Contractor dossier
535 projects on file, including joint ventures this contractor is part of.
Total projects
535
Total budget
₱17.2B
Average progress
97.1%
Completion rate
82.8%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
21
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 524 | ₱16.7B | 45.4 | 20 | 97.2% |
| Negros Island Region | 7 | ₱325.2M | 52.5 | 0 | 94.0% |
| Region VII | 4 | ₱150.5M | 46.5 | 1 | 97.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 196 | ₱7.8B | 48.3 | 3 | 96.6% |
| Buildings and Facilities | 119 | ₱1.5B | 34.9 | 1 | 98.6% |
| Flood Control and Drainage | 106 | ₱4.2B | 48.4 | 0 | 99.2% |
| Water Provision and Storage | 41 | ₱604.7M | 30.7 | 0 | 100.0% |
| Bridges | 40 | ₱944.6M | 40.3 | 2 | 98.7% |
| OTHER | 27 | ₱1.6B | 79.4 | 13 | 84.9% |
| GAA 2025 OO-2 | 4 | ₱457M | 93.6 | 0 | 92.0% |
| GAA 2025 SSP | 2 | ₱39.5M | 95.6 | 2 | 41.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 25IF0010CONSTRUCTION OF LEONDONI FLOOD CONTROL STRUCTURE, BARANGAY LEONDONI, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0009CONSTRUCTION OF SANTO NIÑO FLOOD CONTROL STRUCTURE, BARANGAY SANTO NIÑO, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0025CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱129M | 78% | High risk93 | —-0.002 |
| 25IG0031CONSTRUCTION OF MACAHILA FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, MACAHILA RIVER BASIN, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱136M | 92% | High risk93 | —-0.002 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 18IE0082CONSTRUCTION OF CALUBIAN-JUBAY-DAJA ROAD INCLUDING BRIDGES, CALUBIAN AND SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱160.2M | 100% | High risk83 | —-0.015 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 18IE0070NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT TERTIARY ROADS, TABANGO-CATMON-LA FORTUNA-MANLAWAAN-GIMARCO RD., K1036+800 - K1038+000 TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.6M | 100% | High risk82 | —-0.025 |
| 18IE0069NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0984+(-300)-K0984+766, K0984+838-K0985+505 LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱92.6M | 100% | High risk82 | —-0.027 |
| 23IF0065CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ORMOC CITY DIVERSION ROAD (NAUNGAN - LINAO - ALEGRIA - POBLACION), OMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱105.5M | 100% | High risk82 | —-0.019 |
| 24I00168FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 3), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 96% | High risk82 | Flagged0.000 |
| 24I00167FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 2), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 97% | High risk82 | —-0.001 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 18IE0072NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS, CALUBIAN JCT-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1011+952 - K1013+700 SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.7M | 100% | High risk81 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 22IF0101CONSTRUCTION OF PALOMPON LEYTE PORT | Region VIII | Leyte 4th DEO | On-Going | ₱19.5M | 0% | Medium risk53 | Flagged0.020 |
| 24IF0123REPAIR/REHABILITATION/IMPROVEMENT OF EXISTING CROSS DRAIN & DRAINAGE SYSTEM STRUCTURE ALONG PALO - CARIGARA - ORMOC ROAD - K0988+588 - K0989+073 | Region VIII | Leyte 4th DEO | On-Going | ₱19.2M | 0% | High risk78 | Flagged0.020 |
| 22IE0023ACCESS ROAD LEADING TO SILAD PORT, VILLABA, LEYTE (NEW ROUTE) VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱47.8M | 84% | High risk80 | Flagged0.017 |
