Contractor dossier
313 projects on file, including joint ventures this contractor is part of.
Total projects
313
Total budget
₱19.2B
Average progress
94.4%
Completion rate
76.4%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
19
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 114 | ₱6.8B | 54.9 | 6 | 95.8% |
| Region II | 44 | ₱3.8B | 59.0 | 5 | 94.9% |
| Region IX | 29 | ₱1.1B | 55.7 | 0 | 97.9% |
| Cordillera Administrative Region | 26 | ₱2.1B | 57.3 | 3 | 95.3% |
| Region XIII | 25 | ₱713.1M | 38.6 | 0 | 100.0% |
| National Capital Region | 17 | ₱1.1B | 52.7 | 0 | 69.4% |
| Region IV-B | 17 | ₱1.3B | 48.5 | 0 | 98.2% |
| Region VI | 9 | ₱171M | 56.0 | 0 | 98.9% |
| Region XI | 8 | ₱547M | 67.6 | 2 | 81.3% |
| Negros Island Region | 7 | ₱348M | 65.5 | 0 | 97.9% |
| Region VIII | 5 | ₱386.4M | 58.0 | 0 | 99.3% |
| Region III | 4 | ₱198.1M | 71.2 | 1 | 97.3% |
| Region IV-A | 4 | ₱169M | 65.0 | 2 | 76.0% |
| Region V | 3 | ₱396M | 75.8 | 0 | 89.2% |
| Region VII | 1 | ₱3.9M | 23.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 136 | ₱8.1B | 51.7 | 2 | 97.8% |
| Flood Control and Drainage | 125 | ₱8.4B | 52.4 | 2 | 95.3% |
| GAA 2025 OO-2 | 14 | ₱1.2B | 91.8 | 1 | 88.9% |
| Buildings and Facilities | 9 | ₱120.3M | 38.5 | 0 | 89.0% |
| Bridges | 9 | ₱77.1M | 37.9 | 0 | 88.9% |
| GAA 2025 OO-1 | 8 | ₱568.6M | 93.0 | 7 | 67.5% |
| OTHER | 8 | ₱466.8M | 78.1 | 4 | 89.4% |
| GAA 2025 SSP | 3 | ₱211M | 95.3 | 3 | 48.6% |
| Water Provision and Storage | 1 | ₱4.7M | 34.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25LD0124CONSTRUCTION OF FLOOD MITIGATING STRUCTURE WITH STEEL SHEET PILE ALONG PADADA MAINIT RIVER (MASALAM BRIDGE-LAPULABAO SECTION0, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 89% | High risk93 | —-0.004 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25F00125ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZ | Region V | Region V | On-Going | ₱144.9M | 89% | High risk93 | —-0.006 |
| 25KK0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk93 | —-0.015 |
| 25KK0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM, PHASE II), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk93 | —-0.017 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25KK0037CONSTRUCTION OF RIVER / FLOOD CONTROL PROJECT ALONG BALATUKAN RIVER, BRGY. NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱94.6M | 94% | High risk92 | —-0.018 |
| 25KK0031CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG LINUGOS RIVER (DOWNSTREAM, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱113.9M | 92% | High risk92 | —-0.011 |
| 25KK0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk92 | —-0.014 |
| 25KK0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 94% | High risk92 | —-0.015 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), MANGISKIS BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 92% | High risk92 | —-0.014 |
| 25GL0058CONSTRUCTION OF RIVER BANK SLOPE PROTECTION ALONG CAMANSI RIVER, DOWNSTREAM OF CAMANSI BRIDGE LEFT BANK, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.1M | 87% | High risk92 | —-0.016 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PK0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+186 TO K0499+228 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24PK0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+128 TO K0499+186 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24CL0198CONCRETING OF BRGY. PINAGREALAN FMR, BRGY. PINAGREALAN, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 100% | High risk71 | Flagged0.028 |
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25LI0029REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY K1586+705 - K1586+755 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱28.5M | 71% | High risk91 | Flagged0.019 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 24KB0068OFF-CARRIAGEWAY IMPROVEMENT ALONG MARAMAG-MARADUGAO RD, K1558+(-500)-K1558+(-438), K1558+(-420)-K1558+(-360), MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱33.1M | 41% | High risk73 | Flagged0.013 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 24BG0116OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL, BARANGAY DICABISAGAN WEST (AGUINALDO SHRINE) | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 60% | High risk78 | Flagged0.011 |
| 24KH0117REHABILITATION OF ROAD WITH DRAINAGE, BARANGAY CARMEN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱47.8M | 80% | Medium risk53 | Flagged0.011 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 17PA0075REPAIR/REHABILITATION/IMPROVEMENT OF POBLACION FLOOD CONTROL, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk51 | Flagged0.007 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 24DI0083REHABILITATION OF ROAD AND DRAINAGE, BGY. DELA PAZ, BINAN, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱48.3M | 74% | High risk71 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25KL0008CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALUBIJID RIVER, BARANGAY BENIGWAYAN SECTION (PACKAGE 2), ALUBIJID, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱48.5M | 99% | High risk90 | —-0.026 |
