Contractor dossier
142 projects on file, including joint ventures this contractor is part of.
Total projects
142
Total budget
₱2.7B
Average progress
98.9%
Completion rate
95.8%
Average risk score
20.7
Low risk on average, out of 100
Flagged as unusual
4
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 142 | ₱2.7B | 20.7 | 4 | 98.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 76 | ₱518.3M | 10.1 | 0 | 100.0% |
| Roads | 26 | ₱891.9M | 29.2 | 0 | 100.0% |
| Bridges | 20 | ₱524.8M | 28.0 | 0 | 100.0% |
| Flood Control and Drainage | 12 | ₱490.5M | 36.0 | 1 | 99.7% |
| Water Provision and Storage | 4 | ₱14.6M | 15.6 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱49.4M | 93.5 | 1 | 12.5% |
| GAA 2025 OO-1 | 1 | ₱32.2M | 91.0 | 1 | 36.4% |
| GAA 2025 OO-2 | 1 | ₱144.6M | 91.0 | 0 | 100.0% |
| OTHER | 1 | ₱54.7M | 79.2 | 1 | 96.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MF0024COMPLETION OF MULTI PURPOSE BUILDING (AMPITHEATER BUILDING), BARANGAY KALAWAG II, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱49.4M | 13% | High risk93 | Flagged0.042 |
| 25MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD - K1642 + 416 - K1642 + 546 | Region XII | Cotabato 2nd DEO | On-Going | ₱32.2M | 36% | High risk91 | Flagged0.021 |
| 25MF0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALA RIVER, TAGA SECTION - UPSTREAM (L/S),LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱144.6M | 100% | High risk91 | —-0.002 |
| 24MC0024ROAD WIDENING ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1645+ 570 - K1646+413, ANTIPAS, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱54.7M | 96% | High risk79 | Flagged0.005 |
| 24M00073CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE IV), STA. 44+186.63 - STA. 44+611.63, BARANGAY ALEGRIA, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱96M | 96% | High risk67 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MF0024COMPLETION OF MULTI PURPOSE BUILDING (AMPITHEATER BUILDING), BARANGAY KALAWAG II, ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱49.4M | 13% | High risk93 | Flagged0.042 |
| 25MC0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD - K1642 + 416 - K1642 + 546 | Region XII | Cotabato 2nd DEO | On-Going | ₱32.2M | 36% | High risk91 | Flagged0.021 |
| 24MC0024ROAD WIDENING ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1645+ 570 - K1646+413, ANTIPAS, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱54.7M | 96% | High risk79 | Flagged0.005 |
| 24M00073CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE IV), STA. 44+186.63 - STA. 44+611.63, BARANGAY ALEGRIA, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱96M | 96% | High risk67 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18MC0100WIDENING OF PERMANENT BRIDGES - MAGPET BR. (B00263MN) ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD, PRES. ROXAS, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.5M | 100% | Low risk25 | —-0.055 |
| 52 | 18MC0094WIDENING OF PERMANENT BRIDGES-BINAY BR. (B00266MN) ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON ROAD, PRES. ROXAS, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱30.8M | 100% | Low risk25 | —-0.057 |
| 53 | 23MC0017REPLACEMENT OF BRIDGE (TEMPORARY TO PERMANENT) - MALINAN BR. (B00258MN) ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD, KIDAPAWAN CITY, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱32M | 100% | Low risk24 | —-0.053 |
| 54 | 21MF0017KALANDAGAN BRIDGE 1 (B00293MN) ALONG DULAWAN-MARBEL ROAD, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱17.6M | 100% | Low risk24 | —-0.058 |
| 55 | 21MF0018KALANDAGAN BRIDGE 2 (B00294MN) ALONG DULAWAN-MARBEL ROAD, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱12.3M | 100% | Low risk24 | —-0.058 |
| 56 | 24MF0022CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER (KOLAMBOG - BAMBAD), ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱45.2M | 100% | Low risk24 | —-0.075 |
