Contractor dossier
313 projects on file, including joint ventures this contractor is part of.
Total projects
313
Total budget
₱19.2B
Average progress
94.4%
Completion rate
76.4%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
19
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 114 | ₱6.8B | 54.9 | 6 | 95.8% |
| Region II | 44 | ₱3.8B | 59.0 | 5 | 94.9% |
| Region IX | 29 | ₱1.1B | 55.7 | 0 | 97.9% |
| Cordillera Administrative Region | 26 | ₱2.1B | 57.3 | 3 | 95.3% |
| Region XIII | 25 | ₱713.1M | 38.6 | 0 | 100.0% |
| National Capital Region | 17 | ₱1.1B | 52.7 | 0 | 69.4% |
| Region IV-B | 17 | ₱1.3B | 48.5 | 0 | 98.2% |
| Region VI | 9 | ₱171M | 56.0 | 0 | 98.9% |
| Region XI | 8 | ₱547M | 67.6 | 2 | 81.3% |
| Negros Island Region | 7 | ₱348M | 65.5 | 0 | 97.9% |
| Region VIII | 5 | ₱386.4M | 58.0 | 0 | 99.3% |
| Region III | 4 | ₱198.1M | 71.2 | 1 | 97.3% |
| Region IV-A | 4 | ₱169M | 65.0 | 2 | 76.0% |
| Region V | 3 | ₱396M | 75.8 | 0 | 89.2% |
| Region VII | 1 | ₱3.9M | 23.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 136 | ₱8.1B | 51.7 | 2 | 97.8% |
| Flood Control and Drainage | 125 | ₱8.4B | 52.4 | 2 | 95.3% |
| GAA 2025 OO-2 | 14 | ₱1.2B | 91.8 | 1 | 88.9% |
| Buildings and Facilities | 9 | ₱120.3M | 38.5 | 0 | 89.0% |
| Bridges | 9 | ₱77.1M | 37.9 | 0 | 88.9% |
| GAA 2025 OO-1 | 8 | ₱568.6M | 93.0 | 7 | 67.5% |
| OTHER | 8 | ₱466.8M | 78.1 | 4 | 89.4% |
| GAA 2025 SSP | 3 | ₱211M | 95.3 | 3 | 48.6% |
| Water Provision and Storage | 1 | ₱4.7M | 34.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25LD0124CONSTRUCTION OF FLOOD MITIGATING STRUCTURE WITH STEEL SHEET PILE ALONG PADADA MAINIT RIVER (MASALAM BRIDGE-LAPULABAO SECTION0, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 89% | High risk93 | —-0.004 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25F00125ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZ | Region V | Region V | On-Going | ₱144.9M | 89% | High risk93 | —-0.006 |
| 25KK0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk93 | —-0.015 |
| 25KK0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM, PHASE II), CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk93 | —-0.017 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25KK0037CONSTRUCTION OF RIVER / FLOOD CONTROL PROJECT ALONG BALATUKAN RIVER, BRGY. NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱94.6M | 94% | High risk92 | —-0.018 |
| 25KK0031CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG LINUGOS RIVER (DOWNSTREAM, LEFT SIDE), MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱113.9M | 92% | High risk92 | —-0.011 |
| 25KK0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 91% | High risk92 | —-0.014 |
| 25KK0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), LUNAO BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 94% | High risk92 | —-0.015 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), MANGISKIS BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 92% | High risk92 | —-0.014 |
| 25GL0058CONSTRUCTION OF RIVER BANK SLOPE PROTECTION ALONG CAMANSI RIVER, DOWNSTREAM OF CAMANSI BRIDGE LEFT BANK, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.1M | 87% | High risk92 | —-0.016 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PK0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+186 TO K0499+228 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24PK0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0499+128 TO K0499+186 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 100% | High risk91 | Flagged0.061 |
| 24CL0198CONCRETING OF BRGY. PINAGREALAN FMR, BRGY. PINAGREALAN, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱48.3M | 100% | High risk71 | Flagged0.028 |
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25LI0029REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY K1586+705 - K1586+755 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱28.5M | 71% | High risk91 | Flagged0.019 |
