Contractor dossier
140 projects on file, including joint ventures this contractor is part of.
Total projects
140
Total budget
₱11.9B
Average progress
94.0%
Completion rate
87.9%
Average risk score
56.3
Medium risk on average, out of 100
Flagged as unusual
8
5.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 47 | ₱3.5B | 55.2 | 0 | 98.1% |
| Cordillera Administrative Region | 30 | ₱2.6B | 56.5 | 0 | 100.0% |
| Region I | 23 | ₱1.9B | 54.2 | 1 | 100.0% |
| Region IV-B | 12 | ₱1.1B | 57.3 | 1 | 68.4% |
| Region XIII | 12 | ₱950.7M | 45.4 | 0 | 100.0% |
| Region III | 10 | ₱991.6M | 69.1 | 3 | 86.3% |
| Region XI | 4 | ₱612.5M | 56.9 | 1 | 77.4% |
| Negros Island Region | 2 | ₱285M | 95.8 | 2 | 28.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 108 | ₱9.3B | 53.8 | 2 | 96.6% |
| Flood Control and Drainage | 20 | ₱1.5B | 54.0 | 0 | 95.1% |
| GAA 2025 SSP | 4 | ₱573.1M | 95.6 | 4 | 54.7% |
| GAA 2025 OO-2 | 2 | ₱95.1M | 88.8 | 1 | 31.7% |
| Buildings and Facilities | 2 | ₱39.1M | 72.3 | 0 | 100.0% |
| Bridges | 2 | ₱191.1M | 63.9 | 0 | 86.0% |
| OTHER | 1 | ₱94.6M | 89.0 | 1 | 100.0% |
| Bridges, Roads | 1 | ₱96.5M | 65.3 | 0 | 65.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HK0019SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0046+000 - K0057+800 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 19% | High risk96 | Flagged0.047 |
| 25HK0018SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0034+000 - K0046+000 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 37% | High risk96 | Flagged0.038 |
| 25CF0129SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 82% | High risk96 | Flagged0.015 |
| 25CF0128SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG JOSE ABAD SANTOS AVENUE (JASA) S00967LZ, CABIAO - SAN ISIDRO SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 81% | High risk95 | Flagged0.018 |
| 25ED0027CONSTRUCTION OF SEAWALL STRUCTURE, VILLA ANTONIO, BARANGAY NAVOTAS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱66.5M | 11% | High risk91 | Flagged0.007 |
| 24A00657CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, BARANGAY EMBARCADERO TO BARANGAY OSIEM, MANGALDAN, PANGASINAN | Region I | Region I | On-Going | ₱94.6M | 100% | High risk89 | Flagged0.051 |
| 25ED0018CONSTRUCTION OF SEAWALL STRUCTURE, BARANGAY PACHOCA, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱28.6M | 52% | High risk86 | —-0.005 |
| 25C00484ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱141.9M | 0% | High risk74 | Flagged0.004 |
| 24C00001ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱145.7M | 100% | High risk74 | —-0.022 |
| 24CL0093CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FERIA, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.6M | 100% | High risk72 | —-0.064 |
| 24CL0083CONSTRUCTION OF PUBLIC COVERED COURT INCLUDING GROUND IMPROVEMENTS, BRGY. FERIA, PHASE 2 SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.5M | 100% | High risk72 | —-0.064 |
| 25D00009CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, PACKAGE V, GENERAL NAKAR, QUEZON | Region IV-A | Region IV-A | On-Going | ₱140.7M | 74% | High risk68 | —-0.026 |
| 22PA0142SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES, CONSTRUCTION OF COLABAOAN FLOOD CONTROL, MALANAS RIVER, BARANGAY COLABAOAN, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | High risk67 | —-0.034 |
| 21L00142ROCKFALL NETTING INCLUDING IMPROVEMENT OF CRITICAL INTERSECTION AT JCT. SHRINE HILLS ALONG DAVAO CITY DIVERSION ROAD, MATINA CROSSING, DAVAO CITY | Region XI | Region XI | Completed | ₱333.7M | 100% | High risk66 | —-0.047 |
| 24DK0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO - TAYABAS - LUCBAN DIVERSION RD, QUEZON (TAYABAS SIDE) - PACKAGE O | Region IV-A | Quezon 1st DEO | On-Going | ₱96.5M | 65% | High risk65 | —-0.031 |
| 22PA0311SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DOLORES-CARDONA BRIDGE AND APPROACHES, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.034 |
| 25L00114CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1378+330 - K1378+450, K1378+600 - K1378+700, K1379+070 - K1379+390, K1379+805 - K1379+850, K1388+550 - K1388+600, K1399+580 - K1399+635, K1403+140 - K1403+190, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱185.7M | 9% | High risk64 | Flagged0.007 |
| 22PA0141SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF MALANAS FLOOD CONTROL STRUCTURE, CULLIONG, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.052 |
| 22PA0131SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF MALANAS FLOOD CONTROL STRUCTURE, GUIMBA AND DAOIDAO, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.053 |
| 24DK0034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO - TAYABAS - LUCBAN DIVERSION RD, QUEZON (TAYABAS SIDE) - PACKAGE L | Region IV-A | Quezon 1st DEO | On-Going | ₱96.5M | 72% | High risk63 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00657CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, BARANGAY EMBARCADERO TO BARANGAY OSIEM, MANGALDAN, PANGASINAN | Region I | Region I | On-Going | ₱94.6M | 100% | High risk89 | Flagged0.051 |
| 25HK0019SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0046+000 - K0057+800 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 19% | High risk96 | Flagged0.047 |
| 25HK0018SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0034+000 - K0046+000 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 37% | High risk96 | Flagged0.038 |
| 25CF0128SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG JOSE ABAD SANTOS AVENUE (JASA) S00967LZ, CABIAO - SAN ISIDRO SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 81% | High risk95 | Flagged0.018 |
