Contractor dossier
535 projects on file, including joint ventures this contractor is part of.
Total projects
535
Total budget
₱17.2B
Average progress
97.1%
Completion rate
82.8%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
21
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 524 | ₱16.7B | 45.4 | 20 | 97.2% |
| Negros Island Region | 7 | ₱325.2M | 52.5 | 0 | 94.0% |
| Region VII | 4 | ₱150.5M | 46.5 | 1 | 97.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 196 | ₱7.8B | 48.3 | 3 | 96.6% |
| Buildings and Facilities | 119 | ₱1.5B | 34.9 | 1 | 98.6% |
| Flood Control and Drainage | 106 | ₱4.2B | 48.4 | 0 | 99.2% |
| Water Provision and Storage | 41 | ₱604.7M | 30.7 | 0 | 100.0% |
| Bridges | 40 | ₱944.6M | 40.3 | 2 | 98.7% |
| OTHER | 27 | ₱1.6B | 79.4 | 13 | 84.9% |
| GAA 2025 OO-2 | 4 | ₱457M | 93.6 | 0 | 92.0% |
| GAA 2025 SSP | 2 | ₱39.5M | 95.6 | 2 | 41.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 25IF0010CONSTRUCTION OF LEONDONI FLOOD CONTROL STRUCTURE, BARANGAY LEONDONI, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0009CONSTRUCTION OF SANTO NIÑO FLOOD CONTROL STRUCTURE, BARANGAY SANTO NIÑO, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96M | 99% | High risk94 | —-0.013 |
| 25IF0025CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱129M | 78% | High risk93 | —-0.002 |
| 25IG0031CONSTRUCTION OF MACAHILA FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, MACAHILA RIVER BASIN, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱136M | 92% | High risk93 | —-0.002 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 18IE0082CONSTRUCTION OF CALUBIAN-JUBAY-DAJA ROAD INCLUDING BRIDGES, CALUBIAN AND SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱160.2M | 100% | High risk83 | —-0.015 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 18IE0070NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT TERTIARY ROADS, TABANGO-CATMON-LA FORTUNA-MANLAWAAN-GIMARCO RD., K1036+800 - K1038+000 TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.6M | 100% | High risk82 | —-0.025 |
| 18IE0069NETWORK DEVELOPMENT PROGRAM OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0984+(-300)-K0984+766, K0984+838-K0985+505 LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱92.6M | 100% | High risk82 | —-0.027 |
| 23IF0065CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ORMOC CITY DIVERSION ROAD (NAUNGAN - LINAO - ALEGRIA - POBLACION), OMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱105.5M | 100% | High risk82 | —-0.019 |
| 24I00168FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 3), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 96% | High risk82 | Flagged0.000 |
| 24I00167FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL (BARANGAY ZONE 5 SECTION SEGMENT 2), SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 97% | High risk82 | —-0.001 |
| 20IF0011WIDENING OF PERMANENT BRIDGES, BACAN BR. (B00582LT) ALONG ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱69.6M | 100% | High risk81 | —-0.035 |
| 18IE0072NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS, CALUBIAN JCT-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1011+952 - K1013+700 SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱91.7M | 100% | High risk81 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00415CONSTRUCTION OF INNOVATION INCUBATION CENTER BUILDING - PALOMPON INSTITUTE OF TECHNOLOGY | Region VIII | Region VIII | On-Going | ₱34.6M | 11% | High risk90 | Flagged0.067 |
| 25IF0077CONCRETING OF BRGY. LIBAS - BRGY. CALUNASAN FMR, BRGY. LIBAS AND BRGY. CALUNASAN, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 54% | High risk91 | Flagged0.058 |
| 25IF0078CONCRETING OF BRGY. DOMONAR - BRGY. CAMBACBAC FMR, BRGY. DOMONAR, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.7M | 75% | High risk91 | Flagged0.050 |
| 25IF0084CONCRETING OF BRGY. NASUNOGAN TO BRGY. AIRPORT AND LILO-AN FMR (PHASE I), BRGY. NASUNOGAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱14.9M | 99% | High risk90 | Flagged0.037 |
| 25IF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF ORMOC, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱9.8M | 37% | High risk95 | Flagged0.023 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 25IF0098CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱29.7M | 46% | High risk96 | Flagged0.021 |