| 25LI0038REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MONTEVISTA - COMPOSTELA - MATI BDRY RD 1457+280 - K1457+325 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱40M | 77% | High risk92 | Flagged0.016 |
| 25KK0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1398 + 300- K1398 + 600 | Region X | Misamis Oriental 1st DEO | On-Going | ₱143.3M | 62% | High risk93 | Flagged0.015 |
| 25BI0056ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0326+850 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 47% | High risk94 | Flagged0.015 |
| 25KK0018INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG GINGOOG-CLAVERIA-VILLANUEVA RD - K1335 + 200 - K1337+500, K1338+033 - K1339+000 | Region X | Misamis Oriental 1st DEO | On-Going | ₱66.4M | 56% | High risk95 | Flagged0.014 |
| 24KB0068OFF-CARRIAGEWAY IMPROVEMENT ALONG MARAMAG-MARADUGAO RD, K1558+(-500)-K1558+(-438), K1558+(-420)-K1558+(-360), MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱33.1M | 41% | High risk73 | Flagged0.013 |
| 25BI0054ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD.- K0320+100 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 59% | High risk95 | Flagged0.013 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Region X | Misamis Oriental 1st DEO | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
| 24BG0116OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL, BARANGAY DICABISAGAN WEST (AGUINALDO SHRINE) | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 60% | High risk78 | Flagged0.011 |
| 24KH0117REHABILITATION OF ROAD WITH DRAINAGE, BARANGAY CARMEN, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱47.8M | 80% | Medium risk53 | Flagged0.011 |
| 25BI0055ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS BAMBANG-KASIBU-SOLANO RD. - K0322+900 | Region II | Nueva Vizcaya DEO | On-Going | ₱95.5M | 71% | High risk95 | Flagged0.009 |
| 17PA0075REPAIR/REHABILITATION/IMPROVEMENT OF POBLACION FLOOD CONTROL, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.4M | 100% | Medium risk51 | Flagged0.007 |
| 25KB0095REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1605+560-K1605+675 (RS), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱47.5M | 53% | High risk93 | Flagged0.005 |
| 25BG0050OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVER-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CENTRO II, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 77% | High risk94 | Flagged0.001 |
| 24DI0083REHABILITATION OF ROAD AND DRAINAGE, BGY. DELA PAZ, BINAN, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱48.3M | 74% | High risk71 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 23GL0040CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - VALLEHERMOSO-CANLAON CITY-LA CASTELLANA RD - K0079 + 349 - K0079 + 492 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.089 |
| 202 | 22PC0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD-K0625+720-K0625+869 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱62.9M | 100% | Medium risk49 | —-0.068 |
| 203 | 20HJ0024REHABILITATION/RECONSTRUCTION OF ROADS WITH, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-DUMAGUETE NORTH RD (JCT. BAIS-KABANKALAN-NEGROS OCC BDRY)-K0062+828-K0063+148, MANJUYOD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.089 |
| 204 | 23BG0075OO2 - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BARANGAY MINANGA, NAGUILIAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱52.8M | 100% | Medium risk49 | —-0.066 |
| 205 | 23BG0091OO2 : FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BARANGAY LABINAB, PEQUENO, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱52.7M | 100% | Medium risk48 | —-0.066 |
| 206 | 17NG0011SLOPE PROTECTION ALONG JCT. DEL CARMEN-STA. MONICA-SAN ISIDRO ROAD (K0025+000-K0068+000) | Region XIII | Surigao del Norte 1st DEO | Completed | ₱18.7M | 100% | Medium risk48 | —-0.049 |
