Opening the dossier…
Opening the dossier…
Contractor dossier
96 projects on file, including joint ventures this contractor is part of.
Total projects
96
Total budget
₱4.4B
Average progress
83.7%
Completion rate
59.4%
Below 70%
Average risk score
55.3
Medium risk on average, out of 100
Flagged as unusual
16
16.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 56 | ₱2.4B | 50.6 | 5 | 88.0% |
| Region I | 16 | ₱845.9M | 72.2 | 8 | 68.9% |
| Region VIII | 13 | ₱301.1M | 52.5 | 1 | 88.6% |
| Region III | 5 | ₱595.5M | 63.8 | 1 | 55.9% |
| Region IV-B | 4 | ₱187.2M | 45.2 | 0 | 100.0% |
| Region IV-A | 2 | ₱166.4M | 67.1 | 1 | 87.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 41 | ₱2.1B | 52.5 | 3 | 93.8% |
| Roads | 25 | ₱585.3M | 44.6 | 0 | 87.2% |
| Buildings and Facilities | 19 | ₱833.2M | 60.6 | 6 | 64.6% |
| OTHER | 4 | ₱296.6M | 69.5 | 4 | 67.8% |
| GAA 2025 OO-2 | 3 | ₱327.5M | 91.4 | 1 | 76.0% |
| Bridges | 2 | ₱191M | 71.1 | 0 | 88.5% |
| GAA 2025 SSP | 1 | ₱18.9M | 95.7 | 1 | 75.7% |
| GAA 2025 OO-1 | 1 | ₱48.9M | 94.8 | 1 | 29.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00109SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF CONCRETE BRIDGE, SITIO BATO, BARANGAY 34, ISIC-ISIC, VINTAR, ILOCOS NORTE | Region I | Region I | On-Going | ₱18.9M | 76% | High risk96 | Flagged0.028 |
| 25IA0029NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1109+364-K1110+542 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 29% | High risk95 | Flagged0.008 |
| 25AA0034FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱140.4M | 70% | High risk92 | Flagged0.022 |
| 25OA0021CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 3, BARANGAY DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱93.6M | 75% | High risk91 | —-0.010 |
| 25OA0022CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 4, BARANGAY DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱93.6M | 83% | High risk91 | —-0.011 |
| 23A00293CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT WITH GABION FOOTING PROTECTION ALONG PASUQUIN RIVER REVETMENT, BARANGAY SULVEC, PASUQUIN, ILOCOS | Region I | Region I | On-Going | ₱96.5M | 88% | High risk82 | Flagged0.031 |
| 24C00300FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (RIGHT SIDE), MEYCAUAYAN CITY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱170.2M | 79% | High risk80 | Flagged0.001 |
| 24C00299FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (RIGHT SIDE), MEYCAUAYAN CITY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱170.2M | 81% | High risk80 | —-0.000 |
| 23D00062CONSTRUCTION OF TAYTAY SPORTS COMPLEX, TAYTAY, RIZAL (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱94.1M | 75% | High risk76 | Flagged0.012 |
| 23AA0400CONSTRUCTION OF MULTI PURPOSE BUILDING (GUESTHOUSE WITH FITNESS GYM AND CONFERENCE HALL), CAMP VALENTINE, BRGY. 23, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.2M | 86% | High risk72 | —-0.025 |
| 24AA0152SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE CONNECTING BARANGAY ALSEM AND BARANGAY DIPILAT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱94.5M | 77% | High risk72 | —-0.001 |
| 24AA0391BIP - MULTIPURPOSEBUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES:CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM),MMSU LAB. HIGH, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24.7M | 64% | High risk72 | —-0.027 |
| 23AA0465CONSTRUCTION OF DEPARTMENT OF INFORMATION AND COMMUNICATION TECHNOLOGY-REGION 1, ILOCOS NORTE PROVINCIAL OFFICE BUILDING, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱21.6M | 100% | High risk71 | —-0.033 |
| 23AA0363CONSTRUCTION OF MULTI-PURPOSE BUILDING (GRANDSTAND) BARANGAY 23, CAMP VALENTINE, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.8M | 100% | High risk71 | —-0.081 |
| 23A00287SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BRIDGE, BARANGAY DAGUPAN, VINTAR, ILOCOS NORTE | Region I | Region I | Completed | ₱96.5M | 100% | High risk71 | —-0.023 |
| 24AA0126CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN AND TRIBUTARIES, BARANGAY CAVIT, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk70 | —-0.065 |
| 23OA0072CONSTRUCTION OF PUMPING STATION IN BRGY. MUSON(PHASE 1), MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱96.5M | 97% | High risk68 | Flagged0.009 |
