92.6M | 100% | High risk82 | —-0.027 |
| 23IF0065CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ORMOC CITY DIVERSION ROAD (NAUNGAN - LINAO - ALEGRIA - POBLACION), OMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱105.5M | 100% | High risk82 | —-0.019 |
| 24I00168FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 3), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 96% | High risk82 | Flagged0.000 |
| 24I00167FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 2), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 97% | High risk82 | —-0.001 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 18IE0072NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS, CALUBIAN JCT-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1011+952 - K1013+700 SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.7M | 100% | High risk81 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 22IF0101CONSTRUCTION OF PALOMPON LEYTE PORT | Region VIII | Leyte 4th DEO | On-Going | ₱19.5M | 0% | Medium risk53 | Flagged0.020 |
| 24IF0123REPAIR/REHABILITATION/IMPROVEMENT OF EXISTING CROSS DRAIN & DRAINAGE SYSTEM STRUCTURE ALONG PALO - CARIGARA - ORMOC ROAD - K0988+588 - K0989+073 | Region VIII | Leyte 4th DEO | On-Going | ₱19.2M | 0% | High risk78 | Flagged0.020 |
| 22IE0023ACCESS ROAD LEADING TO SILAD PORT, VILLABA, LEYTE (NEW ROUTE) VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱47.8M | 84% | High risk80 | Flagged0.017 |
| 22IE0041REHABILITATION OF ROAD ALONG RAILES-ENAGE-ANISLAGAN-CASIONGAN (CALUBIAN) VIA SITIO AIRPORT-SITIO CROSSING-SITIO LIMITE (DAJA DAKU) AND SITIO CROSSING-CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱48M | 77% | High risk80 | Flagged0.017 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 17IE0062OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1005+(-346)-K1005+644; K1005+662-K1006+429; K1006+450-K1008+074; K1008+089-K1008+574; K1008+713-K1010+857; K1015+000-K1016+595; K1016+610-K1017+560; K | Region VIII | Leyte 3rd DEO | On-Going | ₱91.6M | 100% | High risk60 | Flagged0.015 |
| 25IE0059CONCRETING OF BRGY. VILLAHERMOSA TO BRGY. GARRIDO FMR, BRGY. VILLAHERMOSA AND BRGY. GARRIDO, CALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱14.9M | 30% | Medium risk52 | Flagged0.010 |
| 22IE0048CONSTRUCTION OF CALUBIAN-JUBAY-DAJA RD. (MISSING GAP), CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱38.4M | 100% | High risk77 | Flagged0.009 |
| 25IF0088CONCRETING OF BRGY. MALAZARTE - BRGY. CAMBADBAD FMR, BRGY. MALAZARTE AND BRGY. CAMBADBAD, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱47.8M | 59% | Medium risk55 | Flagged0.007 |
| 23H00124CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GARING-PANAS ROAD, PHASE II, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱72.3M | 91% | High risk68 | Flagged0.003 |
| 21I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES - CALAGUISE BR. ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., BRGY. CALAGUISE, LEYTE, LEYTE | Region VIII | Region VIII | On-Going | ₱45.8M | 93% | Medium risk50 | Flagged0.002 |
| 22I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES, CALAGUISE BR. (B00093LT) ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., LEYTE 3RD LD | Region VIII | Region VIII | On-Going | ₱28.9M | 67% | Medium risk50 | Flagged0.002 |
| 25IF0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), LAKE DANAO - GAAS - SITIO MAGLAHOG - QUEZON JR. ROAD LEADING TO LAKE DANAO AND LAKE KASUDSURAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱32.7M | 74% | High risk78 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 476 | 18IE0041CONSTRUCTION OF MULTI-PURPOSE BUILDING, HINABUYAN, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk20 | —-0.098 |
| 477 | 18IE0013CONSTRUCTION OF MULTI-PURPOSE BUILDINGCAMPOKPOK, TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk20 | —-0.098 |
| 478 | 18IF0110CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) MATLANG NATIONAL HIGH SCHOOL, ISABEL, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk20 | —-0.058 |
| 479 | 18IE0040CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, ABIJAO, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk20 | —-0.099 |
| 480 | 18IF0107CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) SAN VICENTE DAYCARE CENTER, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk20 | —-0.059 |
| 481 | 18IE0014CONSTRUCTION OF MULTI-PURPOSE BUILDINGINANGATAN, TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk20 | —-0.098 |
| 482 | 18IF0111CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) ISABEL NATIONAL HIGH SCHOOL, ISABEL, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk20 | —-0.059 |
| 483 | 19IE0126CONSTRUCTION OF LOCAL ROAD, BRGY. SITIO COLONIA MANLAWAAN, TABANGO, LEYTETABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk20 | —-0.090 |
| 484 | 18IF0109CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) PALOMPON NATIONAL HIGH SCHOOL, PALOMPON, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk20 | —-0.058 |
| 485 | 18IF0108CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) PALOMPON NORTH CENTRAL SCHOOL, PALOMPON, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk20 | —-0.058 |
| 486 | 19IF0114CONSTRUCTION/REHABILITATION OF WATER SUPPLY/RAIN WATER COLLECTORS SABANG ELEMENTARY SCHOOL, BRGY. SABANG, PALOMPON, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱197.9K | 100% | Low risk20 | —-0.059 |
| 487 | 18IE0045REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE TAGBUBUNGA BR. (B00162LT), ALONG CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON BRGY. TAGBUBUNGA, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk20 | —-0.059 |
| 488 | 18IE0011CONSTRUCTION OF MULTI-PURPOSE BUILDINGSAN VICENTE, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk20 | —-0.098 |
| 489 | 18IF0102CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) LAMANOC ELEMENTARY SCHOOL, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱190.1K | 100% | Low risk19 | —-0.058 |
| 490 | 18IF0096CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RCWS) SAN ANTONIO ELEMENTARY SCHOOL, ORMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk19 | —-0.058 |
| 491 | 18IF0095CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RCWS) MACABUG ELEMENTARY SCHOOL, ORMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk19 | —-0.058 |
| 492 | 18IF0103CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) LIBAS ELEMENTARY SCHOOL, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk19 | —-0.059 |
| 493 | 18IF0097CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) COGON CENTRAL SCHOOL, ORMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱190K | 100% | Low risk19 | —-0.058 |
| 494 | 18IE0012CONSTRUCTION OF MULTI-PURPOSE BUILDINGJALAS, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.099 |
| 495 | 20IE0066CONSTRUCTION OF FOOT BRIDGE, PUROK 1 TO PUROK 2, BRGY. JALAS, VILLABA, LEYTEVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.059 |
| 496 | 18IF0063CONSTRUCTION OF CONCRETE ROAD - ACCESS ROADS LEADING TO PALOMPON PORT, PALOMPON, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱939.4K | 100% | Low risk19 | —-0.089 |
| 497 | 18IE0018CONSTRUCTION OF MULTI-PURPOSE BUILDINGBALITE, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.098 |
| 498 | 18IE0020CONSTRUCTION OF MULTI-PURPOSE BUILDINGTABUNOK, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.098 |
| 499 | 18IE0053CONSTRUCTION OF ROAD, POBLACION, LEYTE, LEYTELEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.090 |
| 500 | 18IG0044CONSTRUCTION OF DRAINAGE CANAL/RIVER CONTROL,BRGY.DEL LOS SANTOS, INOPACAN, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱950K | 100% | Low risk19 | —-0.076 |