| 57 | 18MC0102WIDENING OF PERMANENT BRIDGES-SIKITAN BR. (B00259MN) ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON ROAD, KIDAPAWAN CITY, COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱20.8M | 100% | Low risk24 | —-0.058 |
| 58 | 18MC0103WIDENING OF PERMANENT BRIDGES - KINGDOM HALL BR. (B00257MN) ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON ROAD KIDAPAWAN CITY, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱21.1M | 100% | Low risk24 | —-0.058 |
| 59 | 19MC0071WIDENING OF BRIDGE-BAGONTAPAY BR. (B00240MN) ALONG MAKILALA-ALLAH VALLEY ROAD, M'LANG, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱23.3M | 100% | Low risk24 | —-0.053 |
| 60 | 18MF0080CONST. OF 2-STY 2-CLASSROOMS LABORATORY BLDG. AT VIRGINIA F. GRIÑO NHS, TACURONG CITY, SULTAN KUDARAT. | Region XII | Sultan Kudarat 1st DEO | Completed | ₱10.9M | 100% | Low risk24 | —-0.043 |
| 61 | 18MC0076WIDENING OF PERMANENT BRIDGES-MALAMOTE BR. (B00275MN) ALONG MATALAM-M'LANG-BAGONTAPAY JCT ROAD, MATALAM, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱14.6M | 100% | Low risk24 | —-0.058 |
| 62 | 20MH0040CONSTRUCTION OF MULTI-PURPOSE BUILDING AT MASIAG NATIONAL HIGH SCHOOL, BAGUMBAYAN, SULTAN KUDARAT BRGY. MASIAG, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.8M | 100% | Low risk24 | —-0.086 |
| 63 | 18MH0131CONSTRUCTION OF TWO (2) STOREY - TWO(2) LABORATORY (ICT LAB) AT PURIKAY NATIONAL HIGH SCHOOL LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱10M | 100% | Low risk23 | —-0.041 |
| 64 | 20MH0018WIDENING OF LOWER MONO BRIDGE (B01269MN) ALONG ISULAN JCT.- NINOY AQUINO ROAD BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱24.6M | 100% | Low risk23 | —-0.055 |
| 65 | 18MH0125CONSTRUCTION OF TWO (2) STOREY - SIX (6) CLASSROOMS AT LEBAK LEGISLATED NATIONAL HIGH SCHOOL LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱12.4M | 100% | Low risk23 | —-0.043 |
| 66 | 23MH0013REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BAGUMBAYAN BR. (B00608MN) ALONG ISULAN JCT-NINOY AQUINO RD (S00743MN) BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱10.6M | 100% | Low risk23 | —-0.061 |
| 67 | 21MH0022REHABILITATION/MAJOR REPAIR OF SEWOD BRIDGE (B00614MN) ALONG ISULAN JCT.-NINOY AQUINO ROAD SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱10.1M | 100% | Low risk23 | —-0.061 |
| 68 | 20MF0085CONSTRUCTION OF MULTI-PURPOSE BUILDING/DISASTER CENTER AT BRGY. RAJAH MUDA, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱7.9M | 100% | Low risk23 | —-0.087 |
| 69 | 21MH0019REHABILITATION/MAJOR REPAIR OF GAPOK BRIDGE (B00613MN) ALONG ISULAN JCT.-NINOY AQUINO ROAD SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱9.6M | 100% | Low risk23 | —-0.060 |
| 70 | 18MF0094CONST. OF 3-STY 6-CLASSROOMS LABORATORY BUILDING AT VIRGINIA F. GRIÑO NHS, TACURONG CITY, SULTAN KUDARAT. | Region XII | Sultan Kudarat 1st DEO | Completed | ₱35.4M | 100% | Low risk23 | —-0.032 |
| 71 | 18MC0197CONSTRUCTION OF FOUR (4) STOREY TWENTY FOUR (24) CLASSROOM WORKSHOP BUILDING (7 X 18), KIDAPAWAN CITY NATIONAL HIGH SCHOOL, KIDAPAWAN CITY, NORTH COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱50.8M | 100% | Low risk22 | —-0.022 |
| 72 | 18MH0124CONSTRUCTION OF TWO (2) STOREY - TWO (2) LABORATORY (ICT LAB) AT LEBAK LEGISLATED NATIONAL HIGH SCHOOL LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱10.1M | 100% | Low risk22 | —-0.043 |
| 73 | 20MH0072CONSTRUCTION OF TWO (2) - STOREY, SIX (6) CLASS ROOMS SCHOOL BUILDING AT AMPAD-GUIABAR MEMORIAL ELEMENTARY SCHOOL LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱14.9M | 100% | Low risk21 | —-0.039 |
| 74 | 23MF0029CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MUNICIPAL AMPHITHEATER), BARANGAY TAMNAG, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱19.8M | 100% | Low risk21 | —-0.083 |
| 75 | 23MH0094CONCRETING OF PUROK MALIGAYA, BRGY. DUMANGAS NUEVO FMR, BRGY. DUMANGAS NUEVO, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱9.6M | 100% | Low risk21 | —-0.033 |