Contractor dossier
263 projects on file, including joint ventures this contractor is part of.
Total projects
263
Total budget
₱12B
Average progress
90.3%
Completion rate
67.7%
Below 70%
Average risk score
48.9
Medium risk on average, out of 100
Flagged as unusual
35
13.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 231 | ₱9B | 47.6 | 34 | 89.3% |
| Region X | 18 | ₱1.6B | 58.3 | 0 | 97.7% |
| Region II | 4 | ₱386M | 54.7 | 0 | 100.0% |
| Cordillera Administrative Region | 3 | ₱272.2M | 57.4 | 0 | 93.2% |
| Negros Island Region | 2 | ₱193M | 70.5 | 0 | 100.0% |
| Region III | 2 | ₱193M | 62.2 | 0 | 100.0% |
| Region XII | 2 | ₱192.1M | 40.3 | 0 | 100.0% |
| Region XIII | 1 | ₱144.3M | 94.2 | 1 | 96.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 89 | ₱3.9B | 45.4 | 3 | 83.6% |
| Buildings and Facilities | 68 | ₱710.5M | 32.2 | 1 | 98.0% |
| Flood Control and Drainage | 51 | ₱4.3B | 56.4 | 1 | 96.7% |
| OTHER | 17 | ₱1.1B | 79.4 | 14 | 89.5% |
| Water Provision and Storage | 10 | ₱33.8M | 26.0 | 0 | 98.9% |
| GAA 2025 SSP | 9 | ₱635.4M | 95.4 | 9 | 70.2% |
| GAA 2025 OO-2 | 8 | ₱929.9M | 93.4 | 5 | 69.6% |
| Bridges | 7 | ₱39.8M | 33.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱185.9M | 92.9 | 2 | 61.0% |
| Bridges, Roads | 2 | ₱165.4M | 62.6 | 0 | 99.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0142CONSTRUCTION OF ROAD, FROM JUNCTION TO SITIO CABYAWAN BARANGAY MERCEDES, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95M | 54% | High risk96 | Flagged0.039 |
| 25LF0141CONSTRUCTION OF ROAD, FROM JUNCTION SAKUAN TO BARANGAY ALVAR TO SITIO BANTOLINAO BARANGAY PALMA GIL TO SITIO BANTOLINAO, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.1M | 50% | High risk96 | Flagged0.040 |
| 25LF0144CONSTRUCTION OF ROAD, LAMIAWAN-SANGAB ROAD, BARANGAY PICHON CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95M | 56% | High risk96 | Flagged0.039 |
| 25LJ0105CONSTRUCTION OF ROAD, PHASE 2, BARANGAY SAN ISIDRO, BABAK DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱94.9M | 28% | High risk96 | Flagged0.040 |
| 25LK0027CONSTRUCTION OF ROAD, SITIO TABUAN, BARANGAY MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱47.8M | 92% | High risk95 | Flagged0.008 |
| 25LK0030CONSTRUCTION OF ROAD, SITIO MELUYA, BARANGAY MALABOG, PAQUIBATO DISTRICT TO SITIO POLOCON, BARANGAY LAMANAN (MALABOG SECTION), DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱80.2M | 82% | High risk95 | Flagged0.018 |
| 25LK0023CONSTRUCTION OF ROAD, SITIO GATUNGON TO SABANG SITA, BARANGAY TAPAK, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 90% | High risk95 | Flagged0.011 |
| 25LI0036REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, DNAS ROAD AT TABUNAN - TRIBAL VILLAGE, BARANGAY PROSPERIDAD, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱29.4M | 100% | High risk95 | Flagged0.008 |
| 25NG0035SURIGAO - DAVAO COASTAL RD - K1149+000 - K1150+300, K1152+000 - K1154+000, K1174+305 - K1175+405, K1182+000 - K1182+900, PLACER-GIGAQUIT-CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱144.3M | 97% | High risk94 | Flagged0.011 |
| 25L00034REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K1494+731 - K1495+420, DAVAO CITY | Region XI | Region XI | On-Going | ₱31.1M | 80% | High risk94 | Flagged0.017 |
| 25LK0009CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA. 5 + 900 - STA. 6 + 200, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱95.5M | 93% | High risk94 | —-0.005 |
| 25LK0011CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA.7+100 - STA. 7+400, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱95.5M | 93% | High risk94 | —-0.005 |
