Opening the dossier…
Opening the dossier…
Contractor dossier
313 projects on file, including joint ventures this contractor is part of.
Total projects
313
Total budget
₱19.2B
Average progress
94.4%
Completion rate
76.4%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
19
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 114 | ₱6.8B | 54.9 | 6 | 95.8% |
| Region II | 44 | ₱3.8B | 59.0 | 5 | 94.9% |
| Region IX | 29 | ₱1.1B | 55.7 | 0 | 97.9% |
| Cordillera Administrative Region | 26 | ₱2.1B | 57.3 | 3 | 95.3% |
| Region XIII | 25 | ₱713.1M | 38.6 | 0 | 100.0% |
| National Capital Region | 17 | ₱1.1B | 52.7 | 0 | 69.4% |
| Region IV-B | 17 | ₱1.3B | 48.5 | 0 | 98.2% |
| Region VI | 9 | ₱171M | 56.0 | 0 | 98.9% |
| Region XI | 8 | ₱547M | 67.6 | 2 | 81.3% |
| Negros Island Region | 7 | ₱348M | 65.5 | 0 | 97.9% |
| Region VIII | 5 | ₱386.4M | 58.0 | 0 | 99.3% |
| Region III | 4 | ₱198.1M | 71.2 | 1 | 97.3% |
| Region IV-A | 4 | ₱169M | 65.0 | 2 | 76.0% |
| Region V | 3 | ₱396M | 75.8 | 0 | 89.2% |
| Region VII | 1 | ₱3.9M | 23.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 136 | ₱8.1B | 51.7 | 2 | 97.8% |
| Flood Control and Drainage | 125 | ₱8.4B | 52.4 | 2 | 95.3% |
| GAA 2025 OO-2 | 14 | ₱1.2B | 91.8 | 1 | 88.9% |
| Buildings and Facilities | 9 | ₱120.3M | 38.5 | 0 | 89.0% |
| Bridges | 9 | ₱77.1M | 37.9 | 0 | 88.9% |
| GAA 2025 OO-1 | 8 | ₱568.6M | 93.0 | 7 | 67.5% |
| OTHER | 8 | ₱466.8M | 78.1 | 4 | 89.4% |
| GAA 2025 SSP | 3 | ₱211M | 95.3 | 3 | 48.6% |
| Water Provision and Storage | 1 | ₱4.7M | 34.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25LD0124CONSTRUCTION OF FLOOD MITIGATING STRUCTURE WITH STEEL SHEET PILE ALONG PADADA MAINIT RIVER (MASALAM BRIDGE-LAPULABAO SECTION0, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 89% | High risk93 | —-0.004 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25F00125ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZ | Region V | Region V | On-Going | ₱144.9M | 89% | High risk93 | —-0.006 |
| 25KK0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk93 | —-0.015 |
| 25KK0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM, PHASE II), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk93 | —-0.017 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25KK0037CONSTRUCTION OF RIVER / FLOOD CONTROL PROJECT ALONG BALATUKAN RIVER, BRGY. NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱94.6M | 94% | High risk92 | —-0.018 |
| 25KK0031CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG LINUGOS RIVER (DOWNSTREAM, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱113.9M | 92% | High risk92 | —-0.011 |
| 25KK0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk92 | —-0.014 |
| 25KK0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 94% | High risk92 | —-0.015 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), MANGISKIS BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 92% | High risk92 | —-0.014 |
| 25GL0058CONSTRUCTION OF RIVER BANK SLOPE PROTECTION ALONG CAMANSI RIVER, DOWNSTREAM OF CAMANSI BRIDGE LEFT BANK, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.1M | 87% | High risk92 | —-0.016 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PK0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+186 TO K0499+228 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24PK0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+128 TO K0499+186 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24CL0198CONCRETING OF BRGY. PINAGREALAN FMR, BRGY. PINAGREALAN, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 100% | High risk71 | Flagged0.028 |
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25LI0029REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY K1586+705 - K1586+755 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱28.5M | 71% | High risk91 | Flagged0.019 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 24KB0068OFF-CARRIAGEWAY IMPROVEMENT ALONG MARAMAG-MARADUGAO RD, K1558+(-500)-K1558+(-438), K1558+(-420)-K1558+(-360), MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱33.1M | 41% | High risk73 | Flagged0.013 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 24BG0116OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL, BARANGAY DICABISAGAN WEST (AGUINALDO SHRINE) | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 60% | High risk78 | Flagged0.011 |
| 24KH0117REHABILITATION OF ROAD WITH DRAINAGE, BARANGAY CARMEN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱47.8M | 80% | Medium risk53 | Flagged0.011 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 17PA0075REPAIR/REHABILITATION/IMPROVEMENT OF POBLACION FLOOD CONTROL, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk51 | Flagged0.007 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 24DI0083REHABILITATION OF ROAD AND DRAINAGE, BGY. DELA PAZ, BINAN, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱48.3M | 74% | High risk71 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 24KB0091CONSTRUCTION OF JCT. DOLOGON-BUSCO-QUEZON ROAD, BRGY. BUTONG-BRGY LUMINTAO ROAD, QUEZON, BUKIDNON (PACKAGE 11) | Region X | Bukidnon 2nd DEO | On-Going | ₱73.5M | 100% | Medium risk52 | —-0.047 |
