Contractor dossier
145 projects on file, including joint ventures this contractor is part of.
Total projects
145
Total budget
₱5.6B
Average progress
89.1%
Completion rate
73.1%
Average risk score
50.6
Medium risk on average, out of 100
Flagged as unusual
13
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 142 | ₱5.4B | 50.6 | 13 | 89.1% |
| National Capital Region | 3 | ₱117.7M | 49.8 | 0 | 89.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 87 | ₱3.7B | 50.8 | 5 | 91.3% |
| Buildings and Facilities | 19 | ₱207.2M | 42.6 | 0 | 91.5% |
| Flood Control and Drainage | 17 | ₱802.2M | 52.5 | 3 | 85.3% |
| Bridges | 10 | ₱304.6M | 46.9 | 0 | 88.3% |
| Water Provision and Storage | 4 | ₱37.7M | 30.6 | 0 | 100.0% |
| OTHER | 3 | ₱264.5M | 81.4 | 2 | 67.9% |
| GAA 2025 SSP | 2 | ₱64M | 95.6 | 2 | 48.9% |
| Bridges, Roads | 2 | ₱58.4M | 48.4 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱105.1M | 94.5 | 1 | 2.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IH0068CONSTRUCTION (COMPLETION) OF FLOOD CONTROL STRUCTURES, BARANGAY SAN LORENZO, SAN JOSE, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱39.5M | 24% | High risk96 | Flagged0.025 |
| 25IH0030CONSTRUCTION/IMPROVEMENT OF OCAD-SIGAD ROAD, BRGY. OCAD, LAVEZARES NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱24.5M | 74% | High risk96 | Flagged0.012 |
| 25IH0039REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-ALLEN-CATARMAN RD- K0737+360 - K0738+523, CATARMAN & BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱105.1M | 3% | High risk95 | Flagged0.025 |
| 24IH0111CONSTRUCTION OF SEAWALL, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 76% | High risk91 | Flagged0.059 |
| 24IH0065CONSTRUCTION OF ROAD FROM LAVEZARES PORT TO NATIONAL HIGHWAY, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.4M | 28% | High risk77 | Flagged0.026 |
| 17I00030ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES,TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS)-TERTIARY ROADS,SAN ANTONIO CIRCUM. ROAD,KO020+710-KO022+760;KO022+920-KO023+805, SAN ANTONIO, N. SAMAR | Region VIII | Region VIII | Completed | ₱71.7M | 100% | High risk76 | —-0.034 |
| 24IH0106CONSTRUCTION OF RIVERBANK PROTECTION, CATARMAN-BOBON IRRIGATION PROJECT, BARANGAY TURA, BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 53% | High risk75 | Flagged0.056 |
| 24IH0112REHABILITATION OF FLOOD CONTROL, CARANGIAN CREEK, BARANGAY SOUTH - BARANGAY WEST, SAN JOSE, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 0% | High risk74 | Flagged0.064 |
| 25IH0043CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ROQUE, SAN ISIDRO, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱9.9M | 30% | High risk68 | —-0.015 |
| 24IH0031CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOMOGE, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱139.9M | 97% | High risk66 | —-0.021 |
| 22I00041CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATIONS - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱158.7M | 90% | High risk65 | —-0.012 |
| 23I00022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱152.5M | 94% | High risk65 | —-0.024 |
| 23I00094NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - PANGPANG - PALAPAG - MAPANAS - GAMAY - LAPINIG RD - K0835+554 - K0836+060, K0836+160 - K0836+220, K0836+260 - K0837+750, K0838+000 - K0839+090, K0839+660 - K0839+800, K0839+965 - K0840+052.50, NORTHE | Region VIII | Region VIII | On-Going | ₱193M | 92% | High risk64 | —-0.015 |
| 25IH0092CONSTRUCTION OF CAG-ABACA - CULARIMA - GENERAL MALVAR ROAD, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱98M | 0% | High risk63 | Flagged0.007 |
