Opening the dossier…
Opening the dossier…
Contractor dossier
38 projects on file, including joint ventures this contractor is part of.
Total projects
38
Total budget
₱3B
Average progress
96.4%
Completion rate
78.9%
Average risk score
54.0
Medium risk on average, out of 100
Flagged as unusual
9
23.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 15 | ₱825.3M | 42.6 | 1 | 100.0% |
| Region XI | 7 | ₱640.5M | 57.6 | 3 | 96.9% |
| Region XIII | 6 | ₱777.7M | 58.7 | 4 | 90.9% |
| Region VI | 4 | ₱130.9M | 59.9 | 0 | 100.0% |
| Cordillera Administrative Region | 2 | ₱232.4M | 70.9 | 0 | 100.0% |
| Region I | 2 | ₱178.3M | 67.1 | 0 | 100.0% |
| Region X | 1 | ₱39.2M | 71.8 | 0 | 100.0% |
| Region II | 1 | ₱192.9M | 67.9 | 1 | 39.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 11 | ₱840.4M | 57.3 | 1 | 100.0% |
| Flood Control and Drainage | 10 | ₱219.9M | 34.8 | 0 | 100.0% |
| OTHER | 6 | ₱474.9M | 76.1 | 2 | 96.6% |
| Bridges | 4 | ₱369.2M | 58.1 | 2 | 83.7% |
| Bridges, Roads | 4 | ₱750.2M | 57.0 | 2 | 98.3% |
| Buildings and Facilities | 2 | ₱27.3M | 29.7 | 1 | 100.0% |
| GAA 2025 SSP | 1 | ₱335.3M | 95.7 | 1 | 55.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 22N00072CONSTRUCTION OF KAWAYAN BRIDGE, BARANGAY LANGASIAN, LA PAZ, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱193M | 90% | High risk80 | Flagged0.043 |
| 17P00008ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) MT. PROVINCE - ISABELA ROAD, CHAINAGE 16173 - CHAINAGE 18800 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱106.2M | 100% | High risk80 | —-0.010 |
| 24L00061CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, DOWNSTREAM OF KALAW BRIDGE (LEFT SIDE), BARANGAY SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱71.7M | 90% | High risk77 | Flagged0.020 |
| 16GD0091NET DEVT-IMPR/WIDENING OF NATL RDS-TER RDS JCT NATL RD-MIANAY-DUYOC-CALAAN-PANTN RD-K0103+(-)128 ETC | Region VI | Capiz 1st DEO | Completed | ₱45.8M | 100% | High risk75 | —-0.031 |
| 17GA0049CONST. & MAINT. OF BRIDGES ALONG NAT'L RDS. WIDENING OF PERMANENT BRIDGES INCL. RROW-TO MORE THAN 2 | Region VI | Aklan DEO | Completed | ₱19M | 100% | High risk73 | —-0.018 |
| 17CL0081OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY-OLONGAPO-BUGALLON RD - KO176+600-KO179+00 | Region III | Zambales 1st DEO | Completed | ₱60.7M | 100% | High risk73 | —-0.057 |
| 17KL0031WIDENING OF PERMANENT BRIDGES INCLUDING ROW TO MORE THAN 2 LANES, SAN ANTONIO BRIDGE (B01111MN) ALON | Region X | Misamis Oriental 2nd DEO | Completed | ₱39.2M | 100% | High risk72 | —-0.037 |
| 24B00006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALCALA-SANTO NIÑO-LASAM ROAD (ALCALA BRIDGE), PACKAGE 1, CAGAYAN | Region II | Region II | On-Going | ₱192.9M | 39% | High risk68 | Flagged0.028 |
| 22L00076REPLACEMENT OF BRIDGES - NRJ PANABO CITY - JCT. FATIMA - MALABOG ROAD, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱205.9M | 93% | High risk68 | Flagged0.011 |
| 17A00010REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT -4(HDM-4), ILOCOS NORTE-ABRA ROAD, K0511+000 - K0511+251; K0511+665 - K0511+753; K0511+769 - | Region I | Region I | Completed | ₱127.6M | 100% | High risk67 | —-0.030 |
| 17AB0046REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL RDS INCL DRAINAGE BASED ON PAVEMENT MNGT SYS HW DEVT MNGT-4 (HDM-4) 1. I.N-ABRA ROAD, KO509+520 - KO510+100, 2.I.N-ABRA ROAD, KO522+000 - KO523+000, 3.I.N-ABRA ROAD, KO523+901 - KO524+301 | Region I | Ilocos Norte 2nd DEO | Completed | ₱50.7M | 100% | High risk67 | —-0.046 |
| 17CL0036OFF- CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY, OLONGAPO- BUGALLON RD. K0210+100- K0211 | Region III | Zambales 1st DEO | Completed | ₱42.5M | 100% | High risk67 | —-0.059 |
| 16C00081CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REPLACEMENT OF PERMANENT WEAK BRIDGES, MARIVELES BRIDGE (BO1591LZ) ALONG MARIVELES-TALAGA BAY ROAD, BATAAN 2ND LEGISLATIVE DISTRICT, PROVINCE OF BATAAN | Region III | Region III | Terminated | ₱31.3M | 100% | High risk63 | Flagged0.004 |
