Contractor dossier
112 projects on file, including joint ventures this contractor is part of.
Total projects
112
Total budget
₱10.2B
Average progress
97.1%
Completion rate
91.1%
Average risk score
58.2
Medium risk on average, out of 100
Flagged as unusual
8
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 90 | ₱7.9B | 58.7 | 7 | 96.7% |
| Region I | 19 | ₱1.9B | 55.0 | 0 | 100.0% |
| Region III | 2 | ₱236.6M | 58.7 | 0 | 100.0% |
| Region II | 1 | ₱182.6M | 64.6 | 1 | 72.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 64 | ₱6.1B | 53.2 | 0 | 99.4% |
| Flood Control and Drainage | 29 | ₱2.6B | 55.6 | 1 | 99.0% |
| OTHER | 10 | ₱613.5M | 74.7 | 0 | 100.0% |
| GAA 2025 OO-2 | 7 | ₱760.1M | 93.1 | 7 | 62.7% |
| Bridges | 2 | ₱60.1M | 47.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25P00024CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN SECTION, STA. 37+926 - STA. 39+239 (LEFT SIDE), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 0% | High risk93 | Flagged0.024 |
| 25P00018CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 40% | High risk93 | Flagged0.014 |
| 25P00014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.) | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 87% | High risk93 | Flagged0.006 |
| 25P00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (L/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 89% | High risk93 | Flagged0.006 |
| 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
| 25P00023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTION,STA. 34+414 - 35+489 (R.S.), BARANGAY RIPANG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95.1M | 86% | High risk93 | Flagged0.006 |
| 21P00065LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF BAGUYOS FLOOD CONTROL AT BARANGAY COLALOMANKAY | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk78 | —-0.017 |
| 18PF0029ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SOIL COLLAPSE AND LANDSLIDE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, TUBLAY, BENGUET, K0273+081 - K0273+235, K0273+700 - K0275+050, K0275+120 - K0275+400, K0275+550 - K0276+01 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱94.5M | 100% | High risk77 | —-0.013 |
| 19PF0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT BAGUIO-BONTOC ROAD (SECONDARY), K0277+000-K0277+213, K0277+235-K0277+K0556, K0277+556-K0278+214, K0278+367-K0278+608, K0278+8 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱95.1M | 100% | High risk77 | —-0.014 |
| 18PE0053CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL POBLACION TO KARAO, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.6M | 100% | High risk77 | —-0.015 |
| 19PF0028CONSTRUCTION OF MISSING LINKS/NEW ROADS, BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱91.5M | 100% | High risk75 | —-0.016 |
| 20PF0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: NRJ BULALACAO-CABACAB-SINTO ROAD LEADING TO AGRI-TOURISM FARMS IN BRGY. BULALACAO, MANKAYAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱53.1M | 100% | High risk74 | —-0.027 |
| 19PF0003CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURIST DESTINATIONS NRJ BULALACAO-CABACAB-SINTO ROAD, MANKAYAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.027 |
| 18PE0030CONSTRUCTION OF CONCRETE ROAD - BAGUIO-BONTOC ROAD JCT. TO GUIWENG-NAWAL-TICKEY-DACLAN ROAD IN SUPPORT OF COFFEE, AND PROCESSED FOOD MEAT INDUSTRIES, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱28.9M | 100% | High risk72 | —-0.027 |
| 18PF0023NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱15.4M | 100% | High risk72 | —-0.028 |
| 18PF0030ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, KAPANGAN, KIBUNGAN AND BAKUN, BENGUET, K0337+216 - K0337+238, K0337+930 - K0337+960, K0337+982 - K0337+99 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱16.6M | 100% | High risk72 | —-0.028 |
| 17PF0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF BAGUYOS FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.043 |
| 23B00056OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | Region II | On-Going | ₱182.6M | 72% | High risk65 | Flagged0.007 |
| 23P00020CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL WITHIN CHICO RIVER BASIN, STA. 37+995 - STA. 39+300 (L/S), CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱115.8M | 100% | High risk64 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25P00024CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN SECTION, STA. 37+926 - STA. 39+239 (LEFT SIDE), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 0% | High risk93 | Flagged0.024 |
| 25P00018CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 40% | High risk93 | Flagged0.014 |
| 23B00056OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | Region II | On-Going | ₱182.6M | 72% | High risk65 | Flagged0.007 |
| 25P00014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.) | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 87% | High risk93 | Flagged0.006 |