| 22IE0041REHABILITATION OF ROAD ALONG RAILES-ENAGE-ANISLAGAN-CASIONGAN (CALUBIAN) VIA SITIO AIRPORT-SITIO CROSSING-SITIO LIMITE (DAJA DAKU) AND SITIO CROSSING-CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱48M | 77% | High risk80 | Flagged0.017 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 17IE0062OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1005+(-346)-K1005+644; K1005+662-K1006+429; K1006+450-K1008+074; K1008+089-K1008+574; K1008+713-K1010+857; K1015+000-K1016+595; K1016+610-K1017+560; K | Region VIII | Leyte 3rd DEO | On-Going | ₱91.6M | 100% | High risk60 | Flagged0.015 |
| 25IE0059CONCRETING OF BRGY. VILLAHERMOSA TO BRGY. GARRIDO FMR, BRGY. VILLAHERMOSA AND BRGY. GARRIDO, CALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱14.9M | 30% | Medium risk52 | Flagged0.010 |
| 22IE0048CONSTRUCTION OF CALUBIAN-JUBAY-DAJA RD. (MISSING GAP), CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱38.4M | 100% | High risk77 | Flagged0.009 |
| 25IF0088CONCRETING OF BRGY. MALAZARTE - BRGY. CAMBADBAD FMR, BRGY. MALAZARTE AND BRGY. CAMBADBAD, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱47.8M | 59% | Medium risk55 | Flagged0.007 |
| 23H00124CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GARING-PANAS ROAD, PHASE II, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱72.3M | 91% | High risk68 | Flagged0.003 |
| 21I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES - CALAGUISE BR. ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., BRGY. CALAGUISE, LEYTE, LEYTE | Region VIII | Region VIII | On-Going | ₱45.8M | 93% | Medium risk50 | Flagged0.002 |
| 22I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES, CALAGUISE BR. (B00093LT) ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., LEYTE 3RD LD | Region VIII | Region VIII | On-Going | ₱28.9M | 67% | Medium risk50 | Flagged0.002 |
| 25IF0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), LAKE DANAO - GAAS - SITIO MAGLAHOG - QUEZON JR. ROAD LEADING TO LAKE DANAO AND LAKE KASUDSURAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱32.7M | 74% | High risk78 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23IE0078CONSTRUCTION OF MUNICIPAL BUILDING (PHASE 2), VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱48.5M | 100% | Medium risk59 | —-0.095 |
| 77 | 23IE0066CONSTRUCTION OF PUP-CAMPUS, BRGY. CALAGUISE, LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱48.5M | 83% | Medium risk59 | —-0.040 |
| 78 | 23IF0056CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, LAKE DANAO - GAAS - SITIO MAGLAHOG - QUEZON JR. ROAD LEADING TO LAKE DANAO AND LAKE KASUDSURAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱114.6M | 100% | Medium risk59 | —-0.076 |
| 79 | 22I00044CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), LAKE DANAO AND LAKE KASUDSURAN, ORMOC CITY, LEYTE | Region VIII | Region VIII | Completed | ₱112.8M | 100% | Medium risk59 | —-0.081 |
| 80 | 24IF0013ROAD WIDENING - TERTIARY ROADS - LIBUNGAO-MATG-OB-PALOMPON ROAD, K1005+000 - K1006+990, K1006+1013 - K1008+000 | Region VIII | Leyte 4th DEO | Completed | ₱101.3M | 100% | Medium risk59 | —-0.083 |
| 81 | 23IG0132EMERGENCY REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROAD - TACLOBAN - BAYBAY SOUTH ROAD K0990+135 - K0990+355 | Region VIII | Leyte 5th DEO | Completed | ₱109.2M | 100% | Medium risk59 | —-0.081 |
| 82 | 20I00002NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAASIN CITY COASTAL BY-PASS ROAD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱115.8M | 100% | Medium risk59 | —-0.077 |
| 83 | 25IF0067ROAD WIDENING - SECONDARY ROADS - PALOMPON-ISABEL-MERIDA-ORMOC RD - K1086+722-K1088+200 | Region VIII | Leyte 4th DEO | On-Going | ₱105.6M | 67% | Medium risk58 | —-0.042 |
| 84 | 19I00134REPAIR AND RESTORATION OF SLOPE PROTECTION AND DAMAGED PCCP ALONG LIBUNGAO - MATAG-OB - PALOMPON ROAD, K1011+280 - K1021+820, MATAG-OB, LEYTE | Region VIII | Region VIII | Completed | ₱58.3M | 100% | Medium risk58 | —-0.032 |
