Contractor dossier
263 projects on file, including joint ventures this contractor is part of.
Total projects
263
Total budget
₱12B
Average progress
90.3%
Completion rate
67.7%
Below 70%
Average risk score
48.9
Medium risk on average, out of 100
Flagged as unusual
35
13.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 231 | ₱9B | 47.6 | 34 | 89.3% |
| Region X | 18 | ₱1.6B | 58.3 | 0 | 97.7% |
| Region II | 4 | ₱386M | 54.7 | 0 | 100.0% |
| Cordillera Administrative Region | 3 | ₱272.2M | 57.4 | 0 | 93.2% |
| Negros Island Region | 2 | ₱193M | 70.5 | 0 | 100.0% |
| Region III | 2 | ₱193M | 62.2 | 0 | 100.0% |
| Region XII | 2 | ₱192.1M | 40.3 | 0 | 100.0% |
| Region XIII | 1 | ₱144.3M | 94.2 | 1 | 96.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 89 | ₱3.9B | 45.4 | 3 | 83.6% |
| Buildings and Facilities | 68 | ₱710.5M | 32.2 | 1 | 98.0% |
| Flood Control and Drainage | 51 | ₱4.3B | 56.4 | 1 | 96.7% |
| OTHER | 17 | ₱1.1B | 79.4 | 14 | 89.5% |
| Water Provision and Storage | 10 | ₱33.8M | 26.0 | 0 | 98.9% |
| GAA 2025 SSP | 9 | ₱635.4M | 95.4 | 9 | 70.2% |
| GAA 2025 OO-2 | 8 | ₱929.9M | 93.4 | 5 | 69.6% |
| Bridges | 7 | ₱39.8M | 33.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱185.9M | 92.9 | 2 | 61.0% |
| Bridges, Roads | 2 | ₱165.4M | 62.6 | 0 | 99.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0142CONSTRUCTION OF ROAD, FROM JUNCTION TO SITIO CABYAWAN BARANGAY MERCEDES, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95M | 54% | High risk96 | Flagged0.039 |
| 25LF0141CONSTRUCTION OF ROAD, FROM JUNCTION SAKUAN TO BARANGAY ALVAR TO SITIO BANTOLINAO BARANGAY PALMA GIL TO SITIO BANTOLINAO, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.1M | 50% | High risk96 | Flagged0.040 |
| 25LF0144CONSTRUCTION OF ROAD, LAMIAWAN-SANGAB ROAD, BARANGAY PICHON CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95M | 56% | High risk96 | Flagged0.039 |
| 25LJ0105CONSTRUCTION OF ROAD, PHASE 2, BARANGAY SAN ISIDRO, BABAK DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱94.9M | 28% | High risk96 | Flagged0.040 |
| 25LK0027CONSTRUCTION OF ROAD, SITIO TABUAN, BARANGAY MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱47.8M | 92% | High risk95 | Flagged0.008 |
| 25LK0030CONSTRUCTION OF ROAD, SITIO MELUYA, BARANGAY MALABOG, PAQUIBATO DISTRICT TO SITIO POLOCON, BARANGAY LAMANAN (MALABOG SECTION), DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱80.2M | 82% | High risk95 | Flagged0.018 |
| 25LK0023CONSTRUCTION OF ROAD, SITIO GATUNGON TO SABANG SITA, BARANGAY TAPAK, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 90% | High risk95 | Flagged0.011 |
| 25LI0036REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, DNAS ROAD AT TABUNAN - TRIBAL VILLAGE, BARANGAY PROSPERIDAD, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱29.4M | 100% | High risk95 | Flagged0.008 |
| 25NG0035SURIGAO - DAVAO COASTAL RD - K1149+000 - K1150+300, K1152+000 - K1154+000, K1174+305 - K1175+405, K1182+000 - K1182+900, PLACER-GIGAQUIT-CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱144.3M | 97% | High risk94 | Flagged0.011 |
| 25L00034REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K1494+731 - K1495+420, DAVAO CITY | Region XI | Region XI | On-Going | ₱31.1M | 80% | High risk94 | Flagged0.017 |
| 25LK0009CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA. 5 + 900 - STA. 6 + 200, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱95.5M | 93% | High risk94 | —-0.005 |