| 17IJ0104IMPROVEMENT/WIDENING OF CALBAYOG DIVERSION ROAD K0729+400-K0732+400, SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱100.4M | 100% | High risk62 | —-0.047 |
| 25IH0081CONSTRUCTION OF SAN ISIDRO-LOPE DE VEGA ROAD, SAN ISIDRO AND LOPE DE VEGA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱73.1M | 18% | High risk61 | —-0.002 |
| 25IH0065REHABILITATION AND IMPROVEMENT OF CARANGIAN CREEK FLOOD CONTROL, SAN JOSE NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱39.1M | 0% | High risk61 | Flagged0.003 |
| 19IJ0065001: ENSURE SAFE AND RELIABLE ROAD SYSTEM - NETWORK DEVELOPMENT, CONSTRUCTION OF BY - PASS AND DIVERSION ROADS, CALBAYOG CITY, COASTAL ROAD, PACKAGE 1A, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱93.7M | 100% | High risk60 | —-0.083 |
| 19IJ0066001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT, CONSTRUCTION OF BY - PASS AND DIVERSION ROADS, CALBAYOG CITY, COASTAL ROAD, PACKAGE B, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱93.6M | 100% | High risk60 | —-0.084 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IH0112REHABILITATION OF FLOOD CONTROL, CARANGIAN CREEK, BARANGAY SOUTH - BARANGAY WEST, SAN JOSE, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 0% | High risk74 | Flagged0.064 |
| 24IH0111CONSTRUCTION OF SEAWALL, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 76% | High risk91 | Flagged0.059 |
| 24IH0106CONSTRUCTION OF RIVERBANK PROTECTION, CATARMAN-BOBON IRRIGATION PROJECT, BARANGAY TURA, BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 53% | High risk75 | Flagged0.056 |
| 24IH0065CONSTRUCTION OF ROAD FROM LAVEZARES PORT TO NATIONAL HIGHWAY, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.4M | 28% | High risk77 | Flagged0.026 |
| 25IH0068CONSTRUCTION (COMPLETION) OF FLOOD CONTROL STRUCTURES, BARANGAY SAN LORENZO, SAN JOSE, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱39.5M | 24% | High risk96 | Flagged0.025 |
| 25IH0039REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-ALLEN-CATARMAN RD- K0737+360 - K0738+523, CATARMAN & BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱105.1M | 3% | High risk95 | Flagged0.025 |
| 23IH0133CONCRETING OF BRGY. SAN ISIDRO TO BRGY. SAN JUAN FMR, BRGY. SAN ISIDRO AND BRGY. SAN JUAN, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱29.8M | 74% | Medium risk52 | Flagged0.013 |
| 25IH0030CONSTRUCTION/IMPROVEMENT OF OCAD-SIGAD ROAD, BRGY. OCAD, LAVEZARES NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱24.5M | 74% | High risk96 | Flagged0.012 |
| 24IH0110CONCRETING OF BRGY. SAN MIGUEL TO MAWO RIVER FMR, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱18.9M | 46% | Medium risk52 | Flagged0.010 |
| 25IH0092CONSTRUCTION OF CAG-ABACA - CULARIMA - GENERAL MALVAR ROAD, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱98M | 0% | High risk63 | Flagged0.007 |
| 23IH0113CONCRETING OF BRGY. LIGAYA TO BRGY. BUENAVISTA FMR, BRGY. LIGAYA AND BRGY. BUENAVISTA, ROSARIO, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱11.9M | 96% | Medium risk46 | Flagged0.005 |
| 25IH0065REHABILITATION AND IMPROVEMENT OF CARANGIAN CREEK FLOOD CONTROL, SAN JOSE NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱39.1M | 0% | High risk61 | Flagged0.003 |
| 25IH0049CONCRETING OF BRGY. POLANGI - PATICUA FMR PHASE IV, BRGY. POLANGI AND BRGY. PATICUA, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱24.8M | 82% | Medium risk51 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 19IJ0088002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LIMARAYON RIVER, BRGY. OQUENDO, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱27.4M | 100% | Medium risk46 | —-0.075 |
