Contractor dossier
67 projects on file, including joint ventures this contractor is part of.
Total projects
67
Total budget
₱2.3B
Average progress
94.5%
Completion rate
74.6%
Average risk score
47.4
Medium risk on average, out of 100
Flagged as unusual
11
16.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 49 | ₱1.3B | 39.6 | 3 | 99.6% |
| Region XI | 18 | ₱1B | 68.7 | 8 | 80.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 31 | ₱900.5M | 40.7 | 0 | 97.1% |
| Buildings and Facilities | 9 | ₱61M | 16.4 | 0 | 100.0% |
| Flood Control and Drainage | 7 | ₱338.7M | 42.8 | 0 | 93.3% |
| OTHER | 6 | ₱411.3M | 78.5 | 5 | 96.5% |
| GAA 2025 SSP | 4 | ₱240.3M | 94.7 | 3 | 71.6% |
| Bridges | 4 | ₱32.4M | 40.8 | 0 | 100.0% |
| GAA 2025 OO-1 | 3 | ₱185.9M | 93.0 | 3 | 72.4% |
| GAA 2025 OO-2 | 1 | ₱96M | 89.1 | 0 | 88.1% |
| Bridges, Roads | 1 | ₱66.3M | 57.0 | 0 | 96.4% |
| Water Provision and Storage | 1 | ₱3.2M | 29.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LD0145CONSTRUCTION OF FLOOD MITIGATING STUCTURE ALONG BALUTAKAY RIVER LEFT & RIGHT SIDE DOWNSTREAM SECTION OF BALUTAKAY-HAGONOY BRIDGE (B00165MN), BALUTAKAY, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98.9M | 41% | High risk96 | Flagged0.034 |
| 25LJ0034CONSTRUCTION OF ROAD, BARANGAY ALEJAL TO ALEMAG, CARMEN, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱48.2M | 87% | High risk95 | Flagged0.014 |
| 25LG0057CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG LAVIGAN, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱48.3M | 58% | High risk95 | Flagged0.034 |
| 25LI0034ROAD WIDENING - NABUNTURAN - MARAGUSAN ROAD K1465+000 - K1466+327, K1466+739 - K1467+312 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱59.4M | 69% | High risk94 | Flagged0.019 |
| 25L00049CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1381+900 - K1382+108, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱90.1M | 86% | High risk94 | Flagged0.015 |
| 25ND0090CONSTRUCTION OF ROAD, CONNECTING BARANGAY SAN ISIDRO TO BARANGAY ROSARIO, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱44.9M | 100% | High risk93 | —-0.016 |
| 25L00116CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱36.4M | 63% | High risk91 | Flagged0.009 |
| 25NH0051CONST. OF DIKE ALONG TAGO RIVER BASIN, PROTECTING BRGY. POBLACION, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱96M | 88% | High risk89 | —-0.002 |
| 18ND0090CONSTRUCTION OF TWO SCIENCE AND TWO ICT LABORATORIES, TWO-STOREY (8 CLASSROOMS) SCHOOL BUILDING @ PINAMANCULAN NATIONAL HIGH SCHOOL, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱17.6M | 100% | High risk84 | Flagged0.006 |
| 18ND0120CONSTRUCTION OF THREE-STOREY SIX CLASSROOMS SCHOOL BUILDING @ AGUSAN NATIONAL HIGH SCHOOL, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱17.3M | 100% | High risk84 | Flagged0.007 |
| 18N00041CONSTRUCTION OF BYPASS/DIVERSION ROADS, ROSARIO-MARFIL-TAGBINA ROAD, AGUSAN DEL SUR, PACKAGE B, ROSARIO, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱177.3M | 100% | High risk79 | Flagged0.009 |
| 17N00050ROAD UPGRADING (UNPAVED TO PAVED), BUTUAN CITY - TALACOGON - LORETO - VERUELA - STA. JOSEFA RD, K1392+208 - K1396+560, K1389+574 - K1389+716, K1400+897 - K1401+126, TALACOGON, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱144.7M | 100% | High risk77 | —-0.007 |
| 24LI0045CONSTRUCTION OF MULTI-PURPOSE BUILDING AT MONKAYO CENTRAL ES, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱24.7M | 80% | High risk73 | Flagged0.017 |
| 24L00250CONSTRUCTION OF JUNCTION PROVINCIAL ROAD PUROK 4-B, BRGY. MAGSAYSAY, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱29.6M | 99% | High risk73 | Flagged0.007 |
| 25LI0037ROAD WIDENING - NABUNTURAN - MARAGUSAN ROAD K 1453+061 - K1455+563 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱93.5M | 51% | High risk62 | —-0.027 |