| 207 | 21KF0093REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG C3 ROAD, ILIGAN CITY, KM1521+220 TO KM 1521+350, ILIGAN CITY, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱48.3M | 100% | Medium risk48 | —-0.093 |
| 208 | 24K00182CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IPONAN RIVER, CAGAYAN DE ORO CITY, PACKAGE 1 | Region X | Region X | On-Going | ₱52.3M | 100% | Medium risk48 | —-0.041 |
| 209 | 16NG0071REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. DEL CARMEN-STA. MONICA-SAN ISIDRO ROAD, SAN BENITO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱9.2M | 100% | Medium risk48 | —-0.049 |
| 210 | 21EG0059CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PUERTO PRINCESA SOUTH RD - K0035+600 - K0035 +790, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱66.5M | 100% | Medium risk48 | —-0.067 |
| 211 | 21PC0037ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPES COLLAPSE AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD, K0631+023-K0631+123 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱47.3M | 100% | Medium risk48 | —-0.069 |
| 212 | 22ED0016INSTALLATION OF ROAD SAFETY DEVICES ALONG CALAPAN SOUTH ROAD K0021+000 - K0033+600, NAUJAN - VICTORIA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱76.4M | 100% | Medium risk48 | —-0.085 |
| 213 | 22ED0017INSTALLATION OF ROAD SAFETY DEVICES ALONG CALAPAN SOUTH ROAD K0033+600 - K0047+200, VICTORIA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱76.4M | 100% | Medium risk47 | —-0.085 |
| 214 | 22ED0018INSTALLATION OF ROAD SAFETY DEVICES ALONG CALAPAN SOUTH ROAD K0047+200 - K0060+800, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱76.4M | 100% | Medium risk47 | —-0.085 |
| 215 | 18DP0012BRIDGE PROGRAM RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT BAÑADERO BR. (BO2877LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Laguna 3rd DEO | Completed | ₱14.9M | 100% | Medium risk47 | —-0.069 |
| 216 | 18JA0124CONSTRUCTION OF 2 STOREY 6 CLASSROOM SCHOOL BUILDING AT DAVUY ES, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱11.9M | 100% | Medium risk47 | —-0.032 |
| 217 | 23OE0231CONSTRUCTION OF 3STY6CL, I. DELOS REYES ES, CITY OF MANILA | National Capital Region | North Manila DEO | Completed | ₱30M | 100% | Medium risk47 | —-0.044 |
| 218 | 22KL0040CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT GITAGUM RIVER, GITAGUM MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱48.3M | 100% | Medium risk47 | —-0.082 |
| 219 | 18JA0125CONSTRUCTION OF 2 STOREY 6 CLASSROOM SCHOOL BUILDING AT SIBULAO ES, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱12.5M | 100% | Medium risk47 | —-0.035 |
| 220 | 22K00128ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1288 + 590.23 - K1289 + 040.00 | Region X | Region X | Completed | ₱46.7M | 100% | Medium risk47 | —-0.082 |
| 221 | 23BG0078OO2-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DANGAN (STA. 0+000 - STA. 0+550), REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱48.7M | 100% | Medium risk47 | —-0.067 |
| 222 | 25OE0099REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - JUAN LUNA BR. 2 (B03349LZ) ALONG JUAN LUNA ST | National Capital Region | North Manila DEO | On-Going | ₱7.7M | 0% | Medium risk47 | —-0.009 |
| 223 | 22K00183REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE, AND LANDSLIDE, GINGOOG-CLAVERIA-VILLANUEVA RD - K1323 + 892.134 - K1324 + 080 | Region X | Region X | Completed | ₱46.7M | 100% | Medium risk47 | —-0.083 |
| 224 | 22K00141ASSET PRESERVATION-REHAB./RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE,AND LANDSLIDE-SECONDARY ROADS GINGOOG-CLAVERIA-VILLANUEVA RD - K1321 + 000 - K1321 + 100 | Region X | Region X | Completed | ₱46.7M | 100% | Medium risk47 | —-0.093 |
| 225 | 22K00139ASSET PRESERVATION-REHAB./RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE,AND LANDSLIDE-SECONDARY ROADS GINGOOG-CLAVERIA-VILLANUEVA RD - K1321 + 100 - K1321 + 200 | Region X | Region X | Completed | ₱46.7M | 100% | Medium risk47 | —-0.093 |