| 27 | 25KK0043CONSTRUCTION OF RIVER / FLOOD CONTROL PROJECT ALONG LINUGOS RIVER (DOWNSTREAM, RIGHTSIDE), MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 75% | High risk88 | —-0.015 |
| 28 | 25BG0056OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY BANTUG, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 80% | High risk79 | —-0.005 |
| 29 | 24BG0116OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL, BARANGAY DICABISAGAN WEST (AGUINALDO SHRINE) | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 60% | High risk78 | Flagged0.011 |
| 30 | 21JA0142ROAD WIDENING OF PAGADIAN CITY - ZAMBOANGA CITY RD - K1885 + 000 - K 1886 + 188 | Region IX | Zamboanga City 2nd DEO | Completed | ₱38.1M | 100% | High risk78 | —-0.021 |
| 31 | 24CC0083CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG ANGAT RIVER (PHASE II), BARANGAY PARULAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 32 | 18GL0067VALLEHERMOSO-CANLA-ON CITY, LA CASTELLANA ROADK0073+ (-132)-K0073+000, K0073+100- 073+200,K0073+350-K0073+600, K0073+700-K0073+820, 0074+520, K0074+800, K0074+825-K0075+390, K0075+407-K0075+500, K0076+ (-120)-K0076+050, K0079+036-K0079+147 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱62.7M | 100% | High risk75 | —-0.031 |
| 33 | 21J00052CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL AT TUMAGA RIVER BASIN, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱105.1M | 100% | High risk75 | —-0.003 |
| 34 | 17KL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BCIR (UPSTREAM VILLANUEVA BRIDGE),VILLANUEVA,MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱49M | 100% | High risk74 | —-0.041 |
| 35 | 24CL0174CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG OMAYA RIVER, SAN NARCISO, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | Completed | ₱48.8M | 100% | High risk73 | —-0.057 |
| 36 | 24KB0068OFF-CARRIAGEWAY IMPROVEMENT ALONG MARAMAG-MARADUGAO RD, K1558+(-500)-K1558+(-438), K1558+(-420)-K1558+(-360), MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱33.1M | 41% | High risk73 | Flagged0.013 |
| 37 | 22J00086CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VITALI-SIBULAO BY-PASS ROAD PROJECT (ALTERNATE ROAD OF N1), PACKAGE 2 | Region IX | Region IX | On-Going | ₱94.4M | 80% | High risk72 | —-0.017 |
| 38 | 17KK0027REHAB./RECONST. OF NATL. RDS. W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, GCVR - K1322+320 - K1323+170 | Region X | Misamis Oriental 1st DEO | Completed | ₱42.6M | 100% | High risk72 | —-0.039 |
| 39 | 24CL0198CONCRETING OF BRGY. PINAGREALAN FMR, BRGY. PINAGREALAN, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 100% | High risk71 | Flagged0.028 |
| 40 | 24DI0083REHABILITATION OF ROAD AND DRAINAGE, BGY. DELA PAZ, BINAN, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱48.3M | 74% | High risk71 | Flagged0.000 |
| 41 | 23J00065ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱91.2M | 82% | High risk71 | —-0.023 |
| 42 | 25F00105ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG CULASI, BARANGAY PAM | Region V | Region V | On-Going | ₱144.9M | 79% | High risk70 | —-0.033 |
| 43 | 25OE0043REHABILITATION OF DRAINAGE SYSTEM ALONG DAGUPAN ST., MANILA CITY, PHASE 1 | National Capital Region | North Manila DEO | On-Going | ₱140.3M | 5% | High risk67 | —-0.011 |
| 44 | 20JC0008CONSTRUCTION OF ROCKFALL NETTING FOR SLOPE PROTECTION ALONG LILOY TO SIOCON ROAD, K2032+160 - K2032+212.62, BALIGUIAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱90.1M | 100% | High risk67 | —-0.074 |
| 45 | 21J00050CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - VITALI-SIBULAO BY-PASS ROAD PROJECT (ALTERNATE ROAD OF N1), PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱84.8M | 100% | High risk66 | —-0.013 |
| 46 | 22JA0035REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - PAGADIAN CITY-ZAMBOANGA CITY RD - K1869 + 830 - K1869 + 876 | Region IX | Zamboanga City 2nd DEO | Completed | ₱57M | 100% | High risk66 | —-0.077 |
| 47 | 24CL0072CONSTRUCTION OF BAYTO RIVER FLOOD CONTROL STRUCTURE INCLUDING ROAD DIKE PHASE 1, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱28.6M | 89% | High risk65 | —-0.019 |
| 48 | 22F00075OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-NABUA-BALATAN RD-K0490+640.00-K0490+990.00, BALATAN, CAMARINES SUR 5TH LEGISLATIVE | Region V | Region V | Completed | ₱106.1M | 100% | High risk65 | —-0.088 |
| 49 | 24BG0009OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVE | Region II | Isabela 3rd DEO | Completed | ₱144.7M | 100% | High risk65 | —-0.044 |
| 50 | 24BG0201OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SEC | Region II | Isabela 3rd DEO | On-Going | ₱144.7M | 86% | High risk65 | —-0.013 |