Opening the dossier…
Opening the dossier…
Contractor dossier
313 projects on file, including joint ventures this contractor is part of.
Total projects
313
Total budget
₱19.2B
Average progress
94.4%
Completion rate
76.4%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
19
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 114 | ₱6.8B | 54.9 | 6 | 95.8% |
| Region II | 44 | ₱3.8B | 59.0 | 5 | 94.9% |
| Region IX | 29 | ₱1.1B | 55.7 | 0 | 97.9% |
| Cordillera Administrative Region | 26 | ₱2.1B | 57.3 | 3 | 95.3% |
| Region XIII | 25 | ₱713.1M | 38.6 | 0 | 100.0% |
| National Capital Region | 17 | ₱1.1B | 52.7 | 0 | 69.4% |
| Region IV-B | 17 | ₱1.3B | 48.5 | 0 | 98.2% |
| Region VI | 9 | ₱171M | 56.0 | 0 | 98.9% |
| Region XI | 8 | ₱547M | 67.6 | 2 | 81.3% |
| Negros Island Region | 7 | ₱348M | 65.5 | 0 | 97.9% |
| Region VIII | 5 | ₱386.4M | 58.0 | 0 | 99.3% |
| Region III | 4 | ₱198.1M | 71.2 | 1 | 97.3% |
| Region IV-A | 4 | ₱169M | 65.0 | 2 | 76.0% |
| Region V | 3 | ₱396M | 75.8 | 0 | 89.2% |
| Region VII | 1 | ₱3.9M | 23.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 136 | ₱8.1B | 51.7 | 2 | 97.8% |
| Flood Control and Drainage | 125 | ₱8.4B | 52.4 | 2 | 95.3% |
| GAA 2025 OO-2 | 14 | ₱1.2B | 91.8 | 1 | 88.9% |
| Buildings and Facilities | 9 | ₱120.3M | 38.5 | 0 | 89.0% |
| Bridges | 9 | ₱77.1M | 37.9 | 0 | 88.9% |
| GAA 2025 OO-1 | 8 | ₱568.6M | 93.0 | 7 | 67.5% |
| OTHER | 8 | ₱466.8M | 78.1 | 4 | 89.4% |
| GAA 2025 SSP | 3 | ₱211M | 95.3 | 3 | 48.6% |
| Water Provision and Storage | 1 | ₱4.7M | 34.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25LD0124CONSTRUCTION OF FLOOD MITIGATING STRUCTURE WITH STEEL SHEET PILE ALONG PADADA MAINIT RIVER (MASALAM BRIDGE-LAPULABAO SECTION0, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 89% | High risk93 | —-0.004 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25F00125ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZ | Region V | Region V | On-Going | ₱144.9M | 89% | High risk93 | —-0.006 |
| 25KK0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk93 | —-0.015 |
| 25KK0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM, PHASE II), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk93 | —-0.017 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25KK0037CONSTRUCTION OF RIVER / FLOOD CONTROL PROJECT ALONG BALATUKAN RIVER, BRGY. NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱94.6M | 94% | High risk92 | —-0.018 |
| 25KK0031CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG LINUGOS RIVER (DOWNSTREAM, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱113.9M | 92% | High risk92 | —-0.011 |
| 25KK0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk92 | —-0.014 |
| 25KK0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 94% | High risk92 | —-0.015 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), MANGISKIS BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 92% | High risk92 | —-0.014 |
| 25GL0058CONSTRUCTION OF RIVER BANK SLOPE PROTECTION ALONG CAMANSI RIVER, DOWNSTREAM OF CAMANSI BRIDGE LEFT BANK, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.1M | 87% | High risk92 | —-0.016 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PK0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+186 TO K0499+228 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24PK0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+128 TO K0499+186 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24CL0198CONCRETING OF BRGY. PINAGREALAN FMR, BRGY. PINAGREALAN, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 100% | High risk71 | Flagged0.028 |
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25LI0029REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY K1586+705 - K1586+755 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱28.5M | 71% | High risk91 | Flagged0.019 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 24KB0068OFF-CARRIAGEWAY IMPROVEMENT ALONG MARAMAG-MARADUGAO RD, K1558+(-500)-K1558+(-438), K1558+(-420)-K1558+(-360), MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱33.1M | 41% | High risk73 | Flagged0.013 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 24BG0116OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL, BARANGAY DICABISAGAN WEST (AGUINALDO SHRINE) | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 60% | High risk78 | Flagged0.011 |
| 24KH0117REHABILITATION OF ROAD WITH DRAINAGE, BARANGAY CARMEN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱47.8M | 80% | Medium risk53 | Flagged0.011 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 17PA0075REPAIR/REHABILITATION/IMPROVEMENT OF POBLACION FLOOD CONTROL, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk51 | Flagged0.007 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 24DI0083REHABILITATION OF ROAD AND DRAINAGE, BGY. DELA PAZ, BINAN, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱48.3M | 74% | High risk71 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 18KH0037CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO TIGNAPOLOAN (SINULOM FALLS), JUMP OFF POINT OF EXTREME CLASS FOR WHITE WATER RAFTING, TIGNAPOLOAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱23.2M | 100% | Medium risk45 | —-0.095 |
