43 projects on file, including joint ventures this contractor is part of.
Total projects
43
Total budget
₱836.9M
Average progress
92.9%
Completion rate
88.4%
Average risk score
26.7
Low risk on average, out of 100
Flagged as unusual
4
9.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 43 | ₱836.9M | 26.7 | 4 | 92.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 21 | ₱95.5M | 14.3 | 0 | 95.9% |
| Roads | 13 | ₱194.7M | 26.2 | 2 | 92.8% |
| Flood Control and Drainage | 4 | ₱290M | 39.7 | 0 | 100.0% |
| OTHER | 3 | ₱122.3M | 75.9 | 1 | 73.4% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 88.7 | 1 | 56.0% |
| Bridges | 1 | ₱86.8M | 31.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0016CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER PACKAGE 4, BARANGAY KISANTE, MAKILALA, COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱47.5M | 56% | High risk89 | Flagged0.001 |
| 24M00027REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG MARBEL-ALLAH VALLEY-COTABATO RD - K1809+972 - K1813+423.50, GUINDULUNGAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱56.6M | 100% | High risk79 | —-0.000 |
| 24MC0023ROAD WIDENING ALONG DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT) K1633+393-K1635+025, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱46.5M | 100% | High risk75 | —-0.020 |
| 23M00182CONSTRUCTION OF PARALLEL BRIDGE BESIDE TAPAYAN BRIDGE ALONG SIMUAY LANDASAN-PARANG RD (S01761MN) K1869+061 - K 1869+211 (BRIDGES) ; K186+223 - K 1869+373 (APPROACHES), SULTAN MASTURA, MAGUINDANAO | Region XII | Region XII | On-Going | ₱19.2M | 20% | High risk74 | Flagged0.034 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23M00182CONSTRUCTION OF PARALLEL BRIDGE BESIDE TAPAYAN BRIDGE ALONG SIMUAY LANDASAN-PARANG RD (S01761MN) K1869+061 - K 1869+211 (BRIDGES) ; K186+223 - K 1869+373 (APPROACHES), SULTAN MASTURA, MAGUINDANAO | Region XII | Region XII | On-Going | ₱19.2M | 20% | High risk74 | Flagged0.034 |
| 24M00238IMPROVEMENT OF COTABATO-LANAO ROAD, SULTAN KUDARAT SECTION (PHASE 1), K1855+211 -K1855+(-539), SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱39.6M | 6% | Medium risk38 | Flagged0.004 |
| 17MH0056CONCRETING OF SITIO BARURAO TO LOGPOND FMR BRGY. BUTRIL, PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱7.6M | 100% | Medium risk30 | Flagged0.003 |
| 25MC0016CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER PACKAGE 4, BARANGAY KISANTE, MAKILALA, COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱47.5M | 56% | High risk89 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25MC0016CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER PACKAGE 4, BARANGAY KISANTE, MAKILALA, COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱47.5M | 56% | High risk89 | Flagged0.001 |
| 2 | 24M00027REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG MARBEL-ALLAH VALLEY-COTABATO RD - K1809+972 - K1813+423.50, GUINDULUNGAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱56.6M | 100% | High risk79 | —-0.000 |
| 3 | 24MC0023ROAD WIDENING ALONG DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT) K1633+393-K1635+025, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱46.5M | 100% | High risk75 | —-0.020 |
| 4 | 23M00182CONSTRUCTION OF PARALLEL BRIDGE BESIDE TAPAYAN BRIDGE ALONG SIMUAY LANDASAN-PARANG RD (S01761MN) K1869+061 - K 1869+211 (BRIDGES) ; K186+223 - K 1869+373 (APPROACHES), SULTAN MASTURA, MAGUINDANAO | Region XII | Region XII | On-Going | ₱19.2M | 20% | High risk74 | Flagged0.034 |
| 5 | 22M00117CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALEAN, STA. 0+320 0+707, MANGUDADATU, MAGUINDANAO. | Region XII | Region XII | Completed | ₱96M | 100% | Medium risk50 | —-0.060 |
| 6 | 23MD0044CONSTRUCTION OF RIO GRANDE DE MINDANAO FLOOD CONTROL PROJECT ALONG BARANGAY OLANDANG-KADIGASAN-DAMATULAN-LUMOPOG (OLANDANG SECTION - PHASE IV), MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱92.3M | 100% | Medium risk43 | —-0.062 |