| 22IF0101CONSTRUCTION OF PALOMPON LEYTE PORT | Region VIII | Leyte 4th DEO | On-Going | ₱19.5M | 0% | Medium risk53 | Flagged0.020 |
| 24IF0123REPAIR/REHABILITATION/IMPROVEMENT OF EXISTING CROSS DRAIN & DRAINAGE SYSTEM STRUCTURE ALONG PALO - CARIGARA - ORMOC ROAD - K0988+588 - K0989+073 | Region VIII | Leyte 4th DEO | On-Going | ₱19.2M | 0% | High risk78 | Flagged0.020 |
| 22IE0023ACCESS ROAD LEADING TO SILAD PORT, VILLABA, LEYTE (NEW ROUTE) VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱47.8M | 84% | High risk80 | Flagged0.017 |
| 22IE0041REHABILITATION OF ROAD ALONG RAILES-ENAGE-ANISLAGAN-CASIONGAN (CALUBIAN) VIA SITIO AIRPORT-SITIO CROSSING-SITIO LIMITE (DAJA DAKU) AND SITIO CROSSING-CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱48M | 77% | High risk80 | Flagged0.017 |
| 24I00370BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO TAB-OK, BARANGAY NALIBUNAN, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱69.2M | 36% | High risk82 | Flagged0.015 |
| 17IE0062OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1005+(-346)-K1005+644; K1005+662-K1006+429; K1006+450-K1008+074; K1008+089-K1008+574; K1008+713-K1010+857; K1015+000-K1016+595; K1016+610-K1017+560; K | Region VIII | Leyte 3rd DEO | On-Going | ₱91.6M | 100% | High risk60 | Flagged0.015 |
| 25IE0059CONCRETING OF BRGY. VILLAHERMOSA TO BRGY. GARRIDO FMR, BRGY. VILLAHERMOSA AND BRGY. GARRIDO, CALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱14.9M | 30% | Medium risk52 | Flagged0.010 |
| 22IE0048CONSTRUCTION OF CALUBIAN-JUBAY-DAJA RD. (MISSING GAP), CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱38.4M | 100% | High risk77 | Flagged0.009 |
| 25IF0088CONCRETING OF BRGY. MALAZARTE - BRGY. CAMBADBAD FMR, BRGY. MALAZARTE AND BRGY. CAMBADBAD, MATAG-OB, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱47.8M | 59% | Medium risk55 | Flagged0.007 |
| 23H00124CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GARING-PANAS ROAD, PHASE II, CONSOLACION, CEBU | Region VII | Region VII | On-Going | ₱72.3M | 91% | High risk68 | Flagged0.003 |
| 21I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES - CALAGUISE BR. ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., BRGY. CALAGUISE, LEYTE, LEYTE | Region VIII | Region VIII | On-Going | ₱45.8M | 93% | Medium risk50 | Flagged0.002 |
| 22I00028BRIDGE - CONSTRUCTION OF NEW BRIDGES, CALAGUISE BR. (B00093LT) ALONG SAMBULAWAN JCT. - CALAGUISE - CALUBIAN RD., LEYTE 3RD LD | Region VIII | Region VIII | On-Going | ₱28.9M | 67% | Medium risk50 | Flagged0.002 |
| 25IF0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), LAKE DANAO - GAAS - SITIO MAGLAHOG - QUEZON JR. ROAD LEADING TO LAKE DANAO AND LAKE KASUDSURAN, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱32.7M | 74% | High risk78 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 22IE0064CONSTRUCTION OF TIDE PROTECTION EMBANKMENT, SUBA, VILLABA, LEYTEVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱48.8M | 100% | Medium risk49 | —-0.083 |
| 202 | 23IE0065RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES BUGNAY BR. 1 (B00122LT) ALONG CALUBIAN JCT-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD | Region VIII | Leyte 3rd DEO | Completed | ₱20.1M | 100% | Medium risk49 | —-0.061 |
| 203 | 22IE0063CONSTRUCTION OF TIDE PROTECTION EMBANKMENT. SILAD PORT (RIGHT SIDE), BRGY. SILAD, VILLABA, LEYTEVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱48M | 100% | Medium risk49 | —-0.082 |
| 204 | 22IE0067CONSTRUCTION OF TIDE PROTECTION EMBANKMENT, BRGY. POBLACION DEL NORTE, VILLABA, LEYTEVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱48M | 100% | Medium risk49 | —-0.082 |
| 205 | 20IE0051ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K1001+340-K1001+470LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱37.8M | 100% | Medium risk49 | —-0.096 |
| 206 | 19IE0043NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, LEMON-LEYTE-BILIRAN ROAD, K0977+990-K0979+050LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱40.9M | 100% | Medium risk49 | —-0.096 |