| 252 | 19KH0035CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO TIGNAPOLOAN (SINULOM FALLS), JUMP OFF POINT OF EXTREME CLASS FOR WHITE WATER RAFTING, TIGNAPOLOAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱14.7M | 100% | Medium risk45 | —-0.095 |
| 253 | 21KK0044REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1281 + (-050) - K1281 + 100, MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.092 |
| 254 | 21KK0046REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1397 + 718 - K1397 + 818, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱23.8M | 100% | Medium risk45 | —-0.095 |
| 255 | 21GL0018CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE -VALLEHERMOSO-CANLAON CITY-LA CASTELLANA RD - K0079 + 314 -K0079 + 497 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱20M | 100% | Medium risk45 | —-0.091 |
| 256 | 20KD0008CONST. OF FLOOD CONTROL STRUC. UPSTREAM OF BCIR ALONG DANSOLI & GUSA CREEKS BOTH SIDES GUSA CDOC | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱43.3M | 100% | Medium risk45 | —-0.081 |
| 257 | 21K00277CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IPONAN RIVER, BRGY. CANITOAN, CDO CITY, MISAMIS ORIENTAL STA.2+206.00-STA.2+316.80 | Region X | Region X | Completed | ₱27.2M | 100% | Medium risk45 | —-0.073 |
| 258 | 19KH0025FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF IPONAN FLOOD CONTROL PROJECT (GAP UPSTREAM OF IPONAN BRIDGE 3), BULUA SIDE, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱23.7M | 100% | Medium risk45 | —-0.081 |
| 259 | 20KK0016CONSTRUCTION OF FLOOD CONTROL ALONG BALATUKAN RIVER, DOWNSTREAM, BALINGASAG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | Completed | ₱33.2M | 100% | Medium risk45 | —-0.079 |
| 260 | 20KK0015CONSTRUCTION OF FLOOD CONTROL ALONG BALATUKAN RIVER, DOWNSTREAM, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱33.2M | 100% | Medium risk45 | —-0.079 |
| 261 | 18KK0053CONST. OF REVETMENT AT BRGY. MAMBAYAAN, BALINGASAG (UPSTREAM), LEFT SIDE ALONG BALATUKAN RIVER, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.081 |
| 262 | 22BH0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD DIBULO, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.081 |
| 263 | 18KK0054CONST. OF REVETMENT AT BRGY. MAMBAYAAN, BALINGASAG (UPSTREAM),RIGHT SIDE ALONG BALATUKAN RIVER, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱46.4M | 100% | Medium risk44 | —-0.081 |
| 264 | 22NF0136CONSTRUCTION/REHABILITATION OF CAUB SHORE PROTECTION, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱75.7M | 100% | Medium risk44 | —-0.059 |
| 265 | 24KK0067CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER BRGY. KIBANBAN, BALINGASAG, MISAMIS ORIENTAL (PHASE II) | Region X | Misamis Oriental 1st DEO | Completed | ₱39.6M | 100% | Medium risk44 | —-0.080 |
| 266 | 18KK0064REHABILITATION WITH FLOOD CONTROL OF THE BALINGASAG RIVER IRRIGATION SYSTEM (RIS), BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱29.5M | 100% | Medium risk44 | —-0.081 |
| 267 | 22K00162CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT AT GAHUB RIVER UPSTREAM, STA. 0+000.00 - STA. 0+165.000, GINGOOG CITY, MISAMIS ORIENTAL (PHASE 1) | Region X | Region X | Completed | ₱43.4M | 100% | Medium risk44 | —-0.066 |
| 268 | 20KK0071CONSTRUCTION OF FLOOD CONTROL ALONG GINGOOG RIVER DOWNSTREAM, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱45.4M | 100% | Medium risk44 | —-0.078 |
| 269 | 23BG0036OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - REHABILITATION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. LABINAB PEQUENO, STA. 0+286-STA.0+688, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱43.1M | 100% | Medium risk44 | —-0.065 |
| 270 | 23BG0034OO2 : FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF CAGAYAN RIVER CONTROL, BARANGAY MINANGA, ROXAS, STA.0+284.40 - STA 0+605.60, NAGUILLIAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱43.1M | 100% | Medium risk44 | —-0.066 |
| 271 | 20KK0014CONSTRUCTION OF REVETMENT AT GAHUB RIVER UPSTREAM, LEFT SIDE, GINGOOG CITY, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | Completed | ₱32.9M | 100% | Medium risk44 | —-0.078 |
| 272 | 20KK0013CONSTRUCTION OF REVETMENT AT GAHUB RIVER UPSTREAM, LEFT SIDE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱34.3M | 100% | Medium risk44 | —-0.078 |
| 273 | 21KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GAHUB RIVER (DOWNSTREAM, LEFT SIDE), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱30.8M | 100% | Medium risk44 | —-0.078 |
| 274 | 22BG0086CSSP- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER FLOOD CONTROL STRUCTURE, BRGY. DICABISAGAN WEST (AGUINALDO SHRINE), PALANAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱38.4M | 100% | Medium risk44 | —-0.053 |
| 275 | 22BG0080CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BRGY. YEBAN SUR-MALUNO NORTE, BENITO SOLIVEN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱38.4M | 100% | Medium risk44 | —-0.064 |