Contractor dossier
223 projects on file, including joint ventures this contractor is part of.
Total projects
223
Total budget
₱6B
Average progress
96.3%
Completion rate
72.2%
Average risk score
51.7
Medium risk on average, out of 100
Flagged as unusual
7
3.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 223 | ₱6B | 51.7 | 7 | 96.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 129 | ₱3.7B | 48.4 | 1 | 96.5% |
| Buildings and Facilities | 39 | ₱476.3M | 45.2 | 0 | 98.4% |
| Flood Control and Drainage | 27 | ₱1B | 52.2 | 0 | 98.3% |
| GAA 2025 SSP | 9 | ₱140.2M | 94.7 | 3 | 86.3% |
| OTHER | 9 | ₱218.8M | 74.6 | 3 | 86.3% |
| Bridges | 8 | ₱249.9M | 49.1 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱187.2M | 95.7 | 0 | 87.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DJ0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF QUEZON INDUSTRIAL HIGHWAY | Region IV-A | Quezon 2nd DEO | On-Going | ₱94.5M | 62% | High risk96 | Flagged0.014 |
| 25DM0088ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0232+379 - K0233+700, K0234+371 - K0236+ 850, K0237+789 - K0238+200 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 77% | High risk96 | —-0.001 |
| 25DM0087ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0227 + 050 - K0228 + 950, K0245 + 100 - K0246 + 100 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 97% | High risk96 | —-0.007 |
| 25DJ0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SAMPALOC 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 97% | High risk95 | —-0.007 |
| 25DJ0133CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY 5, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 63% | High risk95 | Flagged0.007 |
| 25DJ0088CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY GULANG-GULANG, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | —-0.009 |
| 25DJ0085CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY IBABANG DUPAY, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | —-0.009 |
| 25DJ0126CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANGGALANG TULO-TULO, SARIAYA, QUEZ | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | —-0.008 |
| 25DJ0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SANTO CRISTO, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 100% | High risk95 | —-0.009 |
| 25DJ0124CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT FOR RECTO MEMORIAL NATIONAL HIGH SCHOOL), BRGY. QUIPOT, TIA | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.6M | 62% | High risk94 | Flagged0.007 |
| 25DJ0121CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SAN JUAN, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.2M | 94% | High risk94 | —-0.005 |
| 23DJ0161CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOM SCHOOL BUILDING AT LUCENA CITY NATIONAL HIGH SCHOOL-MAYAO CROSSING EXTENSION, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱18.3M | 98% | High risk87 | Flagged0.044 |
| 25DJ0117CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN), QUEZON ECO-TOURISM-COTTA-DALAHICAN-TALAO-TALAO-MAYAO ROAD, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱93.6M | 51% | High risk79 | Flagged0.004 |
| 24DJ0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN), QUEZON-ECO-TOURISM-COTTA-DALAHICAN-TALAO-TALAO-MAYAO ROAD, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱19.6M | 56% | High risk75 | Flagged0.006 |
| 24DJ0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, PUROK BAGONG BUHAY, BRGY. IBABANG TALIM, LUCE | Region IV-A | Quezon 2nd DEO | On-Going | ₱5M | 92% | High risk74 | —-0.007 |
| 24DJ0011CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MAGSAYSAY, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱5M | 96% | High risk72 | —-0.004 |
| 24DJ0067OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS, CANDELARIA BYPASS RD-K0106+707.5 - K0106+834, K0106+882-K0106+935 | Region IV-A | Quezon 2nd DEO | On-Going | ₱16.4M | 100% | High risk72 | —-0.011 |
| 24DJ0069OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROADS, LUTUCAN-GUISGUIS PORT RD-K0116+043 - K0116+421 | Region IV-A | Quezon 2nd DEO | On-Going | ₱19.6M | 95% | High risk72 | —-0.008 |
| 24DJ0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, GOVERNMENT COMPLEX, BARANGAY BULAKIN II, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.9M | 76% | High risk71 | —-0.028 |
| 24DJ0071OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING- TERTIARY ROADS, SN PABLO BDRY-DOLORES-PINAGDANLAYAN RD-K0099+175-K0099+486 | Region IV-A | Quezon 2nd DEO | On-Going | ₱17.2M | 92% | High risk71 | —-0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23DJ0161CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOM SCHOOL BUILDING AT LUCENA CITY NATIONAL HIGH SCHOOL-MAYAO CROSSING EXTENSION, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱18.3M | 98% | High risk87 | Flagged0.044 |
| 25DJ0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF QUEZON INDUSTRIAL HIGHWAY | Region IV-A | Quezon 2nd DEO | On-Going | ₱94.5M | 62% | High risk96 | Flagged0.014 |
| 24DJ0189CONCRETING OF BRGY. ANTIPOLO FMR, BRGY. ANTIPOLO, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.7M | 86% | High risk61 | Flagged0.014 |
