Contractor dossier
112 projects on file, including joint ventures this contractor is part of.
Total projects
112
Total budget
₱10.2B
Average progress
97.1%
Completion rate
91.1%
Average risk score
58.2
Medium risk on average, out of 100
Flagged as unusual
8
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 90 | ₱7.9B | 58.7 | 7 | 96.7% |
| Region I | 19 | ₱1.9B | 55.0 | 0 | 100.0% |
| Region III | 2 | ₱236.6M | 58.7 | 0 | 100.0% |
| Region II | 1 | ₱182.6M | 64.6 | 1 | 72.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 64 | ₱6.1B | 53.2 | 0 | 99.4% |
| Flood Control and Drainage | 29 | ₱2.6B | 55.6 | 1 | 99.0% |
| OTHER | 10 | ₱613.5M | 74.7 | 0 | 100.0% |
| GAA 2025 OO-2 | 7 | ₱760.1M | 93.1 | 7 | 62.7% |
| Bridges | 2 | ₱60.1M | 47.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25P00024CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN SECTION, STA. 37+926 - STA. 39+239 (LEFT SIDE), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 0% | High risk93 | Flagged0.024 |
| 25P00018CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 40% | High risk93 | Flagged0.014 |
| 25P00014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.) | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 87% | High risk93 | Flagged0.006 |
| 25P00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (L/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 89% | High risk93 | Flagged0.006 |
| 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
| 25P00023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTION,STA. 34+414 - 35+489 (R.S.), BARANGAY RIPANG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95.1M | 86% | High risk93 | Flagged0.006 |
| 21P00065LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF BAGUYOS FLOOD CONTROL AT BARANGAY COLALOMANKAY | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk78 | —-0.017 |
| 18PF0029ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SOIL COLLAPSE AND LANDSLIDE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, TUBLAY, BENGUET, K0273+081 - K0273+235, K0273+700 - K0275+050, K0275+120 - K0275+400, K0275+550 - K0276+01 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱94.5M | 100% | High risk77 | —-0.013 |
| 19PF0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT BAGUIO-BONTOC ROAD (SECONDARY), K0277+000-K0277+213, K0277+235-K0277+K0556, K0277+556-K0278+214, K0278+367-K0278+608, K0278+8 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱95.1M | 100% | High risk77 | —-0.014 |
| 18PE0053CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL POBLACION TO KARAO, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.6M | 100% | High risk77 | —-0.015 |
| 19PF0028CONSTRUCTION OF MISSING LINKS/NEW ROADS, BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱91.5M | 100% | High risk75 | —-0.016 |
| 20PF0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: NRJ BULALACAO-CABACAB-SINTO ROAD LEADING TO AGRI-TOURISM FARMS IN BRGY. BULALACAO, MANKAYAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱53.1M | 100% | High risk74 | —-0.027 |
| 19PF0003CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURIST DESTINATIONS NRJ BULALACAO-CABACAB-SINTO ROAD, MANKAYAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.027 |
| 18PE0030CONSTRUCTION OF CONCRETE ROAD - BAGUIO-BONTOC ROAD JCT. TO GUIWENG-NAWAL-TICKEY-DACLAN ROAD IN SUPPORT OF COFFEE, AND PROCESSED FOOD MEAT INDUSTRIES, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱28.9M | 100% | High risk72 | —-0.027 |
| 18PF0023NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱15.4M | 100% | High risk72 | —-0.028 |
| 18PF0030ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, KAPANGAN, KIBUNGAN AND BAKUN, BENGUET, K0337+216 - K0337+238, K0337+930 - K0337+960, K0337+982 - K0337+99 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱16.6M | 100% | High risk72 | —-0.028 |
| 17PF0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF BAGUYOS FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.043 |
| 23B00056OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | Region II | On-Going | ₱182.6M | 72% | High risk65 | Flagged0.007 |
| 23P00020CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL WITHIN CHICO RIVER BASIN, STA. 37+995 - STA. 39+300 (L/S), CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱115.8M | 100% | High risk64 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25P00024CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN SECTION, STA. 37+926 - STA. 39+239 (LEFT SIDE), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 0% | High risk93 | Flagged0.024 |
| 25P00018CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 40% | High risk93 | Flagged0.014 |
| 23B00056OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | Region II | On-Going | ₱182.6M | 72% | High risk65 | Flagged0.007 |
| 25P00014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.) | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 87% | High risk93 | Flagged0.006 |
| 25P00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (L/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 89% | High risk93 | Flagged0.006 |
| 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
| 25P00023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTION,STA. 34+414 - 35+489 (R.S.), BARANGAY RIPANG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95.1M | 86% | High risk93 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 21P00049ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLI | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.062 |