| 25LK0011CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA.7+100 - STA. 7+400, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱95.5M | 93% | High risk94 | —-0.005 |
| 25LK0012CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA. 7 + 700 - STA. 8 + 000, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱95.5M | 98% | High risk94 | —-0.007 |
| 25LI0083CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, DOWNSTREAM OF AUNAN CREEK JUNCTION, PHASE 1, BARANGAY BABAG, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱142.6M | 74% | High risk93 | Flagged0.012 |
| 25LI0018CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM R/S, LEADING TO AGUSAN RIVER, PHASE 2, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.5M | 93% | High risk93 | Flagged0.004 |
| 25LI0079CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CABANBANAN RIVER LEADING TO AGUSAN RIVER, BANTACAN TO SAN ROQUE, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱118.8M | 25% | High risk93 | Flagged0.021 |
| 25LI0081CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO AGUSAN RIVER, SAN JOSE TO BANKERUHAN SUR, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱118.8M | 32% | High risk93 | Flagged0.016 |
| 25LI0085CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO AGUSAN RIVER, BANKERUHAN NORTE TO TAPIA, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱118.7M | 50% | High risk93 | Flagged0.010 |
| 25LD0025CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- BANSALAN- MT. APO NAT'L PARK RD- K1589+970-K1589+1030, K1603+177- K1603+500, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱41.7M | 25% | High risk92 | Flagged0.019 |
| 24LA0149CONSTRUCTION OF ROAD (BARANGAY KIOKMAY TO BARANGAY AGUINALDO) LAAK, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.3M | 90% | High risk91 | Flagged0.067 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LB0118CONSTRUCTION OF 4STY20CL AT F. BUSTAMANTE NHS, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | On-Going | ₱86M | 89% | High risk88 | Flagged0.071 |
| 24LA0149CONSTRUCTION OF ROAD (BARANGAY KIOKMAY TO BARANGAY AGUINALDO) LAAK, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.3M | 90% | High risk91 | Flagged0.067 |
| 24LD0213CONSTRUCTION OF CONCRETE REVETMENT ALONG PADADA-MAINIT RIVER (RIGHT SIDE DOWNSTREAM SECTION, PACKAGE A), HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱93.6M | 93% | High risk88 | Flagged0.067 |
| 24L00327DESIGN AND CONSTRUCTION OF NEDA XI REGIONAL GOVERNANCE COMPLEX - PHASE 1 (2-STOREY NEDA OFFICE BUILDING), REGIONAL GOVERNMENT CENTER BAGO OSHIRO, DAVAO CITY | Region XI | Region XI | On-Going | ₱57.6M | 95% | High risk88 | Flagged0.062 |
| 24L00290DAVAO DEL SUR STATE COLLEGE - CONSTRUCTION OF 26 CLASSROOM NEW ICET BUILDING | Region XI | Region XI | On-Going | ₱49.2M | 89% | High risk86 | Flagged0.061 |
| 24LA0157CONSTRUCTION OF ROAD, BARANGAY NEW BETHLEHEM, LAAK, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.8M | 87% | High risk89 | Flagged0.060 |
| 24LB0126CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING IN J.P. LAUREL ELEMENTARY SCHOOL, BARANGAY 12-B, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱39.5M | 85% | High risk86 | Flagged0.060 |
| 24L00203DESIGN AND CONSTRUCTION OF MULTI-PURPOSE BUILDING (DSWD WAREHOUSE), BARANGAY LA FILIPINA, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱191.1M | 57% | High risk79 | Flagged0.048 |