| 24L00236CONSTRUCTION OF ROAD, SATURNINO R. SILVA ROAD, CARMEN, DAVAO DEL NORTE PHASE 1 | Region XI | Region XI | Completed | ₱96.2M | 100% | High risk62 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LD0145CONSTRUCTION OF FLOOD MITIGATING STUCTURE ALONG BALUTAKAY RIVER LEFT & RIGHT SIDE DOWNSTREAM SECTION OF BALUTAKAY-HAGONOY BRIDGE (B00165MN), BALUTAKAY, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98.9M | 41% | High risk96 | Flagged0.034 |
| 25LG0057CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG LAVIGAN, GOVERNOR GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱48.3M | 58% | High risk95 | Flagged0.034 |
| 25LI0034ROAD WIDENING - NABUNTURAN - MARAGUSAN ROAD K1465+000 - K1466+327, K1466+739 - K1467+312 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱59.4M | 69% | High risk94 | Flagged0.019 |
| 24LI0045CONSTRUCTION OF MULTI-PURPOSE BUILDING AT MONKAYO CENTRAL ES, POBLACION, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱24.7M | 80% | High risk73 | Flagged0.017 |
| 25L00049CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1381+900 - K1382+108, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱90.1M | 86% | High risk94 | Flagged0.015 |
| 25LJ0034CONSTRUCTION OF ROAD, BARANGAY ALEJAL TO ALEMAG, CARMEN, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱48.2M | 87% | High risk95 | Flagged0.014 |
| 25L00116CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALTERNATE ROAD FROM REGION XI TO REGION X (JCT. DAVAO CITY DIVERSION ROAD - CATALUNAN GRANDE - TALANDAG - SUMIMAO - PAÑALUM - TAPAK - CABANGLASAN - AGLAYAN, MALAYBALAY), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱36.4M | 63% | High risk91 | Flagged0.009 |
| 18N00041CONSTRUCTION OF BYPASS/DIVERSION ROADS, ROSARIO-MARFIL-TAGBINA ROAD, AGUSAN DEL SUR, PACKAGE B, ROSARIO, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱177.3M | 100% | High risk79 | Flagged0.009 |
| 18ND0120CONSTRUCTION OF THREE-STOREY SIX CLASSROOMS SCHOOL BUILDING @ AGUSAN NATIONAL HIGH SCHOOL, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱17.3M | 100% | High risk84 | Flagged0.007 |
| 24L00250CONSTRUCTION OF JUNCTION PROVINCIAL ROAD PUROK 4-B, BRGY. MAGSAYSAY, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱29.6M | 99% | High risk73 | Flagged0.007 |
| 18ND0090CONSTRUCTION OF TWO SCIENCE AND TWO ICT LABORATORIES, TWO-STOREY (8 CLASSROOMS) SCHOOL BUILDING @ PINAMANCULAN NATIONAL HIGH SCHOOL, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱17.6M | 100% | High risk84 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24LI0124RECONSTRUCTION/REHABILITATION OF DAMAGED PAVED ROAD (APPROACH SLAB AT BANGOY BRIDGE) - MONTEVISTA-COMPOSTELA-MATI BOUNDARY (K1438+427 - K1438+427 -K1438+577), BRGY. SAN ROQUE, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱18.5M | 100% | Medium risk46 | —-0.047 |
| 27 | 17NC0025REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG NRJ CUEVAS-SAMPAGUITA ROAD K1373+213 - K1375+320, STA. JOSEFA, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱48.9M | 100% | Medium risk46 | —-0.037 |
| 28 | 17NB0102IMPROVEMENT/WIDENING OF NATIONAL ROADS N1, DAANG MAHARLIKA (AGUSAN-DAVAO SECTION), K1266+620.00 - K1268+003.00, BAYUGAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱28.9M | 100% | Medium risk46 | —-0.050 |
| 29 | 25LD0064CONSTRUCTION OF DRAINAGE STRUCTURE, OUTFALL TO DIGOS- MAKAR ROAD, SULOP, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱29.2M | 66% | Medium risk46 | —-0.028 |
| 30 | 17NC0030CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NRJ SAN FRANCISCO-BAHI-BAROBO ROAD (S00463MN) K1309+(-)402 - K1309+(-)209; K1309+(-)209-K1309+(-)163; K1309+(-)1309+(-)063; K1309+371-K1309+443, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.047 |
| 31 | 19NA0014CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION IMPROVEMENT OF GUIHAO-AN RIVER BANK PROTECTION ALONG GUIHAO-AN BRIDGE WITH RECHANNELIZATION, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱58.3M | 100% | Medium risk43 | —-0.070 |
