Contractor dossier
313 projects on file, including joint ventures this contractor is part of.
Total projects
313
Total budget
₱19.2B
Average progress
94.4%
Completion rate
76.4%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
19
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 114 | ₱6.8B | 54.9 | 6 | 95.8% |
| Region II | 44 | ₱3.8B | 59.0 | 5 | 94.9% |
| Region IX | 29 | ₱1.1B | 55.7 | 0 | 97.9% |
| Cordillera Administrative Region | 26 | ₱2.1B | 57.3 | 3 | 95.3% |
| Region XIII | 25 | ₱713.1M | 38.6 | 0 | 100.0% |
| National Capital Region | 17 | ₱1.1B | 52.7 | 0 | 69.4% |
| Region IV-B | 17 | ₱1.3B | 48.5 | 0 | 98.2% |
| Region VI | 9 | ₱171M | 56.0 | 0 | 98.9% |
| Region XI | 8 | ₱547M | 67.6 | 2 | 81.3% |
| Negros Island Region | 7 | ₱348M | 65.5 | 0 | 97.9% |
| Region VIII | 5 | ₱386.4M | 58.0 | 0 | 99.3% |
| Region III | 4 | ₱198.1M | 71.2 | 1 | 97.3% |
| Region IV-A | 4 | ₱169M | 65.0 | 2 | 76.0% |
| Region V | 3 | ₱396M | 75.8 | 0 | 89.2% |
| Region VII | 1 | ₱3.9M | 23.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 136 | ₱8.1B | 51.7 | 2 | 97.8% |
| Flood Control and Drainage | 125 | ₱8.4B | 52.4 | 2 | 95.3% |
| GAA 2025 OO-2 | 14 | ₱1.2B | 91.8 | 1 | 88.9% |
| Buildings and Facilities | 9 | ₱120.3M | 38.5 | 0 | 89.0% |
| Bridges | 9 | ₱77.1M | 37.9 | 0 | 88.9% |
| GAA 2025 OO-1 | 8 | ₱568.6M | 93.0 | 7 | 67.5% |
| OTHER | 8 | ₱466.8M | 78.1 | 4 | 89.4% |
| GAA 2025 SSP | 3 | ₱211M | 95.3 | 3 | 48.6% |
| Water Provision and Storage | 1 | ₱4.7M | 34.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25LD0124CONSTRUCTION OF FLOOD MITIGATING STRUCTURE WITH STEEL SHEET PILE ALONG PADADA MAINIT RIVER (MASALAM BRIDGE-LAPULABAO SECTION0, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 89% | High risk93 | —-0.004 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25F00125ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZ | Region V | Region V | On-Going | ₱144.9M | 89% | High risk93 | —-0.006 |
| 25KK0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk93 | —-0.015 |
| 25KK0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM, PHASE II), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk93 | —-0.017 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25KK0037CONSTRUCTION OF RIVER / FLOOD CONTROL PROJECT ALONG BALATUKAN RIVER, BRGY. NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱94.6M | 94% | High risk92 | —-0.018 |
| 25KK0031CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG LINUGOS RIVER (DOWNSTREAM, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱113.9M | 92% | High risk92 | —-0.011 |
| 25KK0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk92 | —-0.014 |
| 25KK0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 94% | High risk92 | —-0.015 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), MANGISKIS BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 92% | High risk92 | —-0.014 |
| 25GL0058CONSTRUCTION OF RIVER BANK SLOPE PROTECTION ALONG CAMANSI RIVER, DOWNSTREAM OF CAMANSI BRIDGE LEFT BANK, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.1M | 87% | High risk92 | —-0.016 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PK0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+186 TO K0499+228 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24PK0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+128 TO K0499+186 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24CL0198CONCRETING OF BRGY. PINAGREALAN FMR, BRGY. PINAGREALAN, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 100% | High risk71 | Flagged0.028 |
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25LI0029REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY K1586+705 - K1586+755 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱28.5M | 71% | High risk91 | Flagged0.019 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 24KB0068OFF-CARRIAGEWAY IMPROVEMENT ALONG MARAMAG-MARADUGAO RD, K1558+(-500)-K1558+(-438), K1558+(-420)-K1558+(-360), MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱33.1M | 41% | High risk73 | Flagged0.013 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 24BG0116OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL, BARANGAY DICABISAGAN WEST (AGUINALDO SHRINE) | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 60% | High risk78 | Flagged0.011 |
| 24KH0117REHABILITATION OF ROAD WITH DRAINAGE, BARANGAY CARMEN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱47.8M | 80% | Medium risk53 | Flagged0.011 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 17PA0075REPAIR/REHABILITATION/IMPROVEMENT OF POBLACION FLOOD CONTROL, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk51 | Flagged0.007 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 24DI0083REHABILITATION OF ROAD AND DRAINAGE, BGY. DELA PAZ, BINAN, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱48.3M | 74% | High risk71 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 23KH0026CONSTRUCTION OF FLOOD CONTROL WORKS ALONG CDO RIVER UPPER BALULANG SECTION CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱72.4M | 100% | Medium risk50 | —-0.075 |