| 25CF0129SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 82% | High risk96 | Flagged0.015 |
| 25ED0027CONSTRUCTION OF SEAWALL STRUCTURE, VILLA ANTONIO, BARANGAY NAVOTAS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱66.5M | 11% | High risk91 | Flagged0.007 |
| 25L00114CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1378+330 - K1378+450, K1378+600 - K1378+700, K1379+070 - K1379+390, K1379+805 - K1379+850, K1388+550 - K1388+600, K1399+580 - K1399+635, K1403+140 - K1403+190, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱185.7M | 9% | High risk64 | Flagged0.007 |
| 25C00484ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱141.9M | 0% | High risk74 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25HK0019SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0046+000 - K0057+800 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 19% | High risk96 | Flagged0.047 |
| 2 | 25HK0018SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0034+000 - K0046+000 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 37% | High risk96 | Flagged0.038 |
| 3 | 25CF0129SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 82% | High risk96 | Flagged0.015 |
| 4 | 25CF0128SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG JOSE ABAD SANTOS AVENUE (JASA) S00967LZ, CABIAO - SAN ISIDRO SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 81% | High risk95 | Flagged0.018 |
| 5 | 25ED0027CONSTRUCTION OF SEAWALL STRUCTURE, VILLA ANTONIO, BARANGAY NAVOTAS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱66.5M | 11% | High risk91 | Flagged0.007 |
| 6 | 24A00657CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, BARANGAY EMBARCADERO TO BARANGAY OSIEM, MANGALDAN, PANGASINAN | Region I | Region I | On-Going | ₱94.6M | 100% | High risk89 | Flagged0.051 |
| 7 | 25ED0018CONSTRUCTION OF SEAWALL STRUCTURE, BARANGAY PACHOCA, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱28.6M | 52% | High risk86 | —-0.005 |
| 8 | 25C00484ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱141.9M | 0% | High risk74 | Flagged0.004 |
| 9 | 24C00001ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱145.7M | 100% | High risk74 | —-0.022 |
| 10 | 24CL0093CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FERIA, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.6M | 100% | High risk72 | —-0.064 |
| 11 | 24CL0083CONSTRUCTION OF PUBLIC COVERED COURT INCLUDING GROUND IMPROVEMENTS, BRGY. FERIA, PHASE 2 SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.5M | 100% | High risk72 | —-0.064 |
| 12 | 25D00009CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, PACKAGE V, GENERAL NAKAR, QUEZON | Region IV-A | Region IV-A | On-Going | ₱140.7M | 74% | High risk68 | —-0.026 |
| 13 | 22PA0142SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES, CONSTRUCTION OF COLABAOAN FLOOD CONTROL, MALANAS RIVER, BARANGAY COLABAOAN, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | High risk67 | —-0.034 |
| 14 | 21L00142ROCKFALL NETTING INCLUDING IMPROVEMENT OF CRITICAL INTERSECTION AT JCT. SHRINE HILLS ALONG DAVAO CITY DIVERSION ROAD, MATINA CROSSING, DAVAO CITY | Region XI | Region XI | Completed | ₱333.7M | 100% | High risk66 | —-0.047 |
| 15 | 24DK0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO - TAYABAS - LUCBAN DIVERSION RD, QUEZON (TAYABAS SIDE) - PACKAGE O | Region IV-A | Quezon 1st DEO | On-Going | ₱96.5M | 65% | High risk65 | —-0.031 |
| 16 | 22PA0311SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DOLORES-CARDONA BRIDGE AND APPROACHES, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.034 |
| 17 | 25L00114CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1378+330 - K1378+450, K1378+600 - K1378+700, K1379+070 - K1379+390, K1379+805 - K1379+850, K1388+550 - K1388+600, K1399+580 - K1399+635, K1403+140 - K1403+190, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱185.7M | 9% | High risk64 | Flagged0.007 |
| 18 | 22PA0141SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF MALANAS FLOOD CONTROL STRUCTURE, CULLIONG, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.052 |
| 19 | 22PA0131SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF MALANAS FLOOD CONTROL STRUCTURE, GUIMBA AND DAOIDAO, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.053 |
| 20 | 24DK0034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO - TAYABAS - LUCBAN DIVERSION RD, QUEZON (TAYABAS SIDE) - PACKAGE L | Region IV-A | Quezon 1st DEO | On-Going | ₱96.5M | 72% | High risk63 | —-0.015 |
| 21 | 24A00439CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY SAN JUAN WEST, ARINGAY, LA UNION | Region I | Region I | Completed | ₱144.7M | 100% | High risk62 | —-0.044 |
| 22 | 24A00494CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG TAGAMUSING AND ALLIED RIVERS, PACKAGE 1, BINALONAN-URDANETA CITY, PANGASINAN | Region I | Region I | Completed | ₱96.5M | 100% | High risk62 | —-0.058 |
| 23 | 24A00495CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG TAGAMUSING AND ALLIED RIVERS, PACKAGE 2, BINALONAN-URDANETA CITY, PANGASINAN | Region I | Region I | Completed | ₱96.5M | 100% | High risk62 | —-0.058 |
| 24 | 24A00441CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALILI RIVER, BARANGAY AL-ALINAO NORTE, NAGUILIAN, LA UNION | Region I | Region I | Completed | ₱115.8M | 100% | High risk61 | —-0.055 |
| 25 | 24DD0093CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG MANILA - BATANGAS ROAD, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱95.1M | 100% | High risk61 | —-0.061 |