| 25P00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (L/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 89% | High risk93 | Flagged0.006 |
| 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
| 25P00023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTION,STA. 34+414 - 35+489 (R.S.), BARANGAY RIPANG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95.1M | 86% | High risk93 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23A00130CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY HALOG EAST - HALOG WEST, TUBAO, LA UNION | Region I | Region I | Completed | ₱144.7M | 100% | High risk62 | —-0.045 |
| 27 | 23A00128CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY ANDUYAN, TUBAO, LA UNION | Region I | Region I | Completed | ₱144.7M | 100% | High risk62 | —-0.045 |
| 28 | 24A00276CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARORO RIVER, BARANGAY BACSIL, BACNOTAN, LA UNION | Region I | Region I | Completed | ₱154.4M | 100% | High risk62 | —-0.046 |
| 29 | 24A00152CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY ANDUYAN, TUBAO, LA UNION | Region I | Region I | Completed | ₱144.7M | 100% | High risk62 | —-0.047 |
| 30 | 23A00129CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY RIZAL, TUBAO, LA UNION | Region I | Region I | Completed | ₱144.7M | 100% | High risk62 | —-0.045 |
| 31 | 17PF0012REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) ALONG ABATAN-MANKAYAN-CERVANTES ROAD; K0334 + -500 - K0334 + -250, K0337 + 400 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱49M | 100% | High risk62 | —-0.051 |
| 32 | 24A00154CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY RIZAL, TUBAO, LA UNION | Region I | Region I | Completed | ₱144.7M | 100% | High risk62 | —-0.047 |
| 33 | 24A00153CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY HALOG EAST, TUBAO, LA UNION | Region I | Region I | Completed | ₱144.7M | 100% | High risk62 | —-0.047 |
| 34 | 21P00063LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF AMPUSONGAN FLOOD CONTROLBAKUN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk61 | —-0.049 |
| 35 | 22PI0038CONSTRUCTION OF ABIT FLOOD CONTROL ALONG ABIT RIVER, TADIAN, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.058 |
| 36 | 17PF0011REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0351+950 K0352+055, K0351+970-K0352+035. | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱34.7M | 100% | High risk61 | —-0.051 |
| 37 | 23A00132CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY MAGSAYSAY, TUBAO, LA UNION | Region I | Region I | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 38 | 17PE0016OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG BENGUET-NUEVA VIZCAYA ROAD, K0298+853 - K0304+000, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱44.1M | 100% | High risk60 | —-0.051 |
| 39 | 21C00003ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, BAGAC-MARIVELES ROAD, PROVINCE OF BATAAN | Region III | Region III | Completed | ₱137.6M | 100% | Medium risk60 | —-0.075 |
| 40 | 22P00067A) BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD, K0350 + 650 - K0350 + 760B) BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD, K0353 + 710 - K0353 + 804BANAUE, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱174.6M | 100% | Medium risk60 | —-0.057 |
| 41 | 22P00099KIANGAN - TINOC - BUGUIAS RD - KO355+520 - KO355+668TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk60 | —-0.051 |
| 42 | 19PB0010NETWORK DEVELOPMENT- PAVING OF UNPAVED ROADS- TERTIARY ROADS APAYAO-ILOCOS NORTE RD | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱93.6M | 100% | Medium risk59 | —-0.067 |
| 43 | 22P00061CONSTRUCTION OF BEYENG - TACADANG ROADBAKUN & KIBUNGAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱198M | 100% | Medium risk58 | —-0.043 |
| 44 | 22P00041CONSTRUCTION OF ROAD, KAPANGAN, BENGUET - SAN GABRIEL, LA UNIONKAPANGAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱197.9M | 100% | Medium risk58 | —-0.042 |
| 45 | 21P00061ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS BAGUIO - ITOGON ROADKO260+800 - KO260+954ITOGON, | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.046 |
| 46 | 22P00008ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLISTT O | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.049 |
| 47 | 21P00045ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLI | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.052 |
| 48 | 22P00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLISTT O | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱164.1M | 100% | Medium risk58 | —-0.057 |
| 49 | 22P00007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLISTT O | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.058 |
| 50 | 21P00011ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLIS | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.062 |