| 207 | 22IE0009NETWORK DEVELOPMENT PROGRAM ROAD WIDENING - SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0988+401 - K0989+000LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱28.5M | 100% | Medium risk49 | —-0.036 |
| 208 | 22IE0010NETWORK DEVELOPMENT ROAD WIDENING - SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0990+000 - K0990+434, LEYTE, LEYTE LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱28.7M | 100% | Medium risk49 | —-0.096 |
| 209 | 23IE0020REPLACEMENT OF PERMANENT WEAK BR. HAMINDANGON BR. (B00154LT), ALONG CALUBIAN JCT.-SN ISIDRO-TABANGO-VILLABA-PALOMPON RD., K1045+277 K1045+295.80POBLACION DEL NORTE, VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱28.9M | 100% | Medium risk49 | —-0.061 |
| 210 | 19IG0078CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAHAPLAG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱7.6M | 100% | Medium risk49 | —-0.095 |
| 211 | 20IE0058NETWORK DEVELOPMENT PROGRAM ROAD WIDENING-TERTIARY ROAD, SAN ISIDRO-DAJA RD., K1018+000-K1018+770, SAN ISIDRO, LEYTESAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱28.2M | 100% | Medium risk49 | —-0.096 |
| 212 | 20IE0078REHABILITATION, IMPROVEMENT AND UPGRADING OF JPR DAJA DAKU-SITIO LIMITE ROAD SECTION, BRGY. DAJA DAKU, SAN ISIDRO, LEYTESAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱18.9M | 100% | Medium risk49 | —-0.097 |
| 213 | 18IE0065ASSET PRESERVATION, REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, TERTIARY ROADS, CABUNGAAN-TABUNOK-CONSUEGRA RD., S00126LT AND S00125LT, K1021+111-K1021+168, K1021+523-K1021+554, K1021+576-K1021+610, K1021+6 | Region VIII | Leyte 3rd DEO | Completed | ₱37M | 100% | Medium risk49 | —-0.095 |
| 214 | 19IE0032NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0985+505-K0986+300LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱46.5M | 100% | Medium risk49 | —-0.096 |
| 215 | 25IE0026CONSTRUCTION OF JNR SONLOGON-TABAYLA-JNR CANTUR-AW ROAD, TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱14.6M | 100% | Medium risk49 | —-0.064 |
| 216 | 20IE0037NETWORK DEVELOPMENT PROGRAM ROAD WIDENING - SECONDARY ROADS, SAMBULAWAN JCT.-CALAGUISE-CALUBIAN RD., K0986+300 - K0986+1000LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱37.8M | 100% | Medium risk49 | —-0.096 |
| 217 | 22IE0019CONSTRUCTION OF CONCRETE BRIDGE-HIBULANGAN BR. I, ALONG STO. ROSARIO-VILLABA RD.VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱29.9M | 100% | Medium risk49 | —-0.062 |
| 218 | 18IM0024RECONSTRUCTION FROM PAVED TO CONCRETE-ACCESS ROAD LEADING TO BALUGO FALLS, BARANGAY 104 (SALVACION), TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱14.7M | 100% | Medium risk49 | —-0.095 |
| 219 | 19IE0122REPAIR/REHABILITATION OF DAMAGED PAVED ROADS ALONG CALUBIAN-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, K1025+100 - K1025+150, K1037+100-K1037+150, AND TABING-KAWAYAN-STA. ROSA-LAWIS-TABANGO ROAD, K1033+220-K1033+282, TABANGO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱18.9M | 100% | Medium risk49 | —-0.096 |
| 220 | 18IE0058REHABILITATION/RECONSTRUCTION OF ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY, LEMON-LEYTE-BILIRAN ROAD, K1002+250 K1002+340, K1003+600 K1003+820LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱16.7M | 100% | Medium risk49 | —-0.096 |
| 221 | 19IG0108CONSTRUCTION OF TWO STOREY, EIGHT CLASSROOMS, PONTOD ELEMENTARY SCHOOL, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱21.9M | 100% | Medium risk49 | —-0.052 |
| 222 | 25IE0033CONCRETING OF JNR CONSUEGRA-TAPOL ROAD, LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱19.6M | 100% | Medium risk49 | —-0.064 |
| 223 | 24I00166FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PANALIAN FLOOD CONTROL, SILAGO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱50.8M | 100% | Medium risk49 | —-0.037 |
| 224 | 20IE0062NETWORK DEVELOPMENT PROGRAM ROAD WIDENING-SECONDARY ROADS, CALUBIAN JCT-SN ISIDRO-TABANGO-VILLABA-PALOMPON RD., K1005+748-K1006+424, CALUBIAN, LEYTECALUBIAN, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱37.6M | 100% | Medium risk49 | —-0.095 |
| 225 | 19IE0065CONSTRUCTION OF JNR CAIGIT-JNR CABUNGAAN RDVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱32.9M | 100% | Medium risk49 | —-0.095 |