Contractor dossier
112 projects on file, including joint ventures this contractor is part of.
Total projects
112
Total budget
₱10.2B
Average progress
97.1%
Completion rate
91.1%
Average risk score
58.2
Medium risk on average, out of 100
Flagged as unusual
8
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 90 | ₱7.9B | 58.7 | 7 | 96.7% |
| Region I | 19 | ₱1.9B | 55.0 | 0 | 100.0% |
| Region III | 2 | ₱236.6M | 58.7 | 0 | 100.0% |
| Region II | 1 | ₱182.6M | 64.6 | 1 | 72.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 64 | ₱6.1B | 53.2 | 0 | 99.4% |
| Flood Control and Drainage | 29 | ₱2.6B | 55.6 | 1 | 99.0% |
| OTHER | 10 | ₱613.5M | 74.7 | 0 | 100.0% |
| GAA 2025 OO-2 | 7 | ₱760.1M | 93.1 | 7 | 62.7% |
| Bridges | 2 | ₱60.1M | 47.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25P00024CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN SECTION, STA. 37+926 - STA. 39+239 (LEFT SIDE), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 0% | High risk93 | Flagged0.024 |
| 25P00018CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 40% | High risk93 | Flagged0.014 |
| 25P00014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.) | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 87% | High risk93 | Flagged0.006 |
| 25P00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (L/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 89% | High risk93 | Flagged0.006 |
| 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
| 25P00023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTION,STA. 34+414 - 35+489 (R.S.), BARANGAY RIPANG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95.1M | 86% | High risk93 | Flagged0.006 |
| 21P00065LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF BAGUYOS FLOOD CONTROL AT BARANGAY COLALOMANKAY | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk78 | —-0.017 |
| 18PF0029ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SOIL COLLAPSE AND LANDSLIDE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, TUBLAY, BENGUET, K0273+081 - K0273+235, K0273+700 - K0275+050, K0275+120 - K0275+400, K0275+550 - K0276+01 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱94.5M | 100% | High risk77 | —-0.013 |
| 19PF0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT BAGUIO-BONTOC ROAD (SECONDARY), K0277+000-K0277+213, K0277+235-K0277+K0556, K0277+556-K0278+214, K0278+367-K0278+608, K0278+8 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱95.1M | 100% | High risk77 | —-0.014 |
| 18PE0053CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL POBLACION TO KARAO, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.6M | 100% | High risk77 | —-0.015 |
| 19PF0028CONSTRUCTION OF MISSING LINKS/NEW ROADS, BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱91.5M | 100% | High risk75 | —-0.016 |
| 20PF0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: NRJ BULALACAO-CABACAB-SINTO ROAD LEADING TO AGRI-TOURISM FARMS IN BRGY. BULALACAO, MANKAYAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱53.1M | 100% | High risk74 | —-0.027 |
| 19PF0003CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURIST DESTINATIONS NRJ BULALACAO-CABACAB-SINTO ROAD, MANKAYAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.027 |
| 18PE0030CONSTRUCTION OF CONCRETE ROAD - BAGUIO-BONTOC ROAD JCT. TO GUIWENG-NAWAL-TICKEY-DACLAN ROAD IN SUPPORT OF COFFEE, AND PROCESSED FOOD MEAT INDUSTRIES, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱28.9M | 100% | High risk72 | —-0.027 |
| 18PF0023NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱15.4M | 100% | High risk72 | —-0.028 |
| 18PF0030ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, KAPANGAN, KIBUNGAN AND BAKUN, BENGUET, K0337+216 - K0337+238, K0337+930 - K0337+960, K0337+982 - K0337+99 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱16.6M | 100% | High risk72 | —-0.028 |