| 52 | 22P00004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱289.5M | 100% | Medium risk58 | —-0.040 |
| 53 | 23C00264CONVERGENCE AND SPECIAL SUPPORT PROG- BASIC INFRASTRUCTURE PROG- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - REHABILITATION OF ROADS WITH SLIP SLOPES, COLLAPSE, AND LANDSLIDE, BAGAC AND MARIVELES, BATAAN | Region III | Region III | On-Going | ₱99M | 100% | Medium risk58 | —-0.053 |
| 54 | 22P00035BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, ASIN - NANGALISAN JCT. - BAYABAS - MONGLO JCT. (SECTION 1 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), PACKAGE 1, BENGUETSABLAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱173.6M | 100% | Medium risk58 | —-0.054 |
| 55 | 18P00005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, LABEY-LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLISTT OUTER RING, CIRCUMFERENTIAL ROAD) INCL. ROW AND SLOPE PROTECTION, | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱132.2M | 100% | Medium risk58 | —-0.068 |
| 56 | 25PC0006ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD- K0675 + 050 - K0677 + 000 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱105.9M | 63% | Medium risk57 | —-0.032 |
| 57 | 19PF0012ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS- GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0353+320-K035 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱95.5M | 100% | Medium risk57 | —-0.077 |
| 58 | 22P00068A) BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD, K0358 + 842 - K0359 + 047B) BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD, K0362 + 080 - K0362 + 140BANAUE, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱124.5M | 100% | Medium risk57 | —-0.070 |
| 59 | 18P00014ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES (SECONDARY ROADS) GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, BOKOD, BENGUE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱123M | 100% | Medium risk57 | —-0.071 |
| 60 | 20PE0067REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG GUREL- BOKOD- KABAYAN- BUGUIAS- ABATAN ROAD, K0326+300 - K0326+420, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.7M | 100% | Medium risk57 | —-0.076 |
| 61 | 21P00005CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ABATAN - MANKAYAN - CERVANTES ROAD, KO347+ | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.4M | 100% | Medium risk56 | —-0.078 |
| 62 | 21P00003ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, BANAUE - MAYOYAO - A. LISTA - ISABELA ROAD, KO34 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱105.3M | 100% | Medium risk56 | —-0.076 |
| 63 | 21P00004ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, BANAUE - MAYOYAO - A. LISTA - ISABELA ROAD, KO36 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱99.2M | 100% | Medium risk56 | —-0.076 |
| 64 | 21P00040ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MARCOS HI-WAYKO272+800 - KO272+909TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱120.6M | 100% | Medium risk56 | —-0.069 |
| 65 | 20PE0066REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG GUREL- BOKOD- KABAYAN- BUGUIAS- ABATAN ROAD, K0340+500 - K0340+600, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.5M | 100% | Medium risk56 | —-0.077 |
| 66 | 21P00038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS ABATAN-MANKAYAN-CERVANTES ROAD K0335 + 350 - K0335 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱106.1M | 100% | Medium risk56 | —-0.075 |
| 67 | 21P00035ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS GOV. BADO DANGWA NATIONAL ROADK0345 + 520 - K0345 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱101.3M | 100% | Medium risk56 | —-0.075 |
| 68 | 19PC0054NETWORK DEVELOPMENT: PAVING OF UNPAVED ROADS-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD STA. K0716+277-K0718+027, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱77.8M | 100% | Medium risk56 | —-0.070 |
| 69 | 19PF0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS, ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, K0345+600-K0345+700 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱90.7M | 100% | Medium risk54 | —-0.073 |
| 70 | 18PF0015CONSTRUCTION OF MISSING LINKS/NEW ROADS: LABEY-LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) INCLUDING ROW AND SLOPE PROTECTION, TUBLAY, BENGUET (STA.271+600 - STA.273+600) | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱89.4M | 100% | Medium risk54 | —-0.076 |
| 71 | 22AG0113ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - ALAMINOS-BOLINAO RD - KO341+600 - KO342+200 AT BRGY. TIEP, BANI, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk53 | —-0.066 |
| 72 | 22AG0112ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - ALAMINOS-BOLINAO RD - KO340+246 - KO340+500, KO341+278 - KO341+600 AT BRGY. TIEP, BANI, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk53 | —-0.069 |
| 73 | 24PI0013OO1, REHAB/ RECONSTN OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - BAGUIO - BONTOC RD (NAPO SECTION) | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱72.4M | 100% | Medium risk53 | —-0.078 |
| 74 | 22PJ0044CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS WITHIN THE DISTRICT. (CLUSTER) | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱76.7M | 100% | Medium risk52 | —-0.064 |
| 75 | 19PE0001REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD FROM (S00379LZ), K0314+680 - K0315+000, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱86.8M | 100% | Medium risk52 | —-0.079 |