Contractor dossier
142 projects on file, including joint ventures this contractor is part of.
Total projects
142
Total budget
₱2.7B
Average progress
98.9%
Completion rate
95.8%
Average risk score
20.7
Low risk on average, out of 100
Flagged as unusual
4
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 142 | ₱2.7B | 20.7 | 4 | 98.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 76 | ₱518.3M | 10.1 | 0 | 100.0% |
| Roads | 26 | ₱891.9M | 29.2 | 0 | 100.0% |
| Bridges | 20 | ₱524.8M | 28.0 | 0 | 100.0% |
| Flood Control and Drainage | 12 | ₱490.5M | 36.0 | 1 | 99.7% |
| Water Provision and Storage | 4 | ₱14.6M | 15.6 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱49.4M | 93.5 | 1 | 12.5% |
| GAA 2025 OO-1 | 1 | ₱32.2M | 91.0 | 1 | 36.4% |
| GAA 2025 OO-2 | 1 | ₱144.6M | 91.0 | 0 | 100.0% |
| OTHER | 1 | ₱54.7M | 79.2 | 1 | 96.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MF0024COMPLETION OF MULTI PURPOSE BUILDING (AMPITHEATER BUILDING), BARANGAY KALAWAG II, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱49.4M | 13% | High risk93 | Flagged0.042 |
| 25MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD - K1642 + 416 - K1642 + 546 | Region XII | Cotabato 2nd DEO | On-Going | ₱32.2M | 36% | High risk91 | Flagged0.021 |
| 25MF0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, TAGA SECTION - UPSTREAM (L/S),LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.6M | 100% | High risk91 | —-0.002 |
| 24MC0024ROAD WIDENING ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1645+ 570 - K1646+413, ANTIPAS, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱54.7M | 96% | High risk79 | Flagged0.005 |
| 24M00073CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE IV), STA. 44+186.63 - STA. 44+611.63, BARANGAY ALEGRIA, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱96M | 96% | High risk67 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MF0024COMPLETION OF MULTI PURPOSE BUILDING (AMPITHEATER BUILDING), BARANGAY KALAWAG II, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱49.4M | 13% | High risk93 | Flagged0.042 |
| 25MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD - K1642 + 416 - K1642 + 546 | Region XII | Cotabato 2nd DEO | On-Going | ₱32.2M | 36% | High risk91 | Flagged0.021 |
| 24MC0024ROAD WIDENING ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1645+ 570 - K1646+413, ANTIPAS, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱54.7M | 96% | High risk79 | Flagged0.005 |
| 24M00073CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE IV), STA. 44+186.63 - STA. 44+611.63, BARANGAY ALEGRIA, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱96M | 96% | High risk67 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25MF0024COMPLETION OF MULTI PURPOSE BUILDING (AMPITHEATER BUILDING), BARANGAY KALAWAG II, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱49.4M | 13% | High risk93 | Flagged0.042 |
| 2 | 25MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD - K1642 + 416 - K1642 + 546 | Region XII | Cotabato 2nd DEO | On-Going | ₱32.2M | 36% | High risk91 | Flagged0.021 |
| 3 | 25MF0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, TAGA SECTION - UPSTREAM (L/S),LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.6M | 100% | High risk91 | —-0.002 |
| 4 | 24MC0024ROAD WIDENING ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1645+ 570 - K1646+413, ANTIPAS, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱54.7M | 96% | High risk79 | Flagged0.005 |
| 5 | 24M00073CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE IV), STA. 44+186.63 - STA. 44+611.63, BARANGAY ALEGRIA, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱96M | 96% | High risk67 | Flagged0.001 |
| 6 | 16MH0045CONSTRUCTION OF FLOOD CONTROL (ALA RIVER BASIN) K0+000 - K0+200 SECTION 1, K0+618.5+798.5 SECTION 2, DALADAP, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱38.5M | 100% | Medium risk47 | —-0.044 |
