130 projects on file, including joint ventures this contractor is part of.
Total projects
130
Total budget
₱2B
Average progress
97.4%
Completion rate
80.0%
Average risk score
43.6
Medium risk on average, out of 100
Flagged as unusual
22
16.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 127 | ₱2B | 44.2 | 22 | 97.3% |
| Region VII | 3 | ₱3.9M | 19.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 45 | ₱309.8M | 24.7 | 0 | 100.0% |
| Roads | 41 | ₱969.1M | 36.3 | 1 | 99.9% |
| GAA 2025 SSP | 24 | ₱310.2M | 94.2 | 19 | 90.2% |
| Flood Control and Drainage | 9 | ₱168.3M | 35.8 | 0 | 100.0% |
| OTHER | 5 | ₱172.7M | 68.8 | 2 | 79.9% |
| Water Provision and Storage | 3 | ₱5M | 15.2 | 0 | 100.0% |
| Bridges | 2 | ₱42.2M | 29.8 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱27.9M | 39.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NH0021CONSTRUCTION OF ROAD, PUROK 1, 4, AND 5, BARANGAY STA. CRUZ, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 95% | High risk96 | Flagged0.014 |
| 25NH0031CONSTRUCTION OF ROAD, PUROK MANGGA, SITIO SOONG, BARANGAY PURISIMA, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱14.5M | 100% | High risk96 | Flagged0.014 |
| 25NH0013CONST. OF ROAD, BRGY. MAT-E, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱29.1M | 100% | High risk95 | Flagged0.017 |
| 25NH0084CONSTRUCTION OF ROAD, BARANGAY MATICDUM, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱19M | 91% | High risk95 | Flagged0.018 |
| 25NH0073CONCRETING OF ROADS AT DIATAGON, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱23.8M | 100% | High risk95 | Flagged0.015 |
| 25NH0067CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY TIGAO, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱11.8M | 72% | High risk95 | Flagged0.024 |
| 25NH0055CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY SAN PEDRO, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.8M | 86% | High risk95 | Flagged0.015 |
| 25NH0069CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.8M | 86% | High risk95 | Flagged0.019 |
| 25NH0115CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), TAWAGAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.8M | 76% | High risk95 | Flagged0.025 |
| 25NH0098CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY BAGYANG, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.9M | 100% | High risk95 | Flagged0.009 |
| 25NH0085CONSTRUCTION OF EVACUATION CENTER SIAGAO, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.6M | 89% | High risk95 | Flagged0.015 |
| 25NH0056CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY CANCAVAN, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.6M | 95% | High risk95 | Flagged0.012 |
| 25NH0086CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN ANTONIO, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.6M | 66% | High risk95 | Flagged0.026 |
| 25NH0068CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY HINAPOYAN, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.8M | 90% | High risk95 | Flagged0.013 |
| 25NH0078REHABILITATION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), MANYAYAY, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱6.8M | 95% | High risk94 | Flagged0.016 |
| 25NH0075CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY BITAUGAN EAST, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.7M | 94% | High risk94 | Flagged0.019 |
| 25NH0094CONSTRUCTION OF ROADS AT MABAHIN, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱4.8M | 100% | High risk94 | —-0.012 |
| 25NH0077CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY LIATIMCO, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱8.6M | 77% | High risk94 | Flagged0.025 |
| 25NH0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), GAMUTON, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱6.8M | 100% | High risk93 | Flagged0.011 |
| 25NH0099COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY ANTIPOLO, MARIHATAG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱4.8M | 100% | High risk93 | —-0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NI0054CONSTRUCTION OF MULTIPURPOSE BUILDING, BARANGAY AQUINO, HINATUAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱9.6M | 54% | High risk93 | Flagged0.031 |