| 25AA0573CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (DPWH BUILDING), PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24M | 26% | High risk67 | Flagged0.001 |
| 24AA0469CONSTRUCTIONOF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN MARIANOMARCOS LABORATORY ELEMENTARY SCHOOL, BARANGAY 5,LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱35.1M | 34% | High risk67 | Flagged0.029 |
| 25AA0166FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN AND TRIBUTARIES, UPSTREAM OF CAVIT BRIDGE, BARANGAY CAVIT, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.1M | 81% | High risk66 | —-0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00608DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - GOVERNOR ROQUE B. ABLAN SR. MEMORIAL HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱48.8M | 0% | Medium risk57 | Flagged0.056 |
| 23A00293CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT WITH GABION FOOTING PROTECTION ALONG PASUQUIN RIVER REVETMENT, BARANGAY SULVEC, PASUQUIN, ILOCOS | Region I | Region I | On-Going | ₱96.5M | 88% | High risk82 | Flagged0.031 |
| 19O00062REPAIR AND RENOVATION OF ONE (1) FIVE (5) STOREY BUILDING WITH MEZZANINE, DICT COMPOUND, A. ROCES AVENUE, QUEZON CITY, | National Capital Region | National Capital Region | On-Going | ₱111.4M | 98% | High risk63 | Flagged0.029 |
| 24AA0469CONSTRUCTIONOF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN MARIANOMARCOS LABORATORY ELEMENTARY SCHOOL, BARANGAY 5,LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱35.1M | 34% | High risk67 | Flagged0.029 |
| 25A00109SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF CONCRETE BRIDGE, SITIO BATO, BARANGAY 34, ISIC-ISIC, VINTAR, ILOCOS NORTE | Region I | Region I | On-Going | ₱18.9M | 76% | High risk96 | Flagged0.028 |
| 25AA0034FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱140.4M | 70% | High risk92 | Flagged0.022 |
| 24OA0066CONSTRUCTION OF DRAINAGE SYSTEM ALONG C-4 ROAD, MALABON CITY, PHASE II | National Capital Region | Malabon-Navotas DEO | On-Going | ₱9.5M | 11% | Medium risk52 | Flagged0.018 |
| 23D00062CONSTRUCTION OF TAYTAY SPORTS COMPLEX, TAYTAY, RIZAL (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱94.1M | 75% | High risk76 | Flagged0.012 |
| 23OA0072CONSTRUCTION OF PUMPING STATION IN BRGY. MUSON(PHASE 1), MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱96.5M | 97% | High risk68 | Flagged0.009 |
| 24OA0099CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TULLAHAN RIVER, BARANGAY MAYSILO, MALABON CITY (PHASE 2) | National Capital Region | Malabon-Navotas DEO | On-Going | ₱48.2M | 85% | Medium risk57 | Flagged0.008 |
| 25IA0029NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1109+364-K1110+542 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 29% | High risk95 | Flagged0.008 |
| 24OA0098CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TULLAHAN RIVER, BARANGAY MAYSILO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱48.2M | 91% | Medium risk56 | Flagged0.007 |
| 23AA0517CONSTRUCTION OF MULTI-PURPOSE BUILDING (CAMP VALENTINE), BRGY. 23, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.5M | 98% | High risk65 | Flagged0.006 |
| 25A00522BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, UNIVERSITY GRANDSTAND, MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Region I | On-Going | ₱91.2M | 3% | High risk64 | Flagged0.004 |
| 24C00300FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (RIGHT SIDE), MEYCAUAYAN CITY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱170.2M | 79% | High risk80 | Flagged0.001 |
| 25AA0573CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (DPWH BUILDING), PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24M | 26% | High risk67 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25A00109SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF CONCRETE BRIDGE, SITIO BATO, BARANGAY 34, ISIC-ISIC, VINTAR, ILOCOS NORTE | Region I | Region I | On-Going | ₱18.9M | 76% | High risk96 | Flagged0.028 |
| 2 | 25IA0029NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1109+364-K1110+542 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 29% | High risk95 | Flagged0.008 |
| 3 | 25AA0034FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱140.4M | 70% | High risk92 | Flagged0.022 |