| 7 | 17MH0035CONSTRUCTION OF FLOOD CONTROL (ALA RIVER BASIN), K0+000 - K0+380, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱36.2M | 100% | Medium risk47 | —-0.049 |
| 8 | 17MC0030CONSTRUCTION OF MALASILA RIVER BANK PROTECTION (STA. 0+810-STA.0+885 BOTH SIDES), M'LANG, COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.048 |
| 9 | 17MC0090CONSTRUCITON OF M'LANG RIVER CONTROL (STA 1+495-STA. 1+650), M'LANG, NORTH COTABATO - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE | Region XII | Cotabato 2nd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.048 |
| 10 | 18MB0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ACCESS ROAD LEADING TO MT. MATUTUM JUMP-OFF POINT, BRGY. KABLON - SITIO GLANDANG, TUPI POBLACION, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱49M | 100% | Medium risk45 | —-0.052 |
| 11 | 17MC0055RECONSTRUCTION FROM ASPHALT TO CONCRETE-MAKILALA-ALLAH VALLEY RD K1621+320-K1622+319, K1635+480-K1635+558 | Region XII | Cotabato 2nd DEO | Completed | ₱34.3M | 100% | Medium risk42 | —-0.053 |
| 12 | 17M00013ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-KALAMANSIG ROAD, TINALON SECTION, SNA, SULTAN KUDARAT, K1873+200 TO K1874+689, (CHAINAGE 26200 TO CHAINAGE 27690) | Region XII | Region XII | Completed | ₱86.6M | 100% | Medium risk41 | —-0.040 |
| 13 | 17MF0006WIDENING OF GANSING BRIDGE FROM 2 LANES TO 4 LANES ALONG DULAWAN-MARBEL ROAD (B00291MN) K1757+398-1757+418.6, GANSING, TACURONG CITY | Region XII | Sultan Kudarat 1st DEO | Completed | ₱19.1M | 100% | Medium risk39 | —-0.028 |
| 14 | 17MC0044WIDENING OF BRIDGE - SINALLANGAN BR. (B00225MN) ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) | Region XII | Cotabato 2nd DEO | Completed | ₱19.6M | 100% | Medium risk38 | —-0.031 |
| 15 | 17MC0059WIDENING OF BRIDGE-BALUGAN BR. (B00226MN) ALONG DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT) | Region XII | Cotabato 2nd DEO | Completed | ₱30.4M | 100% | Medium risk38 | —-0.025 |
| 16 | 17MC0060WIDENING OF BRIDGE - BULATUKAN BR. (B00227MN) ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) | Region XII | Cotabato 2nd DEO | Completed | ₱30.4M | 100% | Medium risk38 | —-0.028 |
| 17 | 17MC0073WIDENING OF BRIDGE - SAN VICENTE BR. (B00237MN), ALONG MAKILALA-ALLAH VALLEY RD | Region XII | Cotabato 2nd DEO | Completed | ₱38.2M | 100% | Medium risk37 | —-0.029 |
| 18 | 24MF0005DULAWAN-MARBEL RD - K1760 + 404 - K1762 + 630, 1763+017 - 1763 + 418, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱73.2M | 100% | Medium risk36 | —-0.081 |
| 19 | 20M00031ROAD WIDENING MIDSAYAP MARBEL RD K1770+(-904) K1772+825, TANTANGAN, SOUTH COTABATO | Region XII | Region XII | Completed | ₱79M | 100% | Medium risk36 | —-0.079 |
| 20 | 21M00003ROAD WIDENING - DAVAO COTABATO RD (JCT. DIGOS-COTABATO SECT) K1636+000-K1637+816, K1641+551-K1643+872, K1644(-232)-K1644+143, MATALAM, NORTH COTABATO | Region XII | Region XII | Completed | ₱74.6M | 100% | Medium risk34 | —-0.082 |
| 21 | 18MC0101WIDENING OF PERMANENT BRIDGES-MARBEL BR. (B00261MN) ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON ROAD, PRES. ROXAS, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱73.5M | 100% | Medium risk33 | —-0.048 |
| 22 | 17MH0034CONSTRUCTION OF COVERED COURT (MULTI-PURPOSE BUILDING), BRGY. POBLACION, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.7M | 100% | Medium risk31 | —-0.058 |
| 23 | 20MC0003ROAD WIDENING - ON SPECIFIC LOCATIONS ALONG DAVAO- COTABATO RD. (JCT DIGOS-COTABATO SECTION) K1594+(-263) - K1616+146, MAKILALA, NORTH COTABATO AND KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | Completed | ₱50.6M | 100% | Low risk29 | —-0.081 |
| 24 | 23MF0002KIDAPAWAN-ALLAH JUNCTION RD - K1666 + 284 - K1668 + 294, K1668 + 521 - K1669 + 755 | Region XII | Sultan Kudarat 1st DEO | Completed | ₱47.8M | 100% | Low risk29 | —-0.087 |
| 25 | 20MF0007ROAD WIDENING-MARBEL-ALLAH VALLEY-COTABATO ROAD, K1770+851-K1772+848, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱48.2M | 100% | Low risk29 | —-0.087 |