| 25LK0012CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA. 7 + 700 - STA. 8 + 000, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱95.5M | 98% | High risk94 | —-0.007 |
| 25LI0083CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, DOWNSTREAM OF AUNAN CREEK JUNCTION, PHASE 1, BARANGAY BABAG, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱142.6M | 74% | High risk93 | Flagged0.012 |
| 25LI0018CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANAT RIVER R/S, MANAT BRIDGE DOWNSTREAM R/S, LEADING TO AGUSAN RIVER, PHASE 2, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱144.5M | 93% | High risk93 | Flagged0.004 |
| 25LI0079CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CABANBANAN RIVER LEADING TO AGUSAN RIVER, BANTACAN TO SAN ROQUE, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱118.8M | 25% | High risk93 | Flagged0.021 |
| 25LI0081CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO AGUSAN RIVER, SAN JOSE TO BANKERUHAN SUR, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱118.8M | 32% | High risk93 | Flagged0.016 |
| 25LI0085CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO AGUSAN RIVER, BANKERUHAN NORTE TO TAPIA, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱118.7M | 50% | High risk93 | Flagged0.010 |
| 25LD0025CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- BANSALAN- MT. APO NAT'L PARK RD- K1589+970-K1589+1030, K1603+177- K1603+500, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱41.7M | 25% | High risk92 | Flagged0.019 |
| 24LA0149CONSTRUCTION OF ROAD (BARANGAY KIOKMAY TO BARANGAY AGUINALDO) LAAK, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.3M | 90% | High risk91 | Flagged0.067 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LB0118CONSTRUCTION OF 4STY20CL AT F. BUSTAMANTE NHS, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | On-Going | ₱86M | 89% | High risk88 | Flagged0.071 |
| 24LA0149CONSTRUCTION OF ROAD (BARANGAY KIOKMAY TO BARANGAY AGUINALDO) LAAK, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.3M | 90% | High risk91 | Flagged0.067 |
| 24LD0213CONSTRUCTION OF CONCRETE REVETMENT ALONG PADADA-MAINIT RIVER (RIGHT SIDE DOWNSTREAM SECTION, PACKAGE A), HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱93.6M | 93% | High risk88 | Flagged0.067 |
| 24L00327DESIGN AND CONSTRUCTION OF NEDA XI REGIONAL GOVERNANCE COMPLEX - PHASE 1 (2-STOREY NEDA OFFICE BUILDING), REGIONAL GOVERNMENT CENTER BAGO OSHIRO, DAVAO CITY | Region XI | Region XI | On-Going | ₱57.6M | 95% | High risk88 | Flagged0.062 |
| 24L00290DAVAO DEL SUR STATE COLLEGE - CONSTRUCTION OF 26 CLASSROOM NEW ICET BUILDING | Region XI | Region XI | On-Going | ₱49.2M | 89% | High risk86 | Flagged0.061 |
| 24LA0157CONSTRUCTION OF ROAD, BARANGAY NEW BETHLEHEM, LAAK, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.8M | 87% | High risk89 | Flagged0.060 |
| 24LB0126CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING IN J.P. LAUREL ELEMENTARY SCHOOL, BARANGAY 12-B, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱39.5M | 85% | High risk86 | Flagged0.060 |
| 24L00203DESIGN AND CONSTRUCTION OF MULTI-PURPOSE BUILDING (DSWD WAREHOUSE), BARANGAY LA FILIPINA, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱191.1M | 57% | High risk79 | Flagged0.048 |
| 25LJ0105CONSTRUCTION OF ROAD, PHASE 2, BARANGAY SAN ISIDRO, BABAK DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱94.9M | 28% | High risk96 | Flagged0.040 |
| 25LF0141CONSTRUCTION OF ROAD, FROM JUNCTION SAKUAN TO BARANGAY ALVAR TO SITIO BANTOLINAO BARANGAY PALMA GIL TO SITIO BANTOLINAO, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95.1M | 50% | High risk96 | Flagged0.040 |
| 25LF0142CONSTRUCTION OF ROAD, FROM JUNCTION TO SITIO CABYAWAN BARANGAY MERCEDES, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95M | 54% | High risk96 | Flagged0.039 |