| 25NH0086CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN ANTONIO, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.6M | 66% | High risk95 | Flagged0.026 |
| 25NH0115CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), TAWAGAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.8M | 76% | High risk95 | Flagged0.025 |
| 25NH0077CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY LIATIMCO, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱8.6M | 77% | High risk94 | Flagged0.025 |
| 25NH0067CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY TIGAO, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱11.8M | 72% | High risk95 | Flagged0.024 |
| 25NH0069CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.8M | 86% | High risk95 | Flagged0.019 |
| 25NH0075CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY BITAUGAN EAST, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.7M | 94% | High risk94 | Flagged0.019 |
| 25NH0084CONSTRUCTION OF ROAD, BARANGAY MATICDUM, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱19M | 91% | High risk95 | Flagged0.018 |
| 25NG0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), NRJ CITY MOTORPOOL-SITIO TUMANDAY-SABANG ROAD LEADING TO LIPATA PORT/SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱88.1M | 30% | High risk76 | Flagged0.017 |
| 25NH0013CONST. OF ROAD, BRGY. MAT-E, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱29.1M | 100% | High risk95 | Flagged0.017 |
| 25NH0078REHABILITATION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), MANYAYAY, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱6.8M | 95% | High risk94 | Flagged0.016 |
| 25NH0055CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY SAN PEDRO, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.8M | 86% | High risk95 | Flagged0.015 |
| 25NH0073CONCRETING OF ROADS AT DIATAGON, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱23.8M | 100% | High risk95 | Flagged0.015 |
| 25NH0059NRJ PUROK 3 TALISAY ACCESS ROAD LEADING TO CAGWAIT WHITE BEACH PHASE II, LACTUDAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 82% | High risk77 | Flagged0.015 |
| 25NH0085CONSTRUCTION OF EVACUATION CENTER SIAGAO, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.6M | 89% | High risk95 | Flagged0.015 |
| 25NH0031CONSTRUCTION OF ROAD, PUROK MANGGA, SITIO SOONG, BARANGAY PURISIMA, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱14.5M | 100% | High risk96 | Flagged0.014 |
| 25NH0021CONSTRUCTION OF ROAD, PUROK 1, 4, AND 5, BARANGAY STA. CRUZ, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 95% | High risk96 | Flagged0.014 |
| 25NH0068CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY HINAPOYAN, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.8M | 90% | High risk95 | Flagged0.013 |
| 25NH0056CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANGAY CANCAVAN, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱9.6M | 95% | High risk95 | Flagged0.012 |
| 25NH0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), GAMUTON, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱6.8M | 100% | High risk93 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25NG0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), NRJ CITY MOTORPOOL-SITIO TUMANDAY-SABANG ROAD LEADING TO LIPATA PORT/SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱88.1M | 30% | High risk76 | Flagged0.017 |
| 27 | 16NF0150CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY SURIGAO WHARF ROAD/SURIGAO CITY, KM.1123+702 - KM.1124+041 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱6.8M | 100% | High risk74 | —-0.035 |
| 28 | 21NI0066CONCRETING OF BAYWALK ROAD, BRGY. LACASA, HINATUAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.019 |
| 29 | 17NF0179CONSTRUCTION OF BAD-AS FLOOD CONTROL / BRGY. BAD-AS, PLACER, SURIGAO DEL NORTE STA. 0+020 - 0+171 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.8M | 100% | Medium risk56 | —-0.045 |