| 4 | 25OA0021CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 3, BARANGAY DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱93.6M | 75% | High risk91 | —-0.010 |
| 5 | 25OA0022CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 4, BARANGAY DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱93.6M | 83% | High risk91 | —-0.011 |
| 6 | 23A00293CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT WITH GABION FOOTING PROTECTION ALONG PASUQUIN RIVER REVETMENT, BARANGAY SULVEC, PASUQUIN, ILOCOS | Region I | Region I | On-Going | ₱96.5M | 88% | High risk82 | Flagged0.031 |
| 7 | 24C00300FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (RIGHT SIDE), MEYCAUAYAN CITY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱170.2M | 79% | High risk80 | Flagged0.001 |
| 8 | 24C00299FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (RIGHT SIDE), MEYCAUAYAN CITY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱170.2M | 81% | High risk80 | —-0.000 |
| 9 | 23D00062CONSTRUCTION OF TAYTAY SPORTS COMPLEX, TAYTAY, RIZAL (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱94.1M | 75% | High risk76 | Flagged0.012 |
| 10 | 23AA0400CONSTRUCTION OF MULTI PURPOSE BUILDING (GUESTHOUSE WITH FITNESS GYM AND CONFERENCE HALL), CAMP VALENTINE, BRGY. 23, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.2M | 86% | High risk72 | —-0.025 |
| 11 | 24AA0152SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE CONNECTING BARANGAY ALSEM AND BARANGAY DIPILAT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱94.5M | 77% | High risk72 | —-0.001 |
| 12 | 24AA0391BIP - MULTIPURPOSEBUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES:CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM),MMSU LAB. HIGH, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24.7M | 64% | High risk72 | —-0.027 |
| 13 | 23AA0465CONSTRUCTION OF DEPARTMENT OF INFORMATION AND COMMUNICATION TECHNOLOGY-REGION 1, ILOCOS NORTE PROVINCIAL OFFICE BUILDING, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱21.6M | 100% | High risk71 | —-0.033 |
| 14 | 23AA0363CONSTRUCTION OF MULTI-PURPOSE BUILDING (GRANDSTAND) BARANGAY 23, CAMP VALENTINE, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.8M | 100% | High risk71 | —-0.081 |
| 15 | 23A00287SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BRIDGE, BARANGAY DAGUPAN, VINTAR, ILOCOS NORTE | Region I | Region I | Completed | ₱96.5M | 100% | High risk71 | —-0.023 |
| 16 | 24AA0126CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN AND TRIBUTARIES, BARANGAY CAVIT, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk70 | —-0.065 |
| 17 | 23OA0072CONSTRUCTION OF PUMPING STATION IN BRGY. MUSON(PHASE 1), MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱96.5M | 97% | High risk68 | Flagged0.009 |
| 18 | 25AA0573CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (DPWH BUILDING), PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24M | 26% | High risk67 | Flagged0.001 |
| 19 | 24AA0469CONSTRUCTIONOF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN MARIANOMARCOS LABORATORY ELEMENTARY SCHOOL, BARANGAY 5,LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱35.1M | 34% | High risk67 | Flagged0.029 |
| 20 | 25AA0166FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN AND TRIBUTARIES, UPSTREAM OF CAVIT BRIDGE, BARANGAY CAVIT, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.1M | 81% | High risk66 | —-0.005 |
| 21 | 23AA0517CONSTRUCTION OF MULTI-PURPOSE BUILDING (CAMP VALENTINE), BRGY. 23, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.5M | 98% | High risk65 | Flagged0.006 |
| 22 | 25CD0172CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES,STA. 08+700 - STA. 08+875, BARANGAY CAINGIN, MEYCAUYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 62% | High risk65 | —-0.037 |
| 23 | 24OA0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. TAÑONG TO BRGY. DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱93.6M | 100% | High risk64 | —-0.077 |
| 24 | 25A00522BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, UNIVERSITY GRANDSTAND, MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Region I | On-Going | ₱91.2M | 3% | High risk64 | Flagged0.004 |
| 25 | 23OA0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 12), BRGY. MUZON MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱96.5M | 100% | High risk64 | —-0.033 |