| 25LF0144CONSTRUCTION OF ROAD, LAMIAWAN-SANGAB ROAD, BARANGAY PICHON CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱95M | 56% | High risk96 | Flagged0.039 |
| 23L00199CONSTRUCTION OF ROAD, JUNCTION IGACOS CIRCUMFERENTIAL ROAD, BARANGAY CAMUDMUD TO BARANGAY SAN ISIDRO, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱96.2M | 77% | High risk80 | Flagged0.033 |
| 23LB0096CONSTRUCTION OF BRIDGE, BARANGAY PAQUIBATO PROPER TO BARANGAY PARADISE EMBAK, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱124.2M | 94% | High risk80 | Flagged0.029 |
| 23LB0036RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. DAANG MAHARLIKA ROAD - PALM DRIVE - PAG-ASA ST. - DUMANLAS ROAD - JCT. DC DIVERSION ROAD, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱36.9M | 81% | High risk72 | Flagged0.025 |
| 25LI0079CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CABANBANAN RIVER LEADING TO AGUSAN RIVER, BANTACAN TO SAN ROQUE, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱118.8M | 25% | High risk93 | Flagged0.021 |
| 25LI0045CONCRETING OF PUROK-12 TO PUROK-13, BRGY. CAMANLANGAN FMR, BRGY. CAMANLANGAN, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱19.8M | 62% | Medium risk46 | Flagged0.020 |
| 25LD0025CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- BANSALAN- MT. APO NAT'L PARK RD- K1589+970-K1589+1030, K1603+177- K1603+500, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱41.7M | 25% | High risk92 | Flagged0.019 |
| 25LK0030CONSTRUCTION OF ROAD, SITIO MELUYA, BARANGAY MALABOG, PAQUIBATO DISTRICT TO SITIO POLOCON, BARANGAY LAMANAN (MALABOG SECTION), DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱80.2M | 82% | High risk95 | Flagged0.018 |
| 25L00034REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K1494+731 - K1495+420, DAVAO CITY | Region XI | Region XI | On-Going | ₱31.1M | 80% | High risk94 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 20L00191CONSTRUCTION OF PUROK 9 BRIDGE, BRGY. SERAWAN, DAVAO CITY, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱10.2M | 100% | Medium risk41 | —-0.025 |
| 202 | 24LI0104CONSTRUCTION OF 1 UNIT OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN CORONOBE INTEGRATED SCHOOL, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱18.3M | 100% | Medium risk40 | Flagged0.002 |
| 203 | 23LI0124CONSTRUCTION OF 2STY4CL, MAGTAYA ES, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱18.2M | 100% | Medium risk40 | —-0.036 |
| 204 | 23M00010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE -PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO- BUKIDNON RD - K1684 + 440 - K1684 + 640, ARAKAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱96M | 100% | Medium risk40 | —-0.077 |
| 205 | 23M00009CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE -PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO- BUKIDNON RD - K1684 + 240 - K1684 + 440, PRESIDENT ROXAS, NORTH COTABATO | Region XII | Region XII | Completed | ₱96M | 100% | Medium risk40 | —-0.077 |
| 206 | 23LI0128CONSTRUCTION OF 2STY4CL, MAGANGIT INTEGRATED SCHOOL, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱17.9M | 100% | Medium risk40 | —-0.034 |
| 207 | 19LC0470COMPLETION OF BRAULIO E. DUJALI MUNICIPAL CEMETERY, PUROK 3B, NEW CASAY, B.E. DUJALI, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱10M | 100% | Medium risk39 | —-0.045 |
| 208 | 23LB0164REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. PAMPANGA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱4.8M | 100% | Medium risk39 | —-0.043 |
| 209 | 23LI0133CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (FIRE STATION) AT CABINUANGAN, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱9.6M | 100% | Medium risk39 | —-0.038 |