| 25DJ0124CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY (COVERED COURT FOR RECTO MEMORIAL NATIONAL HIGH SCHOOL), BRGY. QUIPOT, TIA | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.6M | 62% | High risk94 | Flagged0.007 |
| 25DJ0133CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY 5, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 63% | High risk95 | Flagged0.007 |
| 24DJ0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN), QUEZON-ECO-TOURISM-COTTA-DALAHICAN-TALAO-TALAO-MAYAO ROAD, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱19.6M | 56% | High risk75 | Flagged0.006 |
| 25DJ0117CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN), QUEZON ECO-TOURISM-COTTA-DALAHICAN-TALAO-TALAO-MAYAO ROAD, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱93.6M | 51% | High risk79 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 23DJ0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY ANTIPOLO, SARIAYA TO BARANGAY SALINAS, | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.105 |
| 177 | 24DJ0024CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, IMMACULADA CONCEPCION, BARANGAY ISABANG, LUCENA | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.106 |
| 178 | 24DJ0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY CONCEPCION 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.106 |
| 179 | 23DJ0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY LUTUCAN BATA, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.106 |
| 180 | 22DJ0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, CONSTRUCTION OF ROAD, BARANGAY IBABANG IYAM, L | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.107 |
| 181 | 21DJ0004LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, BARANGAY TALAAN PANTOC, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.107 |
| 182 | 22DJ0028CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY MANGGALANG TULO-TULO, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.107 |
| 183 | 22DJ0017CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY LUTUCAN MALABAG, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 184 | 23DJ0059CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANGILAG SUR, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 185 | 23DJ0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BRGY. MAMALA 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱5M | 96% | Medium risk46 | —-0.059 |
| 186 | 24DJ0043CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES, CONSTRUCTION OF ROAD, BARANGAY PILI, SARIAYA, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.106 |
| 187 | 22DJ0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SAMPALOC I, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.107 |
| 188 | 23DJ0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, PUROK BAGONG SILANG, WESTLAND PHASE 2, BARANGAY | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 189 | 23DJ0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANGILAG NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 190 | 23DJ0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, SITIO DULONG ILAYA, BARANGAY CONCEPCION PINAG | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 191 | 23DJ0092CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MASALUKOT 3, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.109 |
| 192 | 20DM0005ASSET PRESERVATION: PREVENTIVE MAINTENANCE - SECONDARY ROADS - MULANAY - SN FRANCISCO RD - K0287+285 - 288+894, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱11.7M | 100% | Medium risk46 | —-0.106 |
| 193 | 24DJ0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANGGALANG KILING, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.107 |
| 194 | 23DJ0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BRGY. MANGGALANG 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 195 | 24DJ0176CONSTRUCTION OF 3-STOREY, 12-CLASSROOM SCHOOL BUILDING IN NIING ELEMENTARY SCHOOL, BARANGAY NIING, SAN ANTONIO, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | On-Going | ₱29.3M | 100% | Medium risk46 | —-0.016 |
| 196 | 23DJ0160CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT LUCENA SOUTH II ELEMENTARY SCHOOL, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱33.4M | 100% | Medium risk45 | —-0.049 |
| 197 | 24DJ0156COMPLETION OF 3STY12CL, DAGATAN NATIONAL HIGH SCHOOL, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱5.9M | 100% | Medium risk44 | —-0.020 |
| 198 | 19DK0163CONSTRUCTION OF THREE(3) STOREY LABORATORY QUEZON SCIENCE HIGH SCHOOL, TAYABAS CITY-QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱27.2M | 100% | Medium risk43 | —-0.031 |
| 199 | 20DJ0063CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM ACADEMIC SCHOOL BUILDING AT MANGALANG I ELEMENTARY SCHOOL, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱16.5M | 100% | Medium risk43 | —-0.056 |
| 200 | 23DJ0163CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT KINATIHAN I ES, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.4M | 100% | Medium risk43 | —-0.061 |