| 30 | 23NH0051CONSTRUCTION OF FLOOD CONTROL, BARANGAY DAGOCDOC, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱96.5M | 100% | Medium risk47 | —-0.050 |
| 31 | 23NH0050SURIGAO-DAVAO COASTAL RD - K1257 + 355 - K1257 + 401, K1257 + 435 - K1259 + 000, K1260 + 022 - K1261 + 400 | Region XIII | Surigao del Sur 1st DEO | Completed | ₱92.6M | 100% | Medium risk44 | —-0.062 |
| 32 | 24NH0018SURIGAO-DAVAO COASTAL RD - K1331 + 094 - K1333 + 224, K1333 + 257 - K1335 + 011, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱131.2M | 100% | Medium risk44 | —-0.065 |
| 33 | 24NH0057NRJ PUROK 3 TALISAY ACCESS ROAD LEADING TO CAGWAIT WHITE BEACH, LACTUDAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱19.6M | 88% | Medium risk43 | —-0.003 |
| 34 | 24NH0066CONSTRUCTION OF BRIDGE LINKING AND TAG-ANONGAN OF CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 100% | Medium risk41 | —-0.016 |
| 35 | 23NH0029CONSTRUCTION OF NRJ TO BRGY. UNIDOS - BRGY. JUBANG-BRGY. SUMO-SUMO ROAD, TAGO,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱77.2M | 100% | Medium risk41 | —-0.069 |
| 36 | 18NF0043NETWORK DEVELOPMENT ROAD WIDENING OF SECONDARY NATIONAL ROADS/SURIGAO WHARF ROAD, K1125+212-K1126+515, BRGY TAFT, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱30.3M | 100% | Medium risk41 | —-0.087 |
| 37 | 18NF0022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS/BONIFACIO-POCTOY ROAD LEADING TO SURIGAO AIRPORT, SURIGAO CITY, SURIGAO DEL NORTE, K1126+346.88 - K1126+154, STA.0+004.85 - STA.0+108.41, STA.0+004.85 - STA.0+108.42 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱14M | 100% | Medium risk41 | —-0.089 |
| 38 | 23NG0083CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, NRJ CITY MOTORPOOL-SITIO TUMANDAY-SABANG ROAD LEADING TO LIPATA PORT/ SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱13.2M | 100% | Medium risk41 | —-0.089 |
| 39 | 18NH0052NRJ SDCR-CAGBO-HITAUB ACCESS ROAD LEADING TO HITAUB CAMPSITE, WATER FALLS, BIRD WATCHING & PICNIC AREA, BRGY. AWASIAN, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱27.9M | 100% | Medium risk39 | —-0.056 |
| 40 | 18NH0096CONCRETING OF TAGBALIDBID-PACPACON FMR, BRGY. TAGBALIDBID, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱47.8M | 100% | Medium risk39 | —-0.018 |
| 41 | 18NH0104CONCRETING OF HINAYHAYAN-TAWAGAN FMR,BRGY. TAWAGAN,CAGWAIT,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱49.7M | 100% | Medium risk39 | —-0.017 |
| 42 | 23NH0046CONSTRUCTION OF ROAD, BRGY. CALATNGAN, BADIANG, BITAUGAN, MUNICIPALITY OF SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱29.4M | 100% | Medium risk39 | —-0.082 |
| 43 | 20NH0082CONSTRUCTION OF BYPASS ROAD, BRGY. PAG-ANTAYAN, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱39.2M | 100% | Medium risk39 | —-0.082 |
| 44 | 21NH0073SURIGAO-DAVAO COASTAL ROAD - K1238+802 - K1240+000 | Region XIII | Surigao del Sur 1st DEO | Completed | ₱34M | 100% | Medium risk39 | —-0.084 |
| 45 | 21NG0021CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES LOCAL ACCESS ROAD LEADING TO CLAVER ECO-PARK BARANGAY PANATAO FROM BARANGAY SAPA CLAVER WOMENS ASSOCIATION SUPPLIES SITE IN SUPPORT OF WASTE RECYCLING, PROCESSING AN | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱14.6M | 100% | Medium risk39 | —-0.085 |
| 46 | 23NH0016CONSTRUCTION OF ROAD, BARANGAY CARROMATA, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱14.7M | 100% | Medium risk39 | —-0.081 |
| 47 | 25NH0093CONSTRUCTION OF ROAD, BRGY. BANAHAO, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱4.8M | 97% | Medium risk38 | —-0.047 |
| 48 | 23NH0015CONSTRUCTION OF ROAD, PUROK 6 AND 7 SITIO NOCOT TO BENONI BRIDGE,BARANGAY SACA, CARRASCAL,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱9.9M | 100% | Medium risk38 | —-0.083 |
| 49 | 19NB0071REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA ROAD, K1350+261-K1350+360, BRGY. DESAMPARADOS, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱9.2M | 100% | Medium risk38 | —-0.080 |
| 50 | 18NF0006CONSTRUCTION OF SISON RIVER CONTROL/POBLACION SISON, SURIGAO DEL NORTE, STA.0+020 - 0+138.4 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.3M | 100% | Medium risk38 | —-0.069 |