| 7 | 22M00046CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA 0+000-STA 0+320, CALIAN, MANGUDADATU, MAGUINDANAO | Region XII | Region XII | Completed | ₱80.3M | 100% | Medium risk41 | —-0.067 |
| 8 | 24M00238IMPROVEMENT OF COTABATO-LANAO ROAD, SULTAN KUDARAT SECTION (PHASE 1), K1855+211 -K1855+(-539), SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱39.6M | 6% | Medium risk38 | Flagged0.004 |
| 9 | 20MA0113CONSTRUCTION OF MULTI-PURPOSE BUILDING (PROVINCIAL GOVERNMENT CENTER), SHARIFF AGUAK, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱4.9M | 100% | Medium risk34 | —-0.058 |
| 10 | 20MA0107CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING-OLD CAPITOL COMPOUND, SHARIFF AGUAK, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱4.9M | 100% | Medium risk34 | —-0.058 |
| 11 | 20MA0112CONSTRUCTION/REHABILITATION OF PROVINCIAL TOURISM OFFICE/MULTI-PURPOSE BUILDING, OLD MAGUINDANAO CAPITOL SITE, SHARIFF AGUAK, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱8.9M | 100% | Medium risk33 | —-0.057 |
| 12 | 22MD0085CONSTRUCTION OF BRIDGE CONNECTING BRGY. CAMANSI TO BRGY. PACAO, ALAMADA, NORTH COTABATO | Region XII | Region XII | Completed | ₱86.8M | 100% | Medium risk31 | —-0.044 |
| 13 | 17MH0056CONCRETING OF SITIO BARURAO TO LOGPOND FMR BRGY. BUTRIL, PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱7.6M | 100% | Medium risk30 | Flagged0.003 |
| 14 | 21M00087CONSTRUCTION OF 1 UNIT 2-STOREY SCHOOL BUILDING, KUYA ELEMENTARY SCHOOL, KUYA, SOUTH UPI, MAGUINDANAO | Region XII | Region XII | Completed | ₱9.8M | 100% | Low risk30 | —-0.079 |
| 15 | 21M00129CONSTRUCTION OF MPB, SHARIFF AGUAK PROVINCIAL CAPITOL, BRGY. POBLACION, SHARIFF AGUAK, MAGUINDANAO | Region XII | Region XII | Completed | ₱8.2M | 100% | Low risk29 | —-0.086 |
| 16 | 21MD0048CONCRETING OF ROAD, KUDARANGAN, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱34.4M | 100% | Low risk27 | —-0.088 |
| 17 | 22M00102ROAD FROM DATU BALABARAN BONSAIN FOOTBRIDGE, TAMONTAKA MOTHER NEAR THE SPECIAL ECONOMIC ZONE PASSING TO THE PROPOSED SEPTAGE TREATMENT PLANT FACILITY TO LEFT SIDE OF CITY HALL (PEOPLE'S PALACE) AND CHILDREN'S PARK, BARANGAY ROSARY HEIGHTS 10 LEADING TO JU | Region XII | Region XII | Completed | ₱4.8M | 100% | Low risk27 | —-0.090 |
| 18 | 21M00080WIDENING OF COTABATO-MARBEL-ALA ROAD ALONG TALAYAN-GUINDULUNGAN ROAD, STA. 1815+840.00-1861+220.00 STA.1817+055.00-STA.1817+952.00, TALAYAN, MAGUINDANAO | Region XII | Region XII | Completed | ₱27.6M | 100% | Low risk27 | —-0.089 |
| 19 | 20MA0033CONCRETING OF ROAD, BRGY. POPOL,BULUAN, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱16.8M | 100% | Low risk27 | —-0.087 |
| 20 | 22M00027ROAD FROM DATU BALABARAN BONSAIN FOOTBRIDGE, TAMONTAKA MOTHER NEAR THE SPECIAL ECONOMIC ZONE PASSING TO THE PROPOSED SEPTAGE TREATMENT PLANT FACILITY TO LEFT SIDE OF CITY HALL (PEOPLE'S PALACE) AND CHILDREN'S PARK, BARANGAY ROSARY HEIGHTS 10 LEADING TO JU | Region XII | Region XII | Completed | ₱5.5M | 100% | Low risk26 | —-0.090 |
| 21 | 19MA0093CONCRETING OF ROAD, BRGY. POBLACION - BRGY. TUA, PAGLAT, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱14.3M | 100% | Low risk26 | —-0.087 |
| 22 | 21M00089CONSTRUCTION OF 1 UNIT 2 STOREY BUILDING, PANDAG NATIONAL HIGHSCHOOL, MALANGIT, PANDAG, MAGINDANAO | Region XII | Region XII | Completed | ₱9.8M | 100% | Low risk26 | —-0.087 |
| 23 | 21M00106CONCRETING OF ROAD, BARANGAY ROSARY HEIGHTS 6 (KRISLAMVILLE), STA. 0+000-STA. 0+563, COTABATO CITY | Region XII | Region XII | Completed | ₱8M | 100% | Low risk26 | —-0.090 |
| 24 | 18MD0054CONST. OF DIKE - CONST. OF OLANDANG (HWAY JUNCTION)-KADIGASAN-DAMATULAN EARTH DIKE ALONG MINDANAO RIVER, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱21.4M | 100% | Low risk25 | —-0.077 |
| 25 | 21MD0052CONSTRUCTION OF CONCRETE ROAD ALONG ALEOSAN BARANGAY ROAD FROM LAWILI TO PENTIL CONNECTING TO PALACAT IN SUPPORT OF RUBBER AND PALM OIL INDUSTRIES, ALEOSAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱9.7M | 100% | Low risk25 | —-0.088 |