| 127 | 19IJ0025CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG JIBATANG RIVER, BRGY. BASUD, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱24.3M | 100% | Medium risk46 | —-0.083 |
| 128 | 18IJ0190CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING, CALBAYOG EAST CENTRAL ELEMENTARY SCHOOL, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱11.7M | 100% | Medium risk46 | —-0.053 |
| 129 | 23IH0113CONCRETING OF BRGY. LIGAYA TO BRGY. BUENAVISTA FMR, BRGY. LIGAYA AND BRGY. BUENAVISTA, ROSARIO, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱11.9M | 96% | Medium risk46 | Flagged0.005 |
| 130 | 21IH0092CONCRETING OF SITIO ESTAMSA, BRGY. MAGSAYSAY FMR, BRGY. MAGSAYSAY BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.042 |
| 131 | 21IH0093CONCRETING OF BRGY. J.P. LAUREL TO BRGY. JOSE ABAD SANTOS FMR PHASE II, BRGY. J.P. LAUREL AND BRGY. JOSE ABAD SANTOS, BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.043 |
| 132 | 22IJ0077CSSP: CONSTRUCTION/IPROVEMENT OF ACCES ROAD LEADING TO PINIPISAKAN FALLS, SAN JORGE, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱4.8M | 100% | Medium risk45 | —-0.094 |
| 133 | 22IH0118CONCRETING OF BRGY. VILLAHERMOSA TO SITIO BINISITAHAN, BRGY. VILLA FMR, BRGY. VILLAHERMOSA & BRGY. VILLA, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱11.9M | 100% | Medium risk45 | —-0.044 |
| 134 | 23IH0128CONCRETING OF BRGY. POLANGI TO BRGY. PATICUA FMR, BRGY. POLANGI AND BRGY. PATICUA, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱12.9M | 100% | Medium risk44 | —-0.040 |
| 135 | 22IH0095CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN MIGUEL, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱2M | 100% | Low risk27 | —-0.097 |
| 136 | 22IH0054CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY ENRIQUETA, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱3M | 100% | Low risk25 | —-0.096 |
| 137 | 19IJ0218CLUSTER: CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RCWS) | Region VIII | Samar 1st DEO | Completed | ₱3.8M | 100% | Low risk25 | —-0.063 |
| 138 | 18IJ0153CLUSTER: CONSTRUCTION OF RAINWATER COLLECTION SYSTEM: | Region VIII | Samar 1st DEO | Completed | ₱3.1M | 100% | Low risk25 | —-0.063 |
| 139 | 19IJ0061003: LOCAL INFRASTRUCTURE PROGRAM, BUILDING AND OTHER STRUCTURES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. HINUGACAN, GANDARA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱2M | 100% | Low risk25 | —-0.096 |
| 140 | 19IJ0082LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDING AND OTHER STRUCTURES - MULTI-PURPOSE / FACILITIES. CONSTRUCTION OF MULTI-PURPOSE BUILDING (SAN POLICARPO NATIONAL HIGH SCHOOL - PHASE I), BRGY. SAN POLICARPO, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.097 |
| 141 | 20IH0098CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM, BRGY. VERIATO, SAN ISIDRO, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱1.4M | 100% | Low risk22 | —-0.062 |
| 142 | 22IH0058REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES SAN MIGUEL BR. (B00279SM) ALONG ALLEN-CATARMAN RD, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱973.1K | 100% | Low risk20 | —-0.057 |
| 143 | 21IH0049CONSTRUCTION/REHABILITATION OF ROAD, BARANGAY CARAGAS, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱1.5M | 100% | Low risk20 | —-0.091 |
| 144 | 19IJ0001CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE II), BRGY. CAGLANIPAO SUR, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.096 |
| 145 | 21IJ0043CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAYCARE CENTER), BRGY. CAG-ANAHAW, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱1.9M | 100% | Low risk15 | —-0.096 |