| 210 | 24L00080INSTALLATION/APPLICATION OF SIGNAGE - WARNING, ADVISORY AND REGULATORY SIGNS, PAVEMENT MARKINGS, AND PEDESTRIAN ISLAND ALONG DAANG MAHARLIKA (MN) (S00060MN) - K1457+831 - K1458+818, VISAYAN VILLAGE, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱4.5M | 87% | Low risk22 | —-0.045 |
| 211 | 22L00193CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) AT TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱2.7M | 100% | Low risk22 | —-0.049 |
| 212 | 20LA0336CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RCWS) 1. COMPOSTELA VALLEY STATE COLLEGE, COMPOSTELA 2. COMPOSTELA VALLEY SPORTS COMPLEX, COMPOSTELA 3. TANDAWAN ELEMENTARY SCHOOL, NEW BATAAN 4. TANDAWAN NATIONAL HIGH SCHOOL, NEW BATAAN | Region XI | Davao de Oro 1st DEO | Completed | ₱4.1M | 100% | Low risk22 | —-0.046 |
| 213 | 20LA0338CONSTRUCTION OF WATER SYSTEM, PUROK NAGAS, TAMBONGON, PANTUKAN, COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱2.9M | 100% | Low risk22 | —-0.049 |
| 214 | 19LC0462CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) 1. @ MESAOY NATIONAL HIGH SCHOOL, NEW CORELLA, DAVAO DEL NORTE, 2. @ SILANGAN ELEMENTARY SCHOOL, NEW CORELLA, DAVAO DEL NORTE, 3. @ NEW BALAMBAN ELEMENTARY SCHOOL, TAGUM CITY, DAVAO DEL NORTE, ET. AL. | Region XI | Davao del Norte DEO | Completed | ₱3.6M | 100% | Low risk21 | —-0.052 |
| 215 | 21LC0277CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM | Region XI | Davao del Norte DEO | Completed | ₱4.4M | 100% | Low risk21 | —-0.049 |
| 216 | 23L00113PROJECT CONVERGENCE 3 - CH 26 + 500 LEADING TO PANABO STATION, PANABO CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱4.2M | 100% | Low risk21 | —-0.088 |
| 217 | 21LC0036NRJ TAGUM - PANABO ROAD PAG-ASA (KAPALONG) ROAD - KIMAMON (STO. TOMAS) - LUNGA-OG ROAD, SALVACION - SAN MIGUEL STO. TOMAS ROAD CONNECTING PANABO WHARF TO BANANA INDUSTRIES, KAPALONG, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱4.4M | 100% | Low risk21 | —-0.089 |
| 218 | 21LB0096PREVENTIVE MAINTENANCE - ASPHALT OVERLAY - L GARCIA ST. - K1508+(-113) - K1508+(-012) | Region XI | Davao City DEO | Completed | ₱4.2M | 100% | Low risk21 | —-0.086 |
| 219 | 21LB0095PREVENTIVE MAINTENANCE - ASPHALT OVERLAY - L GARCIA ST. - (S01456MN) CHAINAGE 647 - CHAINAGE 748 | Region XI | Davao City DEO | Completed | ₱4.4M | 100% | Low risk21 | —-0.087 |
| 220 | 23LI0077CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) 2ND DISTRICT ENGINEERING OFFICE, COMPOSTELA, DAVAO DE ORO A. LINOAN ELEMENTARY SCHOOL, BRGY. LINOAN, MONTEVISTA, DAVAO DE ORO B. MONTEVISTA NATIONAL HIGH SCHOOL, MONTEVISTA, DAVAO DE ORO C. NEW | Region XI | Davao de Oro 2nd DEO | Completed | ₱2.3M | 100% | Low risk20 | —-0.048 |
| 221 | 24L00079INSTALLATION/APPLICATION OF SIGNAGE - WARNING, ADVISORY AND REGULATORY SIGNS AND PAVEMENT MARKINGS ALONG DAANG MAHARLIKA (MN) (S00060MN) - K1456 + 731 - K1457 + 781, VISAYAN VILLAGE, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱1.1M | 100% | Low risk20 | —-0.053 |
| 222 | 20LC0095CONSTRUCTION OF WATER SYSTEM-LEVEL II/III, BRGY. KIOTOY, PANABO CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱2.5M | 100% | Low risk20 | —-0.056 |
| 223 | 23L00100SITIO PASOG - LICUP - TAGBITAN-AG - SITIO TAGLUNO ROAD LEADING TO PUTING BATO AND CANIBAD RESORT, BRGY. AUNDANAO, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱2.4M | 100% | Low risk20 | —-0.084 |
| 224 | 21LB0160CONCRETING OF ROAD, PUROK 11, BARANGAY COMMUNAL, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱2M | 100% | Low risk19 | —-0.088 |
| 225 | 21LB0161CONCRETING OF ROAD, PUROK 8, BARANGAY COMMUNAL, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱2M | 100% | Low risk19 | —-0.089 |