| 17PF0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF BAGUYOS FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.043 |
| 23B00056OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | Region II | On-Going | ₱182.6M | 72% | High risk65 | Flagged0.007 |
| 23P00020CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL WITHIN CHICO RIVER BASIN, STA. 37+995 - STA. 39+300 (L/S), CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱115.8M | 100% | High risk64 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00011CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱190M | 50% | High risk93 | Flagged0.026 |
| 25P00024CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN SECTION, STA. 37+926 - STA. 39+239 (LEFT SIDE), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 0% | High risk93 | Flagged0.024 |
| 25P00018CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 40% | High risk93 | Flagged0.014 |
| 23B00056OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | Region II | On-Going | ₱182.6M | 72% | High risk65 | Flagged0.007 |
| 25P00014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.) | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 87% | High risk93 | Flagged0.006 |
| 25P00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (L/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 89% | High risk93 | Flagged0.006 |
| 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
| 25P00023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTION,STA. 34+414 - 35+489 (R.S.), BARANGAY RIPANG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95.1M | 86% | High risk93 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 19PE0024CONSTRUCTION OF MISSING LINKS / NEW ROADS: CONSTRUCTION OF CONCRETE ROAD - SPECIFIC LOCATIONS ALONG BAGUIO-LA TRINIDAD-ITOGON- SABLAN-TUBA & TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUET, BO | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱83.6M | 100% | Medium risk52 | —-0.079 |
| 77 | 23PI0001CONSTN OF MONAMON SUR AND MONAMON NORTE FLOOD CONTROL, BEBE-SAEW SECTION, STA. 70+440-STA.71+450 (RS) ALONG CHICO RIVER, BAUKO, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱86.9M | 100% | Medium risk52 | —-0.062 |
| 78 | 18PF0021CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS NRJ BULALACAO-CABACAB-SINTO ROAD LEADING TO AGRI-TOURISM FARMS, BRGY. BULALACAO, MANKAYAN, BENGUET (STA. 340+400 STA. 343+400) | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱84.1M | 100% | Medium risk52 | —-0.075 |
| 79 | 19PF0016CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF BAGUYOS FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱77.2M | 100% | Medium risk51 | —-0.066 |
| 80 | 23A00251REPLACEMENT OF PERMANENT WEAK BRIDGES - NILANGOYAN BR. (B02628LZ) ALONG MANILA NORTH RD | Region I | Region I | Completed | ₱54M | 100% | Medium risk50 | —-0.048 |
| 81 | 24A00052CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROSARIO BYPASS ROAD, LA UNION | Region I | Region I | Completed | ₱81.3M | 100% | Medium risk50 | —-0.079 |
| 82 | 22A00076CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SANTOL (LA UNION) - KIBUNGAN (BENGUET) ROAD, LA UNION | Region I | Region I | Completed | ₱57.9M | 100% | Medium risk50 | —-0.083 |
| 83 | 21PI0090REHAB/RECONSTN OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, BAGUIO - BONTOC RD K0362+650 - K0362+730 | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱48.3M | 100% | Medium risk49 | —-0.084 |
| 84 | 21PE0046RECONSTRUCTION TO CONCRETE PAVEMENT - SHILAN - BECKEL RD - K0261+(-196) - K0261+050, K0262+890 - K0264+474, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱51.8M | 100% | Medium risk49 | —-0.080 |
| 85 | 20PE0081CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE: ALONG BAGUIO - BAUANG ROAD (S00397LZ) | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱48.5M | 100% | Medium risk48 | —-0.080 |