| 25LJ0105CONSTRUCTION OF ROAD, PHASE 2, BARANGAY SAN ISIDRO, BABAK DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱94.9M | 28% | High risk96 | Flagged0.040 |
| 25LF0141CONSTRUCTION OF ROAD, FROM JUNCTION SAKUAN TO BARANGAY ALVAR TO SITIO BANTOLINAO BARANGAY PALMA GIL TO SITIO BANTOLINAO, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.1M | 50% | High risk96 | Flagged0.040 |
| 25LF0142CONSTRUCTION OF ROAD, FROM JUNCTION TO SITIO CABYAWAN BARANGAY MERCEDES, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95M | 54% | High risk96 | Flagged0.039 |
| 25LF0144CONSTRUCTION OF ROAD, LAMIAWAN-SANGAB ROAD, BARANGAY PICHON CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95M | 56% | High risk96 | Flagged0.039 |
| 23L00199CONSTRUCTION OF ROAD, JUNCTION IGACOS CIRCUMFERENTIAL ROAD, BARANGAY CAMUDMUD TO BARANGAY SAN ISIDRO, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱96.2M | 77% | High risk80 | Flagged0.033 |
| 23LB0096CONSTRUCTION OF BRIDGE, BARANGAY PAQUIBATO PROPER TO BARANGAY PARADISE EMBAK, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱124.2M | 94% | High risk80 | Flagged0.029 |
| 23LB0036RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. DAANG MAHARLIKA ROAD - PALM DRIVE - PAG-ASA ST. - DUMANLAS ROAD - JCT. DC DIVERSION ROAD, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱36.9M | 81% | High risk72 | Flagged0.025 |
| 25LI0079CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CABANBANAN RIVER LEADING TO AGUSAN RIVER, BANTACAN TO SAN ROQUE, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱118.8M | 25% | High risk93 | Flagged0.021 |
| 25LI0045CONCRETING OF PUROK-12 TO PUROK-13, BRGY. CAMANLANGAN FMR, BRGY. CAMANLANGAN, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱19.8M | 62% | Medium risk46 | Flagged0.020 |
| 25LD0025CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- BANSALAN- MT. APO NAT'L PARK RD- K1589+970-K1589+1030, K1603+177- K1603+500, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱41.7M | 25% | High risk92 | Flagged0.019 |
| 25LK0030CONSTRUCTION OF ROAD, SITIO MELUYA, BARANGAY MALABOG, PAQUIBATO DISTRICT TO SITIO POLOCON, BARANGAY LAMANAN (MALABOG SECTION), DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱80.2M | 82% | High risk95 | Flagged0.018 |
| 25L00034REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K1494+731 - K1495+420, DAVAO CITY | Region XI | Region XI | On-Going | ₱31.1M | 80% | High risk94 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 20LA0282CONSTRUCTION OF MULTI-PURPOSE BUILDING (WOMEN'S CENTER) BRGY. CABIDIANAN NABUNTURAN COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱9.7M | 100% | Medium risk45 | —-0.085 |
| 177 | 20LA0024CONSTRUCTION OF BACHELOR OFFICERS QUARTERS, CP GEN MANUEL T YAN SR, BRGY. TUBURAN, MAWAB COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱13.6M | 100% | Medium risk45 | —-0.087 |
| 178 | 20LA0207CONSTRUCTION OF FEMALE BARRACKS, CP. GEN. MANUEL T. YAN SR., BRGY. TUBURAN, MAWAB COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.088 |
| 179 | 24LH0081COMPLETION OF MULTI-PURPOSE BUILDING (SOM BUILDING) PHASE 1 AND 2, UNIVERSITY OF THE PHILIPPINES (UP) MINDANAO, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.092 |
| 180 | 21LB0220CONSTRUCTION OF BARRACKS FOR PRESIDENTIAL CREW, TACTICAL OPERATIONS WING EASTERN MINDANAO (TOWEASTMIN), OLD AIRPORT, BRGY. SASA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱7.7M | 100% | Medium risk44 | —-0.085 |
| 181 | 24LI0075CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PUROK 2 CREEK, GABI, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.067 |