| 85 | 22IF0080RECONSTRUCTION OF CONCRETE PAVEMENT -PALOMPON - ISABEL - MERIDA - ORMOC ROAD - K1092+620-K1093+000;K1095+401-K1096+000;K1097+000-K1098+000;K1098+000-K1098+931;K1103+426-K1104+000;K1104+000-K1104+842;K1105+000-K1105+956;K1106+000-K1106+547 | Region VIII | Leyte 4th DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.085 |
| 86 | 24IF0112CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ALEGRIA, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.4M | 100% | Medium risk58 | —-0.058 |
| 87 | 24IF0113CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. IPIL, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.4M | 100% | Medium risk58 | —-0.058 |
| 88 | 25IF0092CONSTRUCTION OF SUMANGGA-BANTIGUE ROAD, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱46.8M | 1% | Medium risk58 | —-0.002 |
| 89 | 23HL0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA 11239: INSTALLATION OF STREETLIGHTS ALONG DUMAGUETE SOUTH ROAD K0100 + 000 - K0012 + 483 MODIFIED TO CONVERGENCE AND SPECIAL SUPPORT PROGRAM: | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.080 |
| 90 | 21IF0093CONSTRUCTION OF VALENCIA MARKET PHASE I, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱48.5M | 100% | Medium risk58 | —-0.095 |
| 91 | 17IE0049REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1006+255-K1006+325, K1006+360-K1006+396, CALUBIAN, TABANGO, SAN ISIDRO & VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱27.9M | 100% | Medium risk56 | —-0.061 |
| 92 | 23IE0030WIDENING OF PERMANENT BRIDGES, ELIZABETH BR. (B00092LT), ALONG SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0984+771 K0984+833, BRGY. SALOG, LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱70.5M | 100% | Medium risk56 | —-0.055 |
| 93 | 20IE0072CONSTRUCTION OF PROVINCIAL MOBILE FORCE BATTALION (PMFC)CALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱43.1M | 100% | Medium risk56 | —-0.096 |
| 94 | 17IF0030NETWORK DEVELOPMENT - OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - PRIMARY ALONG PALO - CARIGARA - ORMOC ROAD, S00132LT, K0994+345-K0995+004,K0984+401-K0984+727,K0986+114-K0986+448 | Region VIII | Leyte 4th DEO | Completed | ₱38.8M | 100% | Medium risk56 | —-0.061 |
| 95 | 18IG0001ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS-TACLOBAN-BAYBAY-SOUTH RD K0988+655 TO K0988+795, K0991+345 TO 0991+420, K0993+000 TO K0993+200,K0997+900 TO K0998+100, K0998+130 TO | Region VIII | Leyte 5th DEO | Completed | ₱49M | 100% | Medium risk56 | —-0.060 |
| 96 | 17IE0048OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE TERTIARY, ALONG TABING-KAWAYAN-STA. ROSA-LAWIS-TABANGO ROAD, K1025+(-799)-K1025+(-651), K1025+(-537)-K1025+165, K1027+893-K1028+053, K1028+066-K1028+804, K1028+815-K1029+017, TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱37.1M | 100% | Medium risk56 | —-0.061 |
| 97 | 22I00081NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CABGAN - CAPIÑAHAN DIVERSION ROAD, LEYTE 3RD LD | Region VIII | Region VIII | Completed | ₱56.5M | 100% | Medium risk56 | —-0.085 |
| 98 | 24IF0044REHABILITATION OF SPILLWAY, BARANGAY ANTIPOLO, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱9.2M | 100% | Medium risk56 | —-0.064 |
| 99 | 17IE0038OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY, ALONG SAN ISIDRO-DAJA ROAD, K1020+000-K1020+222, K1020+235-K1020+942, K1020+974-K1025+614, K1025+632-K1026+000,SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱45.6M | 100% | Medium risk56 | —-0.060 |
| 100 | 17IE0046ROAD UPGRADING (UNPAVED TO PAVED)-TERTIARY, ALONG TABING-KAWAYAN-STA. ROSA-LAWIS-TABANGO ROAD, K1031+000-K1031+839, K1031+960-K1032+102, TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱39.6M | 100% | Medium risk56 | —-0.061 |