| 86 | 18PF0034ASSET PRESERVATION REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG BAGUIO-BONTOC ROAD, K0322+600 K0322+630, K0323+950 K0323+980, K0324+150 K0324+200, K0325+500 K0325+530, K0325+600 K0325+650, K03 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱47.9M | 100% | Medium risk48 | —-0.082 |
| 87 | 21PF0089ROAD SLOPE PROTECTION PROJECT ALONG GOVERNOR BADO DANGWA NATIONAL ROAD, MAYUS, POBLACION, KIBUNGAN, BENGUET, K0320+442 - K0320+592 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱48.9M | 100% | Medium risk48 | —-0.081 |
| 88 | 18PF0019CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: ABATAN-MANKAYAN-CERVANTES ROAD JUNCTION TO TABIO-BEDBED-BAGUINGEY-SAYAPOT ROAD IN SUPPORT OF COFFEE, BAMBOO, FOOD AND FEED CROPS, PLANTATION CROPS, CUTFLOWERS AND F | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱50.5M | 100% | Medium risk48 | —-0.082 |
| 89 | 19PF0010ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT ABATAN-MANKAYAN-CERVANTES ROAD (TERTIARY), K0334+(-749)-K0334+010, K0340+380-K0341+000, K0341+500-K0341+600, K0348+100-K0350+ | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱50.8M | 100% | Medium risk48 | —-0.084 |
| 90 | 21PC0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILTATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPES COLLAPSE AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN KABUGAO ROAD K0628+406-K0628+556 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱49.5M | 100% | Medium risk48 | —-0.072 |
| 91 | 24AF0012CONST./REHAB OF FLOOD MIT FACILITIES W/IN MAJOR BASINS AND PRINCIPAL RIVERS-CONST FLOOD MIT STRUC - CONST OF FLOOD CONTROL STRUC ALONG ARINGAY RIVER BASIN, TUBAO, LU (PACKAGE 8) | Region I | La Union 2nd DEO | Completed | ₱48.9M | 100% | Medium risk48 | —-0.065 |
| 92 | 24AF0013CONST/REHAB OF FLOOD MIT FACILITIES W/IN MAJOR BASINS & PRINCIPAL RIVERS - CONST OF FLOOD MIT STRUCTURE - CONST OF FLOOD CONT STRUC ALONG ARINGAY RIVER BASIN, BRGY. PIDEG, TUBAO, LU | Region I | La Union 2nd DEO | Completed | ₱48.9M | 100% | Medium risk47 | —-0.065 |
| 93 | 24AF0018CONST/REHAB OF FLOOD MIT FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS -CONST OF FLOOD MIT STRUCTURE - CONST OF FLOOD CONTROL STRUC ALONG ARINGAY RIVER BASIN, BRGY. LINAPEW, TUBAO, LU | Region I | La Union 2nd DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.071 |
| 94 | 19PE0034CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, DUNGON SECTION, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱48.5M | 100% | Medium risk47 | —-0.065 |
| 95 | 23PI0002SIPAG-CONSTN OF CHICO RIVER FLOOD CONTROL, TAMOG-O SECTION | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.068 |
| 96 | 22PG0010CONS'TN./UPGRADING/REHB. OF DRAINAGE ALONG NVA. VIZ-IFU-MT. PROV. RD.-K0293+837,K0294+060,K0295+223,K0313+837,K0314+261,K0318+068,K0318+737,K0318+943,K0318+995,K0319+740,K0319+844-K0320+130,K0320+290, LAMUT,KIANGAN AND LAGAWE, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱30.6M | 100% | Medium risk46 | —-0.079 |
| 97 | 21PJ0019ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDES- TERTIARY ROADS- UBAO- TAANG ROAD- K0399+253- K0399+300, K0399+726- K0399+779, K0402+350-K0402+613, K0402+672- K0402+730, K0402+831- K0402+852, K04 | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱30.2M | 100% | Medium risk46 | —-0.084 |
| 98 | 18PE0038REHABILITATION / MAJOR REPAIR OF BRIDGE - BOLO BR. (B02658LZ) ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0301+(-431), BOKOD, BENGUET, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱6.1M | 100% | Medium risk45 | —-0.046 |
| 99 | 23AF0009CONST/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGYS. PUDOC TO PARIAN ESTE, PHASE 2, BAUANG, LU | Region I | La Union 2nd DEO | Completed | ₱30.9M | 100% | Medium risk45 | —-0.070 |
| 100 | 18PF0032NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0357+000 K0362+890, K0362+903 K0363+503, K0363+054 K0364+200 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱39.1M | 100% | Medium risk45 | —-0.085 |