| 17P00044ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) JCT. TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD, CHAINAGE 458 - CHAINAGE 2720, CHAINAGE 2940 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱126.2M | 100% | High risk62 | —-0.030 |
| 17N00166ROAD CONSTRUCTION FROM BRGY. MAHANUB - POYAWON ROAD WITH BRIDGE COMPONENT PHASE 3A, ALEGRIA - GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱212.3M | 100% | High risk62 | Flagged0.027 |
| 18L00081CONST. OF DRAINAGE ALONG TAGUM-PANABO CIRCUMFERENTIAL ROAD, K1459+850-K1462+660, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱116.2M | 100% | High risk61 | —-0.072 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 22N00072CONSTRUCTION OF KAWAYAN BRIDGE, BARANGAY LANGASIAN, LA PAZ, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱193M | 90% | High risk80 | Flagged0.043 |
| 24B00006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALCALA-SANTO NIÑO-LASAM ROAD (ALCALA BRIDGE), PACKAGE 1, CAGAYAN | Region II | Region II | On-Going | ₱192.9M | 39% | High risk68 | Flagged0.028 |
| 17N00166ROAD CONSTRUCTION FROM BRGY. MAHANUB - POYAWON ROAD WITH BRIDGE COMPONENT PHASE 3A, ALEGRIA - GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱212.3M | 100% | High risk62 | Flagged0.027 |
| 24L00061CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, DOWNSTREAM OF KALAW BRIDGE (LEFT SIDE), BARANGAY SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱71.7M | 90% | High risk77 | Flagged0.020 |
| 16NG0052CONSTRUCTION OF 2 UNITS OF 2 STY 6 CLR SCHOOL BUILDING, DEL CARMEN NHS, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Terminated | ₱442.4K | 100% | Medium risk34 | Flagged0.013 |
| 17LC0340REBLOCKING W/ ASPHALT OVERLAY AND THERMOPLASTIC PAVEMENT MARKINGS ALONG AGUSAN-DAVAO ROAD (DAANG MAHARLIKA RD.), S00060MN, K1456+000-K1458+158, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱69.2M | 100% | Medium risk45 | Flagged0.011 |
| 22L00076REPLACEMENT OF BRIDGES - NRJ PANABO CITY - JCT. FATIMA - MALABOG ROAD, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱205.9M | 93% | High risk68 | Flagged0.011 |
| 16C00081CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REPLACEMENT OF PERMANENT WEAK BRIDGES, MARIVELES BRIDGE (BO1591LZ) ALONG MARIVELES-TALAGA BAY ROAD, BATAAN 2ND LEGISLATIVE DISTRICT, PROVINCE OF BATAAN | Region III | Region III | Terminated | ₱31.3M | 100% | High risk63 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 2 | 22N00072CONSTRUCTION OF KAWAYAN BRIDGE, BARANGAY LANGASIAN, LA PAZ, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱193M | 90% | High risk80 | Flagged0.043 |
| 3 | 17P00008ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) MT. PROVINCE - ISABELA ROAD, CHAINAGE 16173 - CHAINAGE 18800 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱106.2M | 100% | High risk80 | —-0.010 |
| 4 | 24L00061CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, DOWNSTREAM OF KALAW BRIDGE (LEFT SIDE), BARANGAY SAN JOSE, MONKAYO, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱71.7M | 90% | High risk77 | Flagged0.020 |
| 5 | 16GD0091NET DEVT-IMPR/WIDENING OF NATL RDS-TER RDS JCT NATL RD-MIANAY-DUYOC-CALAAN-PANTN RD-K0103+(-)128 ETC | Region VI | Capiz 1st DEO | Completed | ₱45.8M | 100% | High risk75 | —-0.031 |
| 6 | 17GA0049CONST. & MAINT. OF BRIDGES ALONG NAT'L RDS. WIDENING OF PERMANENT BRIDGES INCL. RROW-TO MORE THAN 2 | Region VI | Aklan DEO | Completed | ₱19M | 100% | High risk73 | —-0.018 |
| 7 | 17CL0081OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY-OLONGAPO-BUGALLON RD - KO176+600-KO179+00 | Region III | Zambales 1st DEO | Completed | ₱60.7M | 100% | High risk73 | —-0.057 |