| 177 | 21KL0056CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BCIR, UPSTREAM OF VILLANUEVA BRIDGE, VILLANUEVA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱80.7M | 100% | Medium risk50 | —-0.073 |
| 178 | 24KK0101CONCRETING OF CIVOLEG TO SAN ISIDRO (CAMPSITE), BRGY. LUNOTAN FMR PHASE II, BRGY. LUNOTAN, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱49.7M | 100% | Medium risk50 | —-0.028 |
| 179 | 23KK0078CONSTRUCTION OF FLOOD CONTROL ALONG BALATUKAN RIVER, BARANGAY NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱72.4M | 100% | Medium risk50 | —-0.075 |
| 180 | 25L00115CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1403+435 - K403+665, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱48.2M | 26% | Medium risk50 | —-0.025 |
| 181 | 21KK0115CONSTRUCTION OF REVETMENT AT DANGOAN RIVER, UPSTREAM, MEDINA, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱80.4M | 100% | Medium risk50 | —-0.072 |
| 182 | 23KK0112CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG DANGOAN BR. 2 RIVER UPSTREAM (LEFT SIDE), MEDINA, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱74.3M | 100% | Medium risk50 | —-0.072 |
| 183 | 23KK0113CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG DANGOAN BR. 1 RIVER (DOWNSTREAM), MEDINA, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱74.3M | 100% | Medium risk50 | —-0.073 |
| 184 | 22P00094CLAVERIA - CALANASAN KABUGAO RD - KO646+472 - KO646+507CALANASAN, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱88.8M | 100% | Medium risk50 | —-0.068 |
| 185 | 18K00011CONST. OF REVETMENT AT GAHUB FCD(UPSTREAM)OF GAHUB BRIDGE RIGHT SIDE ALONG GAHUB RIVER, MIS OR | Region X | Misamis Oriental 1st DEO | Completed | ₱71.8M | 100% | Medium risk50 | —-0.072 |
| 186 | 22K00150CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF SEA WALL, BRGY. DAAN LUNGSOD, K0+000.00 - K0+183.00, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱74.9M | 100% | Medium risk50 | —-0.070 |
| 187 | 24K00242CONSTRUCTION OF JCT. SAYRE HIGHWAY PARALLEL ROAD II, BRGY. MERANGERAN - BRGY. DUMALAMA - BRGY. MAGSAYSAY ROAD, QUEZON, BUKIDNON (PACKAGE II) | Region X | Region X | On-Going | ₱47.5M | 100% | Medium risk50 | —-0.054 |
| 188 | 22KL0045CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAG-ANGA RIVER (UPSTREAM OF TAG-ANGA BRIDGE), VILLANUEVA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱62.7M | 100% | Medium risk50 | —-0.077 |
| 189 | 22KL0044CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAG-ANGA RIVER (DOWNSTREAM OF TAG-ANGA BRIDGE), VILLANUEVA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱62.7M | 100% | Medium risk50 | —-0.077 |
| 190 | 20KL0042CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BCIR UPSTREAM OF VILLANUEVA BRIDGE, VILLANUEVA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱57.9M | 100% | Medium risk50 | —-0.079 |
| 191 | 17NG0017REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE OF JCT. OSMEÑA-PILAR ROAD, SIARGAO ISLAND, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱37M | 100% | Medium risk50 | —-0.046 |
| 192 | 20JA0091CONCRETING OF SITIO APASAN FMR, BRGY. DULIAN (UPPER BUNGUIAO), ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱11.6M | 100% | Medium risk49 | —-0.032 |
| 193 | 23KB0120JCT. DOLOGAN-BUSCO-QUEZON RD TO SAYRE HIGHWAY PARALLEL ROAD II, (BUTONG-LUMINTAO), QUEZON, BUKIDNON (PACKAGE 1) | Region X | Bukidnon 2nd DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.091 |
| 194 | 24KK0038CONSTRUCTION OF ACCESS ROAD LEADING TO TALON FALLS, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱47.5M | 86% | Medium risk49 | —-0.046 |
| 195 | 24KK0039CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP), CONSTRUCTION OF ACCESS ROAD LEADING TO MT. SIOAN TRI-ROCK RESORT, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱48.3M | 100% | Medium risk49 | —-0.090 |
| 196 | 21KK0047REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1397 + 918 - K1398 + 018, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱47.5M | 100% | Medium risk49 | —-0.093 |
| 197 | 25OE0150CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 140, TONDO, MANILA | National Capital Region | North Manila DEO | On-Going | ₱19.4M | 1% | Medium risk49 | —-0.032 |
| 198 | 24OE0129REHABILITATION OF MULTI-PURPOSE BUILDING, ZONE 1-12, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱19.5M | 100% | Medium risk49 | —-0.098 |
| 199 | 23PC0049OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD- K0636+524-K0636+683 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱85.2M | 100% | Medium risk49 | —-0.066 |
| 200 | 22PC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD - K0630+516-K0630+662 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱57.3M | 100% | Medium risk49 | —-0.068 |