| 32 | 18NC0049ROAD WIDENING OF NATIONAL ROADS ALONG NRJ SAN FRANCISCO-BAHI-BAROBO ROAD INC. ROW (S00463MN) K1312+509 - K1313+355, K1313+570 - K1314+178, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱52.3M | 100% | Medium risk42 | —-0.079 |
| 33 | 17NB0002REHAB/MAJOR REP. OF AGUSIPAN BRIDGE ALONG BTUAN CTY-TLACGON-LORETO-VRUELA-STA.JOSEFA, TALACOGON ADS | Region XIII | Agusan del Sur 1st DEO | Completed | ₱6.9M | 100% | Medium risk42 | —-0.024 |
| 34 | 18NC0039RETROFITTING/STRENGTHENING OF SINGANAN BRIDGE (B0092MN) ALONG DAANG MAHARLIKA ROAD (AGUSAN-DAVAO SECTION) K1343+605 - K1343+629.80, BUNAWAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱9.8M | 100% | Medium risk42 | —-0.043 |
| 35 | 25ND0088CONSTRUCTION OF ROAD, CONNECTING BARANGAY DURIAN TO BARANGAY CASIKLAN, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱41M | 100% | Medium risk40 | —-0.087 |
| 36 | 18NB0040WIDENING OF BRIDGE UBAAN BR. (B01796MN) ALONG BUTUAN-CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA ROAD, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱9.3M | 100% | Medium risk40 | —-0.045 |
| 37 | 18NB0041WIDENING OF BRIDGE AGIABAO BR. (B01797MN) ALONG BUTUAN-CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA ROAD (PHASE II), SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱6.4M | 100% | Medium risk40 | —-0.045 |
| 38 | 22NG0043CONSTRUCTION OF CAMPO-CABUGAO FLOOD CONTROL STRUCTURE/BRGY. CABUGAO, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱48.5M | 100% | Medium risk40 | —-0.069 |
| 39 | 23ND0070CONSTRUCTION OF ROAD WITH STREET LIGHTS, SITIO BOKBOKON, BARANGAY LAWAN-LAWAN, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.086 |
| 40 | 23ND0012CONSTRUCTION OF ROAD, PUROK 5, BARANGAY TANDANG SORA, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.086 |
| 41 | 19NC0073CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION OF NRJ PASTA-BUENASUERTE-CAIMPOGAN PEAT SWAMP FOREST & AGUSAN MARSH WILDLIFE SANCTUARY, SAN FRACNSICO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱39.2M | 100% | Medium risk39 | —-0.080 |
| 42 | 18NA0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONSTRUCTION/IMPROVEMENT OF GUIHAO-AN RIVER BANK PROTECTION ALONG GUIHAO-AN BRIDGE WITH RECHANNELIZATION, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱25.9M | 100% | Medium risk39 | —-0.071 |
| 43 | 19NC0045CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES OF HUBANG BRGY. ROAD CONNECTING KAAGAPMUCO PROCESSING PLANT AND NATIONAL HIGHWAY IN SUPPORT TO COCONUT ID 0+000 - 0+500, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱14.7M | 100% | Medium risk39 | —-0.080 |
| 44 | 25ND0018BRGY. MANINGALAO AND DURIAN, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱9.6M | 100% | Medium risk39 | —-0.086 |
| 45 | 23ND0071CONSTRUCTION OF ROAD, DANKIAS DANAPA ROAD FROM PUROK 3 GOING TO PUROK 7, BARANGAY DANKIAS, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱6.9M | 100% | Medium risk38 | —-0.085 |
| 46 | 18NC0061OFF CARRAGE IMPROVEMENT ALONG NRJ SAN FRANCISCO-BAHI-BAROBO ROAD (S00463MN) K1309+793 - K1310+889, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱11.8M | 100% | Medium risk38 | —-0.080 |
| 47 | 24ND0124CONCRETING OF PUROK 8 TO PUROK 10, BRGY. DUMALAGAN FMR, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱29.3M | 100% | Medium risk38 | —-0.034 |
| 48 | 18NC0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, CABANTAO ROAD LEADING TO MAANGHIT CAVE & PANGANAN FALLS 0+000 - 0+590, ROSARIO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱19.6M | 100% | Medium risk38 | —-0.078 |
| 49 | 25NH0053CONSTRUCTION OF ROAD, PUROK 7A TO CEMETERY, BARANGAY MABAHIN, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱14.6M | 94% | Medium risk38 | —-0.047 |
| 50 | 20NC0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES AND INDUSTRIES AND ECONOMIC ZONES OF TUGPAN-KIUNYAP ROAD CONNECTION RUBBER, BANANA AND WOOD PLANTATION SITES AND NATIONAL ROAD JUNCTION IN SUPPORT TO RUBBER, BANANA AND WOOD INDUSTRIES, VERUELA, | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk38 | —-0.077 |