| 8 | 17KL0031WIDENING OF PERMANENT BRIDGES INCLUDING ROW TO MORE THAN 2 LANES, SAN ANTONIO BRIDGE (B01111MN) ALON | Region X | Misamis Oriental 2nd DEO | Completed | ₱39.2M | 100% | High risk72 | —-0.037 |
| 9 | 24B00006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALCALA-SANTO NIÑO-LASAM ROAD (ALCALA BRIDGE), PACKAGE 1, CAGAYAN | Region II | Region II | On-Going | ₱192.9M | 39% | High risk68 | Flagged0.028 |
| 10 | 22L00076REPLACEMENT OF BRIDGES - NRJ PANABO CITY - JCT. FATIMA - MALABOG ROAD, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱205.9M | 93% | High risk68 | Flagged0.011 |
| 11 | 17A00010REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT -4(HDM-4), ILOCOS NORTE-ABRA ROAD, K0511+000 - K0511+251; K0511+665 - K0511+753; K0511+769 - | Region I | Region I | Completed | ₱127.6M | 100% | High risk67 | —-0.030 |
| 12 | 17AB0046REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL RDS INCL DRAINAGE BASED ON PAVEMENT MNGT SYS HW DEVT MNGT-4 (HDM-4) 1. I.N-ABRA ROAD, KO509+520 - KO510+100, 2.I.N-ABRA ROAD, KO522+000 - KO523+000, 3.I.N-ABRA ROAD, KO523+901 - KO524+301 | Region I | Ilocos Norte 2nd DEO | Completed | ₱50.7M | 100% | High risk67 | —-0.046 |
| 13 | 17CL0036OFF- CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY, OLONGAPO- BUGALLON RD. K0210+100- K0211 | Region III | Zambales 1st DEO | Completed | ₱42.5M | 100% | High risk67 | —-0.059 |
| 14 | 16C00081CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REPLACEMENT OF PERMANENT WEAK BRIDGES, MARIVELES BRIDGE (BO1591LZ) ALONG MARIVELES-TALAGA BAY ROAD, BATAAN 2ND LEGISLATIVE DISTRICT, PROVINCE OF BATAAN | Region III | Region III | Terminated | ₱31.3M | 100% | High risk63 | Flagged0.004 |
| 15 | 17P00044ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) JCT. TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD, CHAINAGE 458 - CHAINAGE 2720, CHAINAGE 2940 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱126.2M | 100% | High risk62 | —-0.030 |
| 16 | 17N00166ROAD CONSTRUCTION FROM BRGY. MAHANUB - POYAWON ROAD WITH BRIDGE COMPONENT PHASE 3A, ALEGRIA - GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱212.3M | 100% | High risk62 | Flagged0.027 |
| 17 | 18L00081CONST. OF DRAINAGE ALONG TAGUM-PANABO CIRCUMFERENTIAL ROAD, K1459+850-K1462+660, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱116.2M | 100% | High risk61 | —-0.072 |
| 18 | 18C00019NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROAD, CAPAS-BOTOLAN ROAD, ZAMBALES 2ND LEGISLATIVE DISTRICT, PROVINCE OF ZAMBALES | Region III | Region III | Completed | ₱240.3M | 100% | Medium risk55 | —-0.034 |
| 19 | 16NF0159CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM MAYAG FLOOD CONTROL, MAINIT, SURIGAO DEL NORTE K 0+034 - K 0+180 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.8M | 100% | Medium risk55 | —-0.046 |
| 20 | 17L00103WIDENING (4-5 INTO 6 LANES) OF DAANG MAHARLIKA (MN) INCL. RROW DAVAO CITY 2ND LD, K1489+857-K1489+10 | Region XI | Region XI | Completed | ₱60.2M | 100% | Medium risk53 | —-0.028 |
| 21 | 20CL0047CONSTRUCTION OF PUNDAQUIT BRIDGE, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.5M | 100% | Medium risk52 | —-0.049 |
| 22 | 22L00052CONSTRUCTION OF CONCRETE BRIDGE - MONTEVISTA (JCT. MAYAON) - LAAK DIVERSION RD., DAVAO DE ORO | Region XI | Region XI | On-Going | ₱49.4M | 96% | Medium risk50 | —-0.000 |
| 23 | 17L00148CONST. OF DRAINAGE (INCLUDING LENGTH GOING TO OUTFALL ALONG DAANG MAHARLIKA, DAVAO DEL NORE 1ST LD | Region XI | Region XI | Completed | ₱67.8M | 100% | Medium risk50 | —-0.043 |
| 24 | 18GG0007CONSTRUCTION OF FLOOD CONTROL / SLOPE PROTECTION BESIDE BAROTAC NUEVO HOSPITAL IN BRGY. TABUCAN, BAROTAC NUEVO, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱23.2M | 100% | Medium risk46 | —-0.072 |
| 25 | 18GG0003CONCRETING OF TIWI-TALISAY-LAMINTAO ROAD LEADING TO FISHPORT TO BANATE PORT, BAROTAC NUEVO, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱42.8M | 100% | Medium risk46 | —-0.085 |