| 182 | 20L00057CONSTRUCTION OF POLICE STATION 12 BUILDING, MARILOG, DAVAO CITY | Region XI | Region XI | Completed | ₱8.8M | 100% | Medium risk44 | —-0.092 |
| 183 | 22LB0197CONSTRUCTION OF DRAINAGE CANALS, COLMAN TO SAN MIGUEL, CENTRO (SAN JUAN), AGDAO DISTRICT, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.067 |
| 184 | 22LB0198IMPROVEMENT OF DRAINAGE CANAL, PUROK 4 TO PUROK 8, LAPU-LAPU, AGDAO DISTRICT, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.072 |
| 185 | 20LB0075CONSTRUCTION OF DRAINAGE ALONG GOSPEL ST.- JCT. R.CASTILLO ST., DAVAO CITY | Region XI | Davao City DEO | Completed | ₱14M | 100% | Medium risk44 | —-0.075 |
| 186 | 21LC0186CONSTRUCTION OF LINED CANAL LEADING TO OUTFALL PROTECTING NATIONAL RD. (DAANG MAHARLIKA) ALONG MAGDUM SECTION, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.074 |
| 187 | 23L00120CONSTRUCTION OF MULTI-PURPOSE BUILDING (PDEA), BARANGAY PEÑAPLATA, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱4.9M | 100% | Medium risk43 | —-0.089 |
| 188 | 22LC0120CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY QUEZON, PANABO CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱5M | 100% | Medium risk43 | —-0.091 |
| 189 | 22LB0239CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN JOSE, BARANGAY SASA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱5.9M | 100% | Medium risk43 | —-0.085 |
| 190 | 22LC0159CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MAGUGPO NORTH, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.089 |
| 191 | 20LA0185CONSTRUCTION OF MULTI-PURPOSE BLDG. (BRGY. HALL) MABUHAY, LAAK, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱5.8M | 100% | Medium risk43 | —-0.089 |
| 192 | 23LC0044CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT SUA-ON NATIONAL HIGH SCHOOL, BARANGAY SUA-ON, KAPALONG, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱5.9M | 100% | Medium risk43 | —-0.090 |
| 193 | 24LI0076CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.081 |
| 194 | 20LA0204CONSTRUCTION OF MULTI-PURPOSE BLDG. (BRGY. HALL) NEW BETHLEHEM, LAAK COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱5.8M | 100% | Medium risk43 | —-0.088 |
| 195 | 22LB0075CONSTRUCTION (COMPLETION) OF EVACUATION CENTER AT BARANGAY 4-A, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | Completed | ₱5M | 100% | Medium risk43 | —-0.090 |
| 196 | 22L00169CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF FACILITIES FOR PERSONS WITH DISABILITIES (PWD) AND ELDERLIES/SENIOR CITIZENS, INCLUDING GENDER-RESPONSIVE FACILITIES (PROVISION OF TWO (2) ELEVATORS FOR ADMINISTRATIVE AND FINANCIAL BUILDING) R. MAGSAYSAY AVENU | Region XI | Region XI | Completed | ₱4.8M | 100% | Medium risk43 | —-0.088 |
| 197 | 22LC0114CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAGWAWA, SANTO TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱5M | 100% | Medium risk43 | —-0.093 |
| 198 | 20LA0244CONSTRUCTION OF MULTI-PURPOSE BUILDING (OFFICER & PERSONNEL QUARTER MIB) TUBURAN 10TH DIVISION PHILIPPINE ARMY, MAWAB COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱5.9M | 100% | Medium risk43 | —-0.088 |
| 199 | 22KB0123CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAWAS, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.092 |
| 200 | 23LB0135CONCRETING OF BRGY. COLOSAS FMR, BRGY. COLOSAS, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱11.8M | 100% | Medium risk41 | —-0.037 |