| 152 | 23KK0198CONSTRUCTION OF SEAWALL AT MEDINA COMPREHENSIVE NATIONAL HIGH SCHOOL (MCNHS), BRGY. NORTH POBLACION, MEDINA, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱48.3M | 100% | Medium risk52 | —-0.020 |
| 153 | 20KB0046REHAB/RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BUKIDNON-DAVAO CITY ROAD, K1607+900 - K1607+980, PALACAPAO, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱69.5M | 100% | Medium risk52 | —-0.083 |
| 154 | 22KB0069REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BUKIDNON-DAVAO CITY ROAD, K1608+920-K1609+150 (L/S), SINUDA, KITAOTAO, BUKIDNON 3RD LD | Region X | Bukidnon 2nd DEO | Completed | ₱57.9M | 100% | Medium risk52 | —-0.086 |
| 155 | 23PC0051ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO RD-K0634+098-K0634+189 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱94.5M | 100% | Medium risk52 | —-0.065 |
| 156 | 23PC0043ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY RODS-CLAVERIA-CALANASAN-KABUGAO RD-K0633+505-K0633+649 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱94.1M | 100% | Medium risk52 | —-0.067 |
| 157 | 23PC0047ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO RD-K0633+649-K0634+058 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱94.5M | 100% | Medium risk52 | —-0.067 |
| 158 | 22KD0017UPGRADING OF DRAINAGE STRUCTURE ALONG CORRALES EXTN ST TO PORT RD K1438+(-085) TO 1438+450 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱72.1M | 100% | Medium risk52 | —-0.082 |
| 159 | 24KH0055NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - CDO-AIRPORT-BUKIDNON RD - K1447 + 000 - K1447 + 917, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.085 |
| 160 | 17PA0075REPAIR/REHABILITATION/IMPROVEMENT OF POBLACION FLOOD CONTROL, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk51 | Flagged0.007 |
| 161 | 23KK0061REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY RD - K1399+318 - K1399+378 | Region X | Misamis Oriental 1st DEO | Completed | ₱86.9M | 100% | Medium risk51 | —-0.084 |
| 162 | 23KK0054REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS-BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 118 - K1398 + 218 | Region X | Misamis Oriental 1st DEO | Completed | ₱86.9M | 100% | Medium risk51 | —-0.084 |
| 163 | 23KK0055REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS-BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 218 - K1398 + 318 | Region X | Misamis Oriental 1st DEO | Completed | ₱86.9M | 100% | Medium risk51 | —-0.084 |
| 164 | 23KK0056REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS-BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 318 - K1398 + 418 | Region X | Misamis Oriental 1st DEO | Completed | ₱86.9M | 100% | Medium risk51 | —-0.084 |
| 165 | 23KK0062REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY RD - K1399+118 - K1399+218 | Region X | Misamis Oriental 1st DEO | Completed | ₱86.9M | 100% | Medium risk51 | —-0.085 |
| 166 | 24KH0056NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - CDO-AIRPORT-BUKIDNON RD -K1457 + 260 - K1458 + 000, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱67.6M | 100% | Medium risk51 | —-0.088 |
| 167 | 24P00010CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MEGA DIKE PROJECT ALONG CHICO RIVER, TABUK CITY, KALINGA, STA 83+060 - STA 83+450 (L.S.)TABUK CITY, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱48.3M | 61% | Medium risk51 | —-0.014 |
| 168 | 24P00011CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MEGA DIKE PROJECT ALONG CHICO RIVER, TABUK CITY, KALINGA, STA 83+450 - STA 83+797 (L.S.)TABUK CITY, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱48.3M | 77% | Medium risk51 | —-0.018 |
| 169 | 23KK0015REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1281 + 100 - K1281 + 222 | Region X | Misamis Oriental 1st DEO | Completed | ₱70.1M | 100% | Medium risk51 | —-0.084 |
| 170 | 23BI0045ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA, K0286+190 K0286+250, KINACAO, BAGA | Region II | Nueva Vizcaya DEO | Completed | ₱86.4M | 100% | Medium risk51 | —-0.072 |
| 171 | 23BI0049ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA, K0298+920 K0298+980, BALETE, DIADI | Region II | Nueva Vizcaya DEO | Completed | ₱85.9M | 100% | Medium risk51 | —-0.072 |
| 172 | 23BI0048ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE PRIMARY ROADS DAANG MAHARLIKA, K0297+060 K0297+120, BALETE, DIADI | Region II | Nueva Vizcaya DEO | Completed | ₱86.2M | 100% | Medium risk51 | —-0.072 |
| 173 | 22BH0107SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - REHABILITATION OF ANNAFUNAN FLOOD CONTROL PROJECT, STA. 0+000 - STA. 0+420, ANNAFUNAN, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱67.6M | 100% | Medium risk51 | —-0.064 |
| 174 | 22PC0062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS - CLAVERIA-CALANASAN-KABUGAO ROAD - K0663+275-K0663+376 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱67.4M | 100% | Medium risk51 | —-0.062 |
| 175 | 24BG0044OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BRGY. MALUNO NOR | Region II | Isabela 3rd DEO | Completed | ₱62.7M | 100